UPS Components Replacements: Supply, Installation + Commissioning
Value
€200k
Deadline
10 Apr
10 Apr 2026
Value
€200k
Deadline
10 Apr
Supply, installation, and commissioning of UPS components for Tallaght University Hospital
Supply, installation, and commissioning of UPS components for Tallaght University Hospital
Bidder profile
Firms with experience in public sector installations and strong compliance capabilities.
Risks & flags
- Short mobilisation window
- Compliance burden
- Insurance uncertainties
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Tallaght University Hospital |
| Title | UPS Components Replacements: Supply, Installation + Commissioning |
| CPV / category | Telecoms & Networks / works |
| Estimated value | €200,000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | Open |
| Lots | 1 |
| Location | not stated |
| Contract length | (< 3months), limited only by procurement lead time |
| Submission deadline | 2026-04-10T14:00:00+00:00 |
| Go-live / start | m) Where works are likely to last 1 week or more |
2. Scope of Work
This procurement covers ups components replacements: supply, installation + commissioning for Tallaght University Hospital. The extracted material indicates a construction-led delivery with compliance-heavy preconditions, particularly around liability cover and formal declarations. The operational requirement is to plan, execute, and complete site works in a controlled environment while maintaining programme certainty, quality assurance, and documentary evidence suitable for public-sector contract administration.
- Flush skin and eyes for a minimum of 15 minutes
- Tenderers must have a minimum annual turnover of €850,000
- UPS Components: Supply, Installation and Commissioning Tenderers must have a minimum annual turnover of €850,000. This requirement is set to ensure that t
- Manage mobilisation, sequencing, site safety, and handover documentation to the buyer's required standard.
- Coordinate subcontractors and suppliers so programme, quality, and compliance obligations are met without disruption.
3. Background & buyer context
The buyer is Tallaght University Hospital, and the requirement appears to be triggered by asset-condition and lifecycle needs linked to building fabric renewal. The context points to a practical infrastructure intervention rather than a discretionary enhancement, with delivery expected under public procurement controls and standard declarations. The inclusion of explicit insurance thresholds and mandatory-form language indicates a risk-managed procurement posture. Incumbency is not clearly identified in the extracted text. Strategic emphasis appears to be continuity of service, safe execution on an occupied educational site, and auditable compliance from tender through completion.
4. Eligibility & selection criteria
Bidders must pass threshold checks before detailed evaluation. Based on extracted binding/mandatory phrases, key gates are:
- Insurance: not specified in extracted binding lines; verify in suitability questionnaire and contract conditions.
- Financial capacity / turnover: UPS Components: Supply, Installation and Commissioning Tenderers must have a minimum annual turnover of €850,000. This requirement is set to ensure that t
- Legal/compliance declarations: mandatory declarations and form completion appear to be required at submission stage.
- Technical suitability: evidence of capability for the specified works, programme control, and public-sector compliance is likely required.
5. Award criteria & scoring
The provided extracts do not clearly expose complete award weightings. Treat the competition as MEAT-style unless documents state otherwise, and verify: price/quality split, technical sub-criteria, any minimum quality threshold, and scoring formula (linear/proportional/consensus).
6. Submission requirements
Submission appears to require a structured, form-driven pack. Priority deliverables to assemble are:
- Flush skin and eyes for a minimum of 15 minutes
- Tenderers must have a minimum annual turnover of €850,000
- Signed form of tender and pricing schedule aligned to the requested commercial breakdown.
- Confirmation of insurance position and any commitments to place cover prior to contract award where allowed.
- Methodology, programme, and resourcing narrative that directly maps to the scope and evaluation headings.
7. Key dates & process
- Submission deadline: 2026-04-10T14:00:00+00:00
- Date reference in extracts: 2026-04-10T14:00:00+00:00
- Date reference in extracts: 20/03/2026
- Date reference in extracts: 10/04/2026
- Date reference in extracts: 20 Mar 2026
- Process path (typical): publication → clarification window → submission deadline → compliance check → evaluation/award recommendation → standstill/award.
- Bidder action: lock internal review deadlines before portal cut-off; assume no tolerance for late upload or incomplete mandatory forms.
8. Contract terms that matter
Commercial/legal terms that materially affect bid risk and margin should be checked early:
- Insurance levels are not fully visible in extracts; treat this as a critical unknown until contract clauses are reviewed.
- Confirm who carries design/interface risk, temporary works responsibility, and latent-condition exposure.
- Check payment timing, retention, liquidated damages, extension-of-time mechanics, and change-control procedure.
- Validate programme obligations against school-operation constraints, access windows, and safeguarding requirements.
9. Risks, red flags & unusuals
- Short mobilisation window risk if clarifications, site constraints, or supply lead-times are unresolved before submission.
- Award weighting detail is not explicit in the extracted text; bidders must verify scoring mechanics in full documents.
- Extracted snippets include OCR artefacts; bidders should validate exact clause wording against original PDFs before pricing assumptions.
- Where numeric snippets appear fragmented, rely on the original clause text rather than OCR-extracted fragments when finalising bid assumptions.
10. SME fit assessment
Indicative fit: Proceed only if the firm can satisfy insurance and governance gates without relying on post-award remediation.
| Decision factor | Signal from extracts | SME implication |
|---|---|---|
| Core capability match | Works scope appears aligned to mainstream building/refurbishment delivery. | Strong if comparable school/live-site references exist. |
| Compliance burden | Insurance and mandatory declarations are prominent. | Medium-high overhead; prepare evidence early. |
| Commercial clarity | Some OCR fragments and partial clauses present. | Price only after clause-level validation. |
| Timeline pressure | 2026-04-10T14:00:00+00:00 | Requires disciplined internal bid plan and portal readiness. |
Go / no-go rule of thumb: Go when insurance, governance, and delivery references are already in place and the bid can be submitted as a fully compliant package without qualification. No-go when compliance gaps require speculative assumptions or unresolved contractual risk pricing.
11. Where to dig deeper
| Area | What to verify | Where to look |
|---|---|---|
| Insurance & liability | Confirm exact minimums, per-event wording, and any project-specific riders. | Suitability/selection forms and contract conditions. |
| Scope boundaries | Check exclusions, assumptions, temporary works, and interfaces with live school operations. | Specification, drawings, and appendices. |
| Commercial model | Verify pricing basis, variation mechanism, and payment milestones/retention terms. | Form of tender and contract particulars. |
| Programme | Confirm possession/access windows, sequencing constraints, and completion milestones. | Instructions to tenderers and programme schedules. |
| Evaluation | Validate scoring formula, minimum pass marks, and tie-break rules. | Award criteria schedule and ITT annexes. |
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€850,000
Public liability insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Lots (1)
Documents (7)
1 TUH UPS Components Brief Rev1.pdf
372.1 KB · Specification
2 TUH UPS Components ITT Letter Rev2.pdf
175.2 KB · RFT / Invitation to Tender
4 TUH RFT Goods Rev2.pdf
2.1 MB · RFT / Invitation to Tender
5 Appendix 2 Pricing Schedule.xlsx
43.5 KB · Pricing / BOQ / Schedule of Rates
3 TUH Contract Notice UPS Open Procedure v2.docx
26.0 KB · Contract / Agreement / Terms
7 TUH UPS Components Brief App B TUH CSC.pdf
1.8 MB · Contract / Agreement / Terms
6 TUH UPS Components Brief App A Exist Info.pdf
2.0 MB · Appendix / Annex
Original notice text
Tallaght University Hospital operates a critical UPS estate supporting clinical, diagnostic, ICT, and life-safety systems across the campus. A number of UPS systems and components are approaching end of life and/or are no longer covered by manufacturer warranties. Components shall be compatible with the existing Schneider UPS system, or an equivalent solution proposed by the tenderer that demonstrates full technical compatibility with the existing installation and does not impact remaining warranties. Acceptance of any proposed equivalent solution will be subject to review and approval by Tallaght University Hospital.
AI analysis updated 3 months, 4 weeks ago
Value
€200k
Deadline
10 Apr
Location
Tallaght University Hospital, specific location not stated.
Procedure
Open
Clarification
03 Apr 2026
eTenders ID
7749298