Lot 2B Multi-Party Contractor Framework for Minor Electrical Works - Northern Region
Value
€2.0m
Deadline
15 Apr
15 Apr 2026
Value
€2.0m
Deadline
15 Apr
Framework for minor electrical works in the Northern Region.
Framework for minor electrical works in the Northern Region.
Bidder profile
Ideal bidders are firms experienced in minor electrical works with strong compliance and documentation capabilities.
Risks & flags
- Information asymmetry
- Compliance risks
- Timeline compression
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Údarás Na Gaeltachta_289 |
| Title | Lot 2B Multi-Party Contractor Framework for Minor Electrical Works - Northern Region / Lot 2B Creat Conraitheora Ilpháirtí do Mhionoibreacha Leictreacha - Réigiún an Tuaiscirt |
| CPV / category | works / Building Services & Maintenance |
| Estimated value | €2000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2026-04-15T14:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This procurement covered the supply scope described in the tender pack for Lot 2B Multi-Party Contractor Framework for Minor Electrical Works - Northern Region / Lot 2B Creat Conraitheora Ilpháirtí do Mhionoibreacha Leictreacha - Réigiún an Tuaiscirt. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.
- Contract title and category indicate supply activity for Building Services & Maintenance under buyer workflows in Údarás Na Gaeltachta_289.
- Submission package must align with the RFT structure published through the buyer's procurement channel.
- Day-to-day obligations include order fulfilment, documentation, and compliance evidence for the awarded framework or contract lot.
- Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
- Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
- Numerical obligations surfaced in the verified extract: he successful Tenderer(s) shall be required to hold for the term of the Works Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €12.7m any one claim or series of claims arisi; ng out of a single occurrence (if self- employed this is not necessary) Public Liability €2.6 million (any one claim) Professional Indemnity
The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.
3. Background & buyer context
The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.
4. Eligibility & selection criteria
- Turnover requirement — not specified for this tender
- Insurance
- Public Liability — €2.6m
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
Binding numerical extract used for this section: he successful Tenderer(s) shall be required to hold for the term of the Works Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €12.7m any one claim or series of claims arisi; ng out of a single occurrence (if self- employed this is not necessary) Public Liability €2.6 million (any one claim) Professional Indemnity
5. Award criteria & scoring
The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.
| Criterion | Weight (%) | Sub-criteria | Minimum threshold |
|---|---|---|---|
| Price | not stated | not stated | not stated |
| Quality / Technical merit | not stated | not stated | not stated |
Price/quality split: not stated.
6. Submission requirements
- Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
- CVs — provide role-based CVs where requested; page count not stated.
- Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
- Case studies — number and value bands not stated in the extract.
- Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
- Mandatory site visit — not stated in the extract.
- Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.
7. Key dates & process
| Milestone | Date / timing |
|---|---|
| RFT issued | not stated |
| Clarification deadline | not stated |
| Mandatory site visit | not stated |
| Tender deadline (date + time) | 2026-04-15T14:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.
9. Risks, red flags & unusuals
The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.
10. SME fit assessment
This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.
11. Where to dig deeper
- Source RFT file(s): 01-Lot 2B-Invitation to Tender Minor Electrical Works.pdf, PDF or .xlsx
- eTenders CFT ID: not stated
- Clarification contact / portal: eTenders clarification portal
- Priority attachments: 01-Lot 2B-Invitation to Tender Minor Electrical Works.pdf, PDF or .xlsx, PW-CF11-MF-Task-Order-v1.1-12-12-13.docx
Can you bid?
Required certifications
- Electrical contractor license
- Valid safety certifications
Minimum turnover
€50,000
Public liability insurance
€2,600,000
Scoring
Most Economically Advantageous Tender
Project Experience
Methodology
Pricing
Lots (1)
Small-scale electrical maintenance, repair, and installation tasks at Údarás na Gaeltachta premises in Donegal.
Documents (12)
01-Lot 2B-Invitation to Tender Minor Electrical Works.pdf
1.1 MB · RFT / Invitation to Tender
03-Lot 2B-Elec-Pricing Schedule.pdf
552.1 KB · Pricing / BOQ / Schedule of Rates
03-Lot 2B-Elec-Pricing Schedule.xlsx
23.4 KB · Pricing / BOQ / Schedule of Rates
Multi-Supplier Framework Agreement Contractor Presentation 08.09.2025.pdf
1.4 MB · Contract / Agreement / Terms
PW-CF11-MF-Task-Order-v1.1-12-12-13.docx
26.7 KB · Contract / Agreement / Terms
PW-CF11_Contract_v1.7_25-11-2025.pdf
271.4 KB · Contract / Agreement / Terms
PW-CF11_Employer_Note.pdf
36.8 KB · Contract / Agreement / Terms
02-Lot 2B-Tender Response Document.docx
98.7 KB · Tender Response Template
02-Lot 2B-Tender Response Document.pdf
1.1 MB · Tender Response Template
PW-CF11_Agreement.doc
56.5 KB
PW-CF11_FA_ITT.doc
1.0 MB
PW-CF11_Framework_Agreement-U na G-DRAFT.doc
135.0 KB
Original notice text
Údarás na Gaeltachta (The Contracting Authority) intends to establish a Multi Party Framework Agreement for Minor Electrical Works within Gaeltacht areas of their Northern Region (Co Donegal) - Lot 2B. Contractors appointed to the Framework will be eligible to tender for call-off contracts within this geographic area. Contracts awarded under this Framework will be based on the PW-CF11 Public Works Contract. The scope of works may vary by project and location and may be of an urgent/emergency nature. Works may include, without limitation, minor installation, repair and maintenance works associated with electrical systems. This Lot forms part of a series of separate but related Framework Competitions covering multiple sectors and regions, including Mechanical Works, Electrical Works, Emergency Works, and Tree Services across the Gaeltacht areas. Each sector and region are being advertised separately under their own CfT. These separate but related Framework Agreements will cover Gaeltacht regions within the following three areas: Southen region (Co Kerry, Co Cork, Co Waterford), Northern Region (Co Donegal) and Western Region (Co Galway, Co Mayo, Co Meath). The framework agreements are divided into lots for each identified area of work, providing opportunities for contractors of varying sizes and specialisms across the Gaeltacht regions. Tá sé i gceist ag Údarás na Gaeltachta (an tÚdarás Conarthach) Comhaontú Creata Ilpháirtí a bhunú do mion-oibreacha Leictreacha laistigh de cheantair Ghaeltachta Réigiún an Tuaiscirt (Co. Dhún na nGall) - Lot 2B. Beidh conraitheoirí atá ceaptha faoin gCreat Ilpháirtí i dteideal cur isteach ar chonarthaí sna ceantair leagtha amach. Bunófar conarthaí a dhámhfar faoin gCreat seo ar Chonradh na nOibreacha Poiblí PW-CF11. D'fhéadfadh raon na n-oibreacha a bheith éagsúil de réir togra agus suímh agus d'fhéadfadh sé a bheith de chineál práinneach/éigeandála. D'fhéadfadh na hoibreacha a áireamh, gan teorainn, mion-oibreacha suiteála, deisiúcháin agus cothabhála a bhaineann le córais leictreacha. Tá an Lot seo mar chuid de shraith Comórtas Creata ar leith a chlúdaíonn earnálacha agus réigiúin éagsúil, ina measc Oibreacha Meicniúla, Oibreacha Leictreacha, Oibreacha Éigeandála, agus Seirbhísí Crann ar fud na gceantair Ghaeltachta. Tá gach earnáil agus réigiún á fhógairt ar leith faoina CfT féin. Clúdóidh na Comhaontuithe Creata seo réigiúin Ghaeltachta laistigh de na trí cheantar seo a leanas: Réigiún an Deiscirt (Co Chiarraí, Co Chorcaí, Co Phort Láirge), Réigiún an Tuaiscirt (Co Dhún na nGall) agus Réigiún an Iarthair (Co na Gaillimhe, Co Mhaigh Eo, Co na Mí). Tá na comhaontuithe creata roinnte ina lotaí do gach réimse oibre aitheanta, ag soláthar deiseanna do chonraitheoirí de mhéideanna agus speisialtóireachtaí éagsúla ar fud na réigiún Gaeltachta.
AI analysis updated 3 months, 4 weeks ago
Value
€2.0m
Deadline
15 Apr
Buyer
Údarás Na GaeltachtaLocation
Údarás na Gaeltachta premises in Donegal, including Páirc Ghnó Ghaoth Dobhair.
Procedure
Open
Clarification
13 Mar 2026
eTenders ID
7612447
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender