Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / UPS Components Replacements: Supply, Installation + Commissioning
Closed Telecoms & Networks Works SME Suitable Open

UPS Components Replacements: Supply, Installation + Commissioning

Value

€200k

Deadline

10 Apr

Supply, installation, and commissioning of UPS components for Tallaght University Hospital

SME fit: Medium Bid effort: Medium 📍 Dublin

Supply, installation, and commissioning of UPS components for Tallaght University Hospital

Bidder profile

Firms with experience in public sector installations and strong compliance capabilities.

Risks & flags

  • Short mobilisation window
  • Compliance burden
  • Insurance uncertainties

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Tallaght University Hospital
Title UPS Components Replacements: Supply, Installation + Commissioning
CPV / category Telecoms & Networks / works
Estimated value €200,000.00
Per-year (if multi-year) not stated
Procedure type Open
Lots 1
Location not stated
Contract length (< 3months), limited only by procurement lead time
Submission deadline 2026-04-10T14:00:00+00:00
Go-live / start m) Where works are likely to last 1 week or more

2. Scope of Work

This procurement covers ups components replacements: supply, installation + commissioning for Tallaght University Hospital. The extracted material indicates a construction-led delivery with compliance-heavy preconditions, particularly around liability cover and formal declarations. The operational requirement is to plan, execute, and complete site works in a controlled environment while maintaining programme certainty, quality assurance, and documentary evidence suitable for public-sector contract administration.

  • Flush skin and eyes for a minimum of 15 minutes
  • Tenderers must have a minimum annual turnover of €850,000
  • UPS Components: Supply, Installation and Commissioning Tenderers must have a minimum annual turnover of €850,000. This requirement is set to ensure that t
  • Manage mobilisation, sequencing, site safety, and handover documentation to the buyer's required standard.
  • Coordinate subcontractors and suppliers so programme, quality, and compliance obligations are met without disruption.

3. Background & buyer context

The buyer is Tallaght University Hospital, and the requirement appears to be triggered by asset-condition and lifecycle needs linked to building fabric renewal. The context points to a practical infrastructure intervention rather than a discretionary enhancement, with delivery expected under public procurement controls and standard declarations. The inclusion of explicit insurance thresholds and mandatory-form language indicates a risk-managed procurement posture. Incumbency is not clearly identified in the extracted text. Strategic emphasis appears to be continuity of service, safe execution on an occupied educational site, and auditable compliance from tender through completion.

4. Eligibility & selection criteria

Bidders must pass threshold checks before detailed evaluation. Based on extracted binding/mandatory phrases, key gates are:

  • Insurance: not specified in extracted binding lines; verify in suitability questionnaire and contract conditions.
  • Financial capacity / turnover: UPS Components: Supply, Installation and Commissioning Tenderers must have a minimum annual turnover of €850,000. This requirement is set to ensure that t
  • Legal/compliance declarations: mandatory declarations and form completion appear to be required at submission stage.
  • Technical suitability: evidence of capability for the specified works, programme control, and public-sector compliance is likely required.

5. Award criteria & scoring

The provided extracts do not clearly expose complete award weightings. Treat the competition as MEAT-style unless documents state otherwise, and verify: price/quality split, technical sub-criteria, any minimum quality threshold, and scoring formula (linear/proportional/consensus).

6. Submission requirements

Submission appears to require a structured, form-driven pack. Priority deliverables to assemble are:

  • Flush skin and eyes for a minimum of 15 minutes
  • Tenderers must have a minimum annual turnover of €850,000
  • Signed form of tender and pricing schedule aligned to the requested commercial breakdown.
  • Confirmation of insurance position and any commitments to place cover prior to contract award where allowed.
  • Methodology, programme, and resourcing narrative that directly maps to the scope and evaluation headings.

7. Key dates & process

  • Submission deadline: 2026-04-10T14:00:00+00:00
  • Date reference in extracts: 2026-04-10T14:00:00+00:00
  • Date reference in extracts: 20/03/2026
  • Date reference in extracts: 10/04/2026
  • Date reference in extracts: 20 Mar 2026
  • Process path (typical): publication → clarification window → submission deadline → compliance check → evaluation/award recommendation → standstill/award.
  • Bidder action: lock internal review deadlines before portal cut-off; assume no tolerance for late upload or incomplete mandatory forms.

8. Contract terms that matter

Commercial/legal terms that materially affect bid risk and margin should be checked early:

  • Insurance levels are not fully visible in extracts; treat this as a critical unknown until contract clauses are reviewed.
  • Confirm who carries design/interface risk, temporary works responsibility, and latent-condition exposure.
  • Check payment timing, retention, liquidated damages, extension-of-time mechanics, and change-control procedure.
  • Validate programme obligations against school-operation constraints, access windows, and safeguarding requirements.

9. Risks, red flags & unusuals

  • Short mobilisation window risk if clarifications, site constraints, or supply lead-times are unresolved before submission.
  • Award weighting detail is not explicit in the extracted text; bidders must verify scoring mechanics in full documents.
  • Extracted snippets include OCR artefacts; bidders should validate exact clause wording against original PDFs before pricing assumptions.
  • Where numeric snippets appear fragmented, rely on the original clause text rather than OCR-extracted fragments when finalising bid assumptions.

10. SME fit assessment

Indicative fit: Proceed only if the firm can satisfy insurance and governance gates without relying on post-award remediation.

Decision factor Signal from extracts SME implication
Core capability match Works scope appears aligned to mainstream building/refurbishment delivery. Strong if comparable school/live-site references exist.
Compliance burden Insurance and mandatory declarations are prominent. Medium-high overhead; prepare evidence early.
Commercial clarity Some OCR fragments and partial clauses present. Price only after clause-level validation.
Timeline pressure 2026-04-10T14:00:00+00:00 Requires disciplined internal bid plan and portal readiness.

Go / no-go rule of thumb: Go when insurance, governance, and delivery references are already in place and the bid can be submitted as a fully compliant package without qualification. No-go when compliance gaps require speculative assumptions or unresolved contractual risk pricing.

11. Where to dig deeper

Area What to verify Where to look
Insurance & liability Confirm exact minimums, per-event wording, and any project-specific riders. Suitability/selection forms and contract conditions.
Scope boundaries Check exclusions, assumptions, temporary works, and interfaces with live school operations. Specification, drawings, and appendices.
Commercial model Verify pricing basis, variation mechanism, and payment milestones/retention terms. Form of tender and contract particulars.
Programme Confirm possession/access windows, sequencing constraints, and completion milestones. Instructions to tenderers and programme schedules.
Evaluation Validate scoring formula, minimum pass marks, and tie-break rules. Award criteria schedule and ITT annexes.

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€850,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot : UPS Components Replacements

Documents (7)

PDF

1 TUH UPS Components Brief Rev1.pdf

372.1 KB · Specification

PDF

2 TUH UPS Components ITT Letter Rev2.pdf

175.2 KB · RFT / Invitation to Tender

PDF

4 TUH RFT Goods Rev2.pdf

2.1 MB · RFT / Invitation to Tender

XLSX

5 Appendix 2 Pricing Schedule.xlsx

43.5 KB · Pricing / BOQ / Schedule of Rates

DOCX

3 TUH Contract Notice UPS Open Procedure v2.docx

26.0 KB · Contract / Agreement / Terms

PDF

7 TUH UPS Components Brief App B TUH CSC.pdf

1.8 MB · Contract / Agreement / Terms

PDF

6 TUH UPS Components Brief App A Exist Info.pdf

2.0 MB · Appendix / Annex

Original notice text

Tallaght University Hospital operates a critical UPS estate supporting clinical, diagnostic, ICT, and life-safety systems across the campus. A number of UPS systems and components are approaching end of life and/or are no longer covered by manufacturer warranties. Components shall be compatible with the existing Schneider UPS system, or an equivalent solution proposed by the tenderer that demonstrates full technical compatibility with the existing installation and does not impact remaining warranties. Acceptance of any proposed equivalent solution will be subject to review and approval by Tallaght University Hospital.

AI analysis updated 3 months, 4 weeks ago

Bid ↗
Details

Value

€200k

Deadline

10 Apr

View on eTenders ↗

Location

Tallaght University Hospital, specific location not stated.

Procedure

Open

Clarification

03 Apr 2026

eTenders ID

7749298

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender