Multi-package water infrastructure project: water treatment plant (DBOM), pipelines (DB), and terminal reservoir (DB) under NEC4 ECC Target Cost.
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Uisce Éireann |
|---|---|
| Title | 26-001 Water Supply Project, Eastern and Midlands Region (WSP) – Main Works Contracts |
| CPV / category | Water & Wastewater |
| Estimated value | €3,050,000,000 |
| Per-year | Not stated |
| Procedure type | Not stated |
| Lots | Not stated |
| Location | Eastern and Midlands Region, Ireland |
| Contract length | Not stated |
| Submission deadline | 2026-05-19 11:00:00+00:00 |
| Go-live / start | Not stated |
2. Scope of Work
The Water Supply Project (WSP) for the Eastern and Midlands Region involves significant infrastructure works to enhance water supply capabilities. The project is divided into several work packages, each with distinct responsibilities and deliverables.
- Work Package 1 (WP1): Design, Build, Operate, and Maintain (DBOM) a Water Treatment Plant. This includes a 3-year process proving period followed by a 4-year operational phase.
- Work Package 2 & 3 (WP2 & WP3): Design and Build (DB) pipelines to transport water from the treatment plant to various distribution points.
- Work Package 4 (WP4): Design and Build (DB) a Terminal Point Reservoir to store treated water before distribution.
- Collaboration and Enterprise Model: Utilizes the NEC4 ECC Target Cost contract form, emphasizing collaboration through the ICE Project 13 Enterprise Model.
- Pain/Gain Share Mechanism: A financial incentive structure where cost savings or overruns are shared between the contractor and Uisce Éireann on a 50/50 basis within a 90%-110% cost range.
- Retention and Performance Bonds: Retention is capped at 3%, and performance bonds are set at 10%.
- Ground Risk Sharing: Ground risk is shared between the contractor and Uisce Éireann, with a Guaranteed Maximum Price (GMP) provision.
3. Background & buyer context
The procurement of the Water Supply Project (WSP) is driven by the need to secure a reliable water supply for the Eastern and Midlands Region of Ireland. This initiative aligns with national infrastructure strategies to enhance water security and sustainability. Uisce Éireann, the buyer, is responsible for water services in Ireland and aims to address current and future water demands. The project is part of a broader effort to modernize water infrastructure and improve service delivery across the region.
4. Eligibility & selection criteria
- Turnover requirement: Minimum average annual turnover of €325 million.
- Insurance: Not specified for this tender.
- Certifications: Not specified for this tender.
- Past experience: Not specified for this tender.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail thresholds |
|---|---|---|---|
| Technical merit | Not specified | Not specified | Not specified |
| Price | Not specified | Not specified | Not specified |
| Quality | Not specified | Not specified | Not specified |
The price/quality split follows the Most Economically Advantageous Tender (MEAT) principle. Specific scoring thresholds are not disclosed.
6. Submission requirements
- Method statement / response document: Use named template, no page limits specified.
- CVs: Not specified for this tender.
- Pricing schedule: Format not specified, use named template.
- Case studies: Not specified for this tender.
- Declarations: Include ESPD, Bona Fides, Tax clearance, Conflict of Interest.
- Mandatory site visit: Not specified for this tender.
- Submission portal: eTenders, follow specific format rules regarding file naming and structure.
7. Key dates & process
| Event | Date |
|---|---|
| RFT issued | Not specified |
| Clarification deadline | Not specified |
| Mandatory site visit | Not specified |
| Tender deadline | 2026-05-19 11:00:00+00:00 |
| Expected award | Not specified |
| Contract start | Not specified |
| Go-live / mobilisation | Not specified |
8. Contract terms that matter
The contract follows a NEC4 ECC Target Cost structure with a pain/gain share mechanism. Payment terms are not specified. Key SLAs/KPIs include a 3-year process proving period and a 4-year operational phase for WP1. Liquidated damages or penalty regimes are not detailed. Termination clauses, IP ownership, and sub-contracting rules are not specified. No parent-company guarantee is required unless turnover requirements are not met.
9. Risks, red flags & unusuals
The turnover requirement of €325 million is notably high, potentially limiting the bidder pool to large firms or consortia. The use of the NEC4 ECC Target Cost contract and the pain/gain share mechanism may pose financial risks for bidders unfamiliar with these models. The absence of detailed insurance and personnel requirements could lead to ambiguities in bid preparation.
10. SME fit assessment
This tender is likely suited for large construction firms or consortia with significant financial capacity, given the €325 million turnover requirement. Sub-contracting and joint ventures are allowed, which may enable smaller firms to participate indirectly. Bid preparation effort is substantial, likely requiring several weeks of dedicated work. The presence of an incumbent or sole-supplier framework is not indicated, suggesting an open competition.
11. Where to dig deeper
- Source RFT filename: "26-001 Tender Pack .zip"
- eTenders CFT ID: Not specified
- Contact email or clarification portal: Not specified
- Important attachments: "WSP Dirn OF Travel 06032026.pdf", "Notes_for_submission.pdf"
Can you bid?
Minimum turnover
€325,000,000
Scoring
Most Economically Advantageous Tender
Lots (1)
Design, build, and operation of water treatment plant, pipelines, and terminal reservoir.
Documents (5)
WSP Dirn OF Travel 06032026.pdf
149.7 KB · Contract / Agreement / Terms
Notes_for_submission.pdf
194.6 KB · Other
26-001 Appendix_4 WSP PQQ.xlsx
93.9 KB · Appendix / Annex
26-001 Tender Pack .zip
860.9 KB · Appendix / Annex
Tender Clarification Request Form - eTender.xlsx
53.9 KB · Clarification / Addendum
Original notice text
You must submit through the etenders system before the deadline. The submission deadline is strict and no submissions will be possible after the date and time specified in the PQQ documents unless there are exceptional mitigating circumstances outside the control of the Applicant. Such a decision shall be entirely at the discretion of the Contracting Entity. Please note that all tenders are electronic, as such NO paper copies will be accepted or read. Please submit via the etenders system not later than 12.00 hrs local time 28th April 2026. The estimated values in this eForm are dependent on needs and budgetary resources, and are indicative only and are not binding on the Contracting Entity. As the estimated values are equal to or are greater than EUR 250 million, any economic operators participating in this public procurement procedure shall notify the Contracting Entity of all foreign financial contributions as defined in Article 28 1 point b of the Foreign Subsidies Regulation Regulation Eu 2022 2560. 15 years Design and Build 4-5 years, Process Proving 3 years, Operation up to 7 Years, Max Estimate 15 years
AI analysis updated 4 months ago
Value
€3050.0m
Deadline
19 May
Buyer
Uisce ÉireannLocation
Eastern and Midlands Region, Ireland
Procedure
Negotiated
Clarification
12 May 2026
eTenders ID
7418539
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender