Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / The Essential Repairs and Consolidation of the First Message Building, Knightstown, Valentia Island, Co. Kerry
Closed Construction & Civil Engineering Works Open

The Essential Repairs and Consolidation of the First Message Building, Knightstown, Valentia Island, Co. Kerry

Value

€100k

Deadline

16 Apr

Repairs and consolidation of the First Message Building on Valentia Island.

SME fit: Medium Bid effort: Medium 📍 Kerry

Repairs and consolidation of the First Message Building on Valentia Island.

Bidder profile

Firms with experience in public procurement and construction compliance will find this tender suitable.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Valentia Island Development Company CLG
Title The Essential Repairs and Consolidation of the First Message Building, Knightstown, Valentia Island, Co. Kerry
CPV / category works / Construction & Civil Engineering
Estimated value €100000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Fig 1.1 Location of Slate Yard at Knightstown
Contract length not stated
Submission deadline 2026-04-16T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for The Essential Repairs and Consolidation of the First Message Building, Knightstown, Valentia Island, Co. Kerry. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Valentia Island Development Company CLG.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and compliance evidence for the awarded framework or contract lot.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract:  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be;  Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event;  Maximum excess for Public liability: €6,50010 in respect of property damage only

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — turnover, or €5,000.
  • Insurance
  • Public Liability — €6,500,0007
  • Professional Indemnity — €5,000.
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section:  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be;  Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event;  Maximum excess for Public liability: €6,50010 in respect of property damage only

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2026-04-16T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): 22001_AR_First Message Building_Tender-SY-CW-100.pdf, ITTW2-v3.1-25-11-2025.pdf
  • eTenders CFT ID: not stated
  • Clarification contact / portal: eTenders clarification portal
  • Priority attachments: 22001_AR_First Message Building_Tender-SY-CW-100.pdf, ITTW2-v3.1-25-11-2025.pdf, 3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

Can you bid?

Required certifications

  • ISO 45001:2018 or equivalent
  • Safe-T-Cert

Minimum turnover

€5,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€5,000

Scoring

Most Economically Advantageous Tender

Documents (38)

PDF

22001_First Message Building_Tender_Consolidation Methodology_LD-R4.pdf

1.9 MB · Specification

PDF

22001_Valentia Island FMB_Methodology & Method Statement_LIVE Rev 3.0.pdf

1.9 MB · Specification

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

43.6 KB · Specification

PDF

22001_AR_First Message Building_Tender-SY-CW-100.pdf

283.7 KB · RFT / Invitation to Tender

PDF

ITTW2-v3.1-25-11-2025.pdf

613.5 KB · RFT / Invitation to Tender

PDF

22001_AR_First Message Building_Tender-SY-CW-003.pdf

469.1 KB · Pricing / BOQ / Schedule of Rates

PDF

T90258A - First Message Building Prelims.pdf

395.7 KB · Pricing / BOQ / Schedule of Rates

PDF

T90258A - The Essential Repairs and Consolidation of the First Message Building Pricing Doc (VOL C) REV1.pdf

1.1 MB · Pricing / BOQ / Schedule of Rates

XLSX

T90258A First Message Building - Pricing Doc.xlsx

73.4 KB · Pricing / BOQ / Schedule of Rates

PDF

Tender Note - Soft Copies.pdf

13.3 KB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

52.3 KB · Contract / Agreement / Terms

PDF

22001_Valentia Island FMB_Consolidation_Notification Form.pdf

192.8 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

40.7 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

26.0 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

25.6 KB · Form / Declaration / Certificate

DOCX

Forms_of_undertaking.docx

91.3 KB · Form / Declaration / Certificate

PDF

22001_AR_First Message Building_Tender-SY-CW-000.pdf

2.4 MB · Drawing / Plan / Layout

PDF

22001_AR_First Message Building_Tender-SY-CW-002.pdf

328.8 KB · Drawing / Plan / Layout

PDF

22001_AR_First Message Building_Tender-SY-CW-300.pdf

560.5 KB · Drawing / Plan / Layout

PDF

22001_AR_First Message Building_Tender-SY-CW-301.pdf

478.4 KB · Drawing / Plan / Layout

PDF

22001_Valentia Island FMB_Consolidation_Drawings.pdf

5.7 MB · Drawing / Plan / Layout

PDF

Survey - Elevations and Plan.pdf

338.5 KB · Drawing / Plan / Layout

PDF

22001_JCA_Preliminary Health & Safety Plan_FMB.pdf

316.8 KB · Other

PDF

22001_Valentia Island FMB_Conosolidation_Letter of Consent.pdf

306.7 KB · Other

PDF

22001_Valentia Island FMB_Consolidation_Cover Letter.pdf

135.6 KB · Other

PDF

22001_Valentia Island FMB_Consolidation_Methodology.pdf

2.1 MB · Other

PDF

25647-6002-A First Msg Building Vegetation Removal Ecology Report.pdf

4.9 MB · Other

PDF

Fred Hamond's Slate Yard Report June 2019.pdf

18.3 MB · Other

PDF

Mortar Analysis Report - Sample 1.pdf

532.7 KB · Other

PDF

Mortar Analysis Report - Sample 2.pdf

945.6 KB · Other

PDF

Mortar Analysis Report - Sample 3.pdf

748.1 KB · Other

PDF

Mortar Analysis Report - Sample 4.pdf

1.0 MB · Other

PDF

Mortar Analysis Report - Sample 5.pdf

836.6 KB · Other

DOCX

1. QW2_Part_1_v2.2_25-11-2025.docx

193.2 KB · ESPD (European Single Procurement Document)

DOCX

2. QW-Part-2-v1.1-18-11-2024E.docx

60.9 KB · Tender Response Template

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

31.3 KB · Appendix / Annex

DOCX

Appendix_C_Bankers_Letter.docx

29.9 KB · Appendix / Annex

PDF

T92058A The Essential Repairs and Consolidation of the First Message - Tender & Schedule Rev1.pdf

509.4 KB · Appendix / Annex

Original notice text

Consolidation Works to the First Message Building, a ruined structure, Including repointing of masonry walls, reinstatement of stone lintols, reinstatement of wall tops with recovered stones from site and flaunching to protect existing building fabric.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€100k

Deadline

16 Apr

View on eTenders ↗

Location

First Message Building, Knightstown, Valentia Island, Co. Kerry.

Procedure

Open

Clarification

02 Apr 2026

eTenders ID

7697426

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender