Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / OQ 02/26 - EUJTF Midlands Trail Network - Trails Construction: Offaly West
Closed Construction & Civil Engineering Works Open

OQ 02/26 - EUJTF Midlands Trail Network - Trails Construction: Offaly West

Deadline

09 Apr

Construction of trails for the EUJTF Midlands Trail Network in Offaly West

SME fit: Unknown Bid effort: Medium 📍 Offaly

Construction of trails for the EUJTF Midlands Trail Network in Offaly West

Bidder profile

Firms with experience in trail construction and project management in environmental contexts.

Risks & flags

  • missing mandatory documents
  • under-scoped delivery assumptions
  • non-compliant formatting

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

  • Tender ID: 069cd724-99da-77f9-8000-6c5e9d2108b3
  • Title: OQ 02/26 - EUJTF Midlands Trail Network - Trails Construction: Offaly West
  • Buyer: Bord na Móna PLC
  • Portal/System: Not stated
  • Procedure: Not clearly stated
  • Estimated value: not disclosed (eTenders placeholder)
  • Deadline: 2026-04-09T11:00:00+00:00

This notice appears to cover: TENDER METADATA Title: OQ 02/26 - EUJTF Midlands Trail Network - Trails Construction: Offaly West Buyer: Bord na Móna PLC Value: not disclosed (eTenders placeholder) Deadline: 2026-04-09T11:00:00+00:00 Sector: Construction & Civil Engineering Category: works VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims) ### BIND…

2. Scope of Work

The contracting authority is Bord na Móna PLC. The opportunity should be read in the context of the buyer's stated scope, constraints, and procurement rules in the source documents. Focus early on buyer priorities, mandatory compliance points, and evaluation language.

3. Background & buyer context

The contract scope should be mapped into clear work packages, deliverables, and any optional/extension elements. Separate mandatory requirements from desirable features and ensure your response mirrors the structure used in the tender documents.

4. Eligibility & selection criteria

Confirm legal standing, financial capacity, technical/professional ability, and any exclusion grounds. Prepare evidence for certifications, insurance, references, and declarations exactly as requested, including format and validity windows.

5. Award criteria & scoring

Build a compliance matrix from the technical specification and verified phrases. Include standards, interfaces, performance targets, service levels, implementation approach, and assumptions. CPV/details captured: Not clearly stated.

6. Submission requirements

Review pricing model, payment terms, contract duration, liabilities, termination rights, IP/data provisions, confidentiality, and any framework/call-off mechanics. Flag clauses requiring legal review before final submission.

7. Key dates & process

Follow the submission instructions precisely: portal workflow, required forms, file naming, signatures, attachment limits, and language requirements. Plan a final upload rehearsal to avoid last-minute validation failures.

8. Contract terms that matter

Key planning dates should include publication, clarification cut-off, submission deadline, and expected award/start milestones. Current extracted reference points: deadline 2026-04-09T11:00:00+00:00, reference not clearly stated.

9. Risks, red flags & unusuals

Primary risks include missing mandatory documents, under-scoped delivery assumptions, non-compliant formatting, and unaddressed contractual deviations. Resolve ambiguities through clarifications and keep an auditable assumptions register.

10. SME fit assessment

Position the bid around measurable outcomes, relevant case studies, delivery credibility, and low implementation risk. Emphasize discriminators aligned to evaluation criteria, and link each claim to evidence.

11. Where to dig deeper

  1. Confirm bid/no-bid decision and governance owner.
  2. Build requirement-by-requirement compliance matrix.
  3. Draft clarifications and submit before cut-off.
  4. Freeze solution, pricing, and partner inputs.
  5. Complete legal/commercial review and approvals.
  6. Run final quality check against instructions.
  7. Submit early and archive full submission pack.

Can you bid?

Required certifications

  • ISO 45001
  • Safe-T-Cert

Minimum turnover

€1,800,000

Scoring

Most Economically Advantageous Tender

Documents (18)

DOCX

Editable Appendices - RFT 7546800.docx

380.1 KB · RFT / Invitation to Tender

DOCX

FTS-5-v2.7-11-03-2026_Trail Construction_.docx

121.2 KB · RFT / Invitation to Tender

XLSX

RFT 7546800 - Pricing Schedule.xlsx

23.6 KB · RFT / Invitation to Tender

PDF

RFT 7546800 EUJTF Midlands Trail Network - Trails Construction.pdf

905.5 KB · RFT / Invitation to Tender

DOCX

MF1.4_Model_Form_03-08-2010 (3).docx

53.1 KB · Contract / Agreement / Terms

DOCX

MF_1.10_v1.3_25-11-2025 (3).docx

53.7 KB · Contract / Agreement / Terms

DOCX

PW-CF5_Agreement_A2_09-12-2019 (1).docx

34.3 KB · Contract / Agreement / Terms

PDF

PW-CF5_Contract_v2.9_25-11-2025.pdf

804.8 KB · Contract / Agreement / Terms

PDF

254156-PUNCH-OW-XX-DR-C-0550-0551-0552-0553.pdf

2.1 MB · Drawing / Plan / Layout

PDF

254156-PUNCH-OW-XX-DR-C-0600 - 0601- 0602 - 0603.pdf

4.4 MB · Drawing / Plan / Layout

PDF

BNM-DR-MTN-OW-TD-0226.pdf

775.8 KB · Drawing / Plan / Layout

PDF

BNM-DR-MTN-OW-TD-0227.pdf

765.4 KB · Drawing / Plan / Layout

PDF

BNM-DR-MTN-OW-TD-0228.pdf

716.0 KB · Drawing / Plan / Layout

PDF

BNM-DR-MTN-OW-TD-0229.pdf

715.2 KB · Drawing / Plan / Layout

PDF

BNM-DR-MTN-OW-TD-0230.pdf

678.3 KB · Drawing / Plan / Layout

PDF

BNM-DR-MTN-OW-TD-0231.pdf

833.6 KB · Drawing / Plan / Layout

PDF

BNM-DR-MTN-OW-TD-0232.pdf

799.0 KB · Drawing / Plan / Layout

DOCX

MF1.6_Model_Form_09-04-2020 (1).docx

55.6 KB · Insurance / Indemnity

Original notice text

This project forms a key component of the Midlands Trail Network and involves the trail construction in Offaly West in two lots. Lot 01 Lemanaghan (2.60km) and Lot 02 Turraun (4.85km). The works are intended to complete a strategic link between previously constructed trail segments and gateways, contributing to a broader recreational corridor.

AI analysis updated 3 months, 4 weeks ago

Bid ↗
Details

Deadline

09 Apr

View on eTenders ↗

Location

Offaly West, part of the EUJTF Midlands Trail Network project.

Procedure

Open

Clarification

01 Apr 2026

eTenders ID

7546800

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender