Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Meath Co Co -MH-ENV-26-01 - Stamullen Burial Ground and Playground
Closed Construction & Civil Engineering Works Open

Meath Co Co -MH-ENV-26-01 - Stamullen Burial Ground and Playground

Deadline

22 May

Construction of Stamullen Burial Ground and Playground by Meath County Council

SME fit: Medium Bid effort: Medium 📍 Meath

Construction of Stamullen Burial Ground and Playground by Meath County Council

Bidder profile

Mid-sized to large firms with public sector experience and compliance capabilities are best suited for this tender.

Risks & flags

  • Undisclosed contract value
  • Qualification gate may narrow bidder pool
  • Two-step tender process increases compliance burden

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Meath County Council
Title Meath Co Co -MH-ENV-26-01 - Stamullen Burial Ground and Playground
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 2 months
Submission deadline 2026-05-12T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Meath County Council ran this procurement for “Meath Co Co -MH-ENV-26-01 - Stamullen Burial Ground and Playground” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • s guidance and recommendations that are intended to support BS EN 13201 and to enable designers of lighting systems to comply with that standard
  • s guidance and recommendations that are intended to support BS EN 13201
  • Department of Public Expenditure, Infrastructure, Public Service Reform and Digitalisation
  • © 2025 Department of Public Expenditure, Infrastructure, Public Service Reform and Digitalisation
  • annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports
  • Persons under a contract of service or apprenticeship with the insured
  • Persons under a contract of service or apprenticeship with the insured.
  • Effecting or maintenance of insurance of or in connection with the provision of finance or advice on financial
  • steam, air, or other services, and associated apparatus and structures.
  • Works and Construction Services Contracts (AR1) published on http://constructionprocurement.gov.ie/arbitration
  • The Contractor’s agent19 in the Republic of Ireland for service of legal process is:
  • contributions, death in service contributions, sick pay contributions; and Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Property of the insured or in the insured’s custody or control other than existing premises and their contents
  • of Products and Pollution Liability. The policy must include the notation that Uisce
  • of Products and Pollution Liability. The policy must include the notation that Uisce Éireann is an Additional
  • The Contractor’s Insurance of the Works shall include cover for damage to existing water and wastewater

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.;  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be;  Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  •  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be
  •  Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event
  •  Maximum excess for Public liability: €10,00010 in respect of property damage only
  • The Contractor shall provide evidence of Motor Insurance covering all vehicles owned, leased, hired or used in connection with the Works with a third-party property damage indemnity limit of not less than €6.5 million
  • If required, the minimum indemnity limit for professional indemnity insurance shall be €1,500,000 annual aggregate limit

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • the Pricing Document is more than €500.
  • [FTS5_v2.pdf] Tender and Schedule for Public Works Contract for MINOR Building or Civil Engineering Works Designed by the Employer
  • Designed by the Employer, the Works Requirements, the Pricing Document, all as amended by any supplemental
  • [FTS5_v2.pdf] Public Works Contract for Minor Building and Civil Engineering Works
  • We submit with this Tender the completed Pricing Document and Schedule and Works Proposals which form part of

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2026-05-12T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2026-05-12T11:00:00+00:00
Date surfaced in documents Regulations 2011
Date surfaced in documents Natura 2000
Date surfaced in documents Act 2010

8. Contract terms that matter

Contract duration in the extract: 2 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • Minimum amount for interim payments, except release of retention, €50,000 14
  •  BS EN ISO 1461 Hot dip galvanized coatings on fabricated iron and steel
  • Within 3 months after receipt of the Contractor’s final statement, the Employer’s
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
  • (b) expiry of at least 21 days written notice to terminate this Tender
  • Terms used in this Tender that are defined in those documents have the same meaning in this Tender.
  • We offer to complete the Works on the terms of and in conformity with the documents referred to in the preceding

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: FTS5_v2.pdf, Where Agreed Rules of Measurement 4 is selected from the drop down menu above it shall be as amended by Supplement 1, Issue 2. Where Civil Engineering Standard Method of Measurement 4: Revised is selected from the drop down menu above it shall be the 4TH Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5.3 of the Capital Works Management Framework. Where the TII’s Requirements

[FTS5_v2.pdf, Approval Notice.pdf.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: Schedule and, Schedule for Public Works Contract for MINOR Building or Civil Engineering Works Designe, Schedule.

Can you bid?

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Named standards / methodologies

BS EN 13201

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (51)

PDF

23607-~1.PDF

8.4 MB · Specification

PDF

24074-DID-ZZ-XX-RP-O-5071-LIGHTING OUTDOOR REPORT P03 (2).pdf

1.8 MB · Specification

PDF

Caretakers Building Test 3_brirl.pdf

40.4 KB · Specification

PDF

Electrical-Services-Guidebook-for-Housing-Schemes.pdf

4.0 MB · Specification

PDF

MCC_PL Technical Specification & Requirements Final rev14_6_17.pdf

868.3 KB · Specification

PDF

Non-Domestic-Guidelines-Industrial-.pdf

4.4 MB · Specification

PDF

UDG-Full-Doc-English.pdf

4.3 MB · Specification

PDF

ZEVI EV Charging Guidelines.pdf

4.3 MB · Specification

PDF

FTS5_v2.pdf

84.5 KB · RFT / Invitation to Tender

ZIP

6-Vol C - Pricing Document.zip

2.7 MB · Pricing / BOQ / Schedule of Rates

PDF

INV 107274.pdf

20.6 KB · Pricing / BOQ / Schedule of Rates

PDF

customer-solutions-contractor-safet.pdf

959.0 KB · Contract / Agreement / Terms

PDF

esb-generation-stations---contracto.pdf

782.9 KB · Contract / Agreement / Terms

PDF

PW-CF5_Contract_v2.9_25-11-2025.pdf

804.8 KB · Contract / Agreement / Terms

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

40.7 KB · Form / Declaration / Certificate

PDF

DIVERS~1.PDF

115.4 KB · Form / Declaration / Certificate

DOCX

QW_Part_2_v1.docx

58.3 KB · Form / Declaration / Certificate

PDF

150323-M1 Wayleave.pdf

81.6 KB · Drawing / Plan / Layout

PDF

20230515-042_A3.pdf

541.3 KB · Drawing / Plan / Layout

PDF

20250120-041_A0.pdf

570.4 KB · Drawing / Plan / Layout

PDF

24074-DID-ZZ-XX-DR-C-4004-OCEMP.pdf

2.5 MB · Drawing / Plan / Layout

PDF

24074-DID-ZZ-XX-RG-C-0001-DRAWING REGISTER.pdf

230.5 KB · Drawing / Plan / Layout

PDF

25-001~1.PDF

106.8 KB · Drawing / Plan / Layout

PDF

4055-RH-111-WW-DR-C-7103.pdf

817.6 KB · Drawing / Plan / Layout

PDF

4055-RH-111-WW-DR-C-7103a.pdf

315.9 KB · Drawing / Plan / Layout

PDF

4055-RH-111-WW-DR-C-7104 (AB02).pdf

652.3 KB · Drawing / Plan / Layout

PDF

4055-RH-111-WW-DR-C-7104a (AB02).pdf

653.6 KB · Drawing / Plan / Layout

PDF

sewer.pdf

2.3 MB · Drawing / Plan / Layout

PDF

water.pdf

2.3 MB · Drawing / Plan / Layout

PDF

20171128 final public lighting policy mcc.pdf

711.1 KB · Other

PDF

23607-JBB-00-XX-RP-00001_Flood_Risk_Assessment.pdf

3.8 MB · Other

PDF

24074-DID-ZZ-XX-HS-C-4001-T01.pdf

10.5 MB · Other

PDF

Code-of-Practice-for-Avoiding-Dange.pdf

2.6 MB · Other

PDF

Code-of-Practice-for-Working-in-the-Vicinity-of-the-Transmission-Network.PDF

400.2 KB · Other

PDF

DIV253~1.PDF

212.3 KB · Other

PDF

DIV253~2.PDF

1.6 MB · Other

PDF

Guidance_on_Soil_and_Stone_By_Product.pdf

363.8 KB · Other

PDF

HABITA~1.PDF

2.2 MB · Other

PDF

How-you-can-avoid-hitting-electrica.pdf

1.0 MB · Other

PDF

Hydrogeology Report - Stamullen Burial Ground, Playground.PDF

3.4 MB · Other

PDF

Planners Report.pdf

7.5 MB · Other

PDF

Safe-Construction-with-Electricity-NEW.pdf

1.8 MB · Other

PDF

Safety Advice for working in the vi.pdf

4.2 MB · Other

DOCX

SW Stamullen 07.05.25.docx

4.4 MB · Other

PDF

12215 GPR.pdf

1.4 MB

PDF

24074_UE Connection_Stamullen.pdf

1.1 MB

PDF

8768_07012025104839.pdf

3.2 MB

PDF

Meath County Council Appropriate Assessment - Stamullen.pdf

38.1 KB

PDF

Meath County Council EIA Screening Proceedure - Stamullen.pdf

3.0 MB

PDF

Stamullen Burial Grounds 24087.pdf

261.3 KB

PDF

STAMUL~2.PDF

4.2 MB

Original notice text

Meath County Council intends to appoint a Contractor to undertake the construction of Stamullen Burial Ground and Playground. The proposed works shall include, but not limited to the following: - Burial Plots - Garden of Remembrance for Urn Plots and Columbarium Walls for the interment of Urns. - A Playground with an area of approx. 1400 m2. - Internal Access Roads and footpaths to accommodate vehicular and pedestrian access with low level Public lighting and walking access aisles. - Utilisation of the existing agricultural entrance from the Local Road L-1617-8 (Gormanston - Stamullen) with provision of a new entrance layout to include natural stone piers, gates and railings. Carparking within the development for - Car-parking spaces with Public Lighting. - A Caretaker’s building and toilet facilities inclduing a maintenance yard. - Installation of Solar PV panels on the Caretaker Building Roof. - Possible requirement for significant suitable soil importation and placement, involving considerable HGV movements - Construction of an approx. 100 m long Cast In-Situ Reinforced Concrete Retaining Wall. - Installation of Fencing, Walls, Railings and Gates. - Construction of a 400 m3 precast concrete attenuation tank. - A woodland walk comprising of natural walkways, new tree planting with access from the Burial Ground with potential access to the Delvin River Linear walk from an adjoining development.

AI analysis updated 3 months, 1 week ago

Bid ↗
Details

Deadline

22 May

View on eTenders ↗

Location

Stamullen, Ireland

Procedure

Open

Clarification

28 Apr 2026

eTenders ID

7832166

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender