Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Refurbishment, Renovation and Extension of the Existing Connolly Barracks, Church Street, Abbeycartron, Longford
Closed Construction & Civil Engineering Works Open

Refurbishment, Renovation and Extension of the Existing Connolly Barracks, Church Street, Abbeycartron, Longford

Value

€5.1m

Deadline

23 Apr

Refurbishment and extension of Connolly Barracks in Longford

SME fit: Medium Bid effort: Medium 📍 Longford

Refurbishment and extension of Connolly Barracks in Longford

Bidder profile

This opportunity is suitable for SMEs or mid-market contractors with strong compliance and execution capabilities.

Risks & flags

  • Strict compliance requirements
  • Insurance thresholds
  • Submission deadline risks

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Longford County Council
Title Refurbishment, Renovation and Extension of the Existing Connolly Barracks, Church Street, Abbeycartron, Longford
CPV / category works
Estimated value €5,100,000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-04-23T15:00:00+00:00
Go-live / start not stated

2. Scope of Work

The contracting authority sought works under the title "Refurbishment, Renovation and Extension of the Existing Connolly Barracks, Church Street, Abbeycartron, Longford" for Longford County Council. The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included €6.5, €6,500,000, €13,000,000, €1,500,000, 2%, €5,000, €5,, 12 years.

0 6J The contractor shall employ a consulting engineer with Professional Indemnity Insurance of €6.5m to prepare their temporary works propos. 0 19D Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event. 0 19E Minimum indemnity limit for Employers liability insurance: €13,000,000 for any one event. 0 19J Minimum indemnity limit for Professional Indemnity insurance: €1,500,000 annual aggregate limit, kept in place fo. 0 19L Maximum excess for Professional Indemnity insurance: 2% of annual turnover or €5,000 whichever is greater 1. 0 19L Maximum excess for Professional Indemnity insurance: 2% of annual turnover or €5, Risks policy must note Longford County C.

3. Background & buyer context

The process was run by Longford County Council with deadline recorded as 2026-04-23T15:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.

4. Eligibility & selection criteria

Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: 0 6J The contractor shall employ a consulting engineer with Professional Indemnity Insurance of €6.5m to prepare their temporary works propos; 0 19D Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event; 0 19E Minimum indemnity limit for Employers liability insurance: €13,000,000 for any one event; 0 19J Minimum indemnity limit for Professional Indemnity insurance: €1,500,000 annual aggregate limit, kept in place fo; 0 19L Maximum excess for Professional Indemnity insurance: 2% of annual turnover or €5,000 whichever is greater 1. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.

5. Award criteria & scoring

Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.

6. Submission requirements

Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.

7. Key dates & process

Commercial baseline in metadata showed estimated value €5,100,000.00. Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.

8. Contract terms that matter

Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included 0 6J The contractor shall employ a consulting engineer with Professional Indemnity Insurance of €6.5m to prepare their temporary works propos; 0 19D Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event; 0 19E Minimum indemnity limit for Employers liability insurance: €13,000,000 for any one event; 0 19J Minimum indemnity limit for Professional Indemnity insurance: €1,500,000 annual aggregate limit, kept in place fo; 0 19L Maximum excess for Professional Indemnity insurance: 2% of annual turnover or €5,000 whichever is greater 1; 0 19L Maximum excess for Professional Indemnity insurance: 2% of annual turnover or €5, Risks policy must note Longford County C. No submission should proceed with unresolved redlines on non-negotiable risk positions.

9. Risks, red flags & unusuals

Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-04-23T15:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.

10. SME fit assessment

  1. Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
  2. Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
  3. Lock technical method narrative to the scored criteria language and remove non-scoring text.
  4. Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
  5. Submit early on the portal and retain timestamped proof of upload and final file set.

11. Where to dig deeper

This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: 069cd72c-e337-7a48-8000-e732ec4d44a8.

Can you bid?

Required certifications

  • Professional Indemnity Insurance
  • Public Liability Insurance
  • Employers Liability Insurance

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Redevelopment of Connolly Barracks

Refurbishment and renovation of the protected H-plan barracks building, including extensions and upgrades to provide social, community, and technological facilities.

Documents (76)

ZIP

Tender Document Update 28 Jan 2026.zip

1.3 MB · Pricing / BOQ / Schedule of Rates

ZIP

Tender Document Update 09 Feb 2026.zip

198.5 KB · Other

ZIP

Tender Document Update 28 Jan 2026 - Part 2.zip

1.0 MB · Other

PDF

241056-MPA-X-X-X-L00-DR-SE-0101 - Proposed Ground Floor Layout-Rev 01.pdf

892.0 KB

PDF

241056-MPA-X-X-X-L01-DR-SE-0102 - Proposed First Floor Layout-Rev 01.pdf

1.1 MB

PDF

241056-MPA-X-X-X-L02-DR-SE-0103 - Proposed Second Floor Layout-Rev 01.pdf

552.0 KB

PDF

241056-MPA-X-X-X-XXX-DR-CE-0101 - Proposed Site Layout-Rev 01.pdf

1.2 MB

PDF

241056-MPA-X-X-X-XXX-DR-CE-0140- Proposed Underslab Drainage Layout-Rev 01.pdf

323.7 KB

PDF

241056-MPA-X-X-X-XXX-DR-CE-0305 - Proposed External Works Details- Rev 01.pdf

1.1 MB

PDF

241056-MPA-X-X-X-XXX-DR-CE-0306 - Proposed External Works Details Sheet 2- Rev 01.pdf

352.6 KB

PDF

241056-MPA-X-X-X-XXX-DR-SE-0200 - Proposed Section 01-Rev 01.pdf

468.2 KB

PDF

241056-MPA-X-X-X-XXX-DR-SE-0202 - Proposed Section 03-Rev 01.pdf

506.1 KB

PDF

241056-MPA-X-X-X-XXX-DR-SE-0203 - Proposed Section 04-Rev 01.pdf

532.3 KB

PDF

241056-MPA-X-X-X-XXX-DR-SE-0204 - Proposed Section 05-Rev 01.pdf

490.4 KB

PDF

241056-MPA-X-X-X-XXX-DR-SE-0300 - Proposed structural Details Sheet 1 - Rev 01.pdf

323.6 KB

PDF

241056-MPA-X-X-X-XXX-DR-SE-0301 - Proposed structural Details Sheet 2 - Rev 01.pdf

303.4 KB

PDF

241056-MPA-X-X-X-XXX-DR-SE-0302 - Proposed structural Details Sheet 3 - Rev 01.pdf

322.0 KB

PDF

241056-MPA-X-X-X-XXX-IS-CE-1000 - Tender Issue Register - 260320.pdf

185.5 KB

PDF

24214 Electrical Drawing Register.pdf

376.6 KB

PDF

24214-DW-FF-M-100-400.pdf

969.4 KB

PDF

24214-DW-SF-M-100-400.pdf

383.3 KB

PDF

24214-L00-DR-DLW-E-100.pdf

995.8 KB

PDF

24214-L00-DR-DLW-E-200.pdf

920.6 KB

PDF

24214-L01-DR-DLW-E-101.pdf

855.7 KB

PDF

24214-L01-DR-DLW-E-201.pdf

919.5 KB

PDF

24214-XXX-SH-DLW-M-0001 -Equipment Schedule (Connolly Barracks) - T02.pdf

495.2 KB

PDF

Connolly Barracks_Drawing Issue Register.pdf

41.0 KB

PDF

D.110_Level 00_Proposed.pdf

694.0 KB

PDF

D.300_Section AA South Wing_Proposed.pdf

351.8 KB

PDF

D.301_Section BB South Wing_Proposed.pdf

349.8 KB

PDF

D.302_Section CC North Wing_Proposed.pdf

351.5 KB

PDF

D.303_Section DD North Wing_Proposed.pdf

349.8 KB

PDF

D.304_Section EE South Stair.pdf

385.7 KB

PDF

D.305_Section FF South Central_Proposed.pdf

369.2 KB

PDF

D.306_Section GG Central_Proposed.pdf

394.6 KB

PDF

D.307_Section HH Central Stair_Proposed.pdf

392.3 KB

PDF

D.308_Section II Central Lift_Proposed.pdf

401.0 KB

PDF

D.309_Section JJ North Central_Proposed.pdf

368.5 KB

PDF

D.310_Section KK North Stair_Proposed.pdf

381.0 KB

PDF

D.311_Section LL Annexe South_Proposed.pdf

339.5 KB

PDF

D.312_Section MM Annexe Centre_Proposed.pdf

345.9 KB

PDF

D.313_Section NN Annexe North_Proposed.pdf

339.1 KB

PDF

D.400_Wall Detail_01.pdf

276.7 KB

PDF

D.401_Wall Detail_02.pdf

276.7 KB

PDF

D.402.1_Wall Detail_03.pdf

280.2 KB

PDF

D.402.2_Wall Detail_03.pdf

280.4 KB

PDF

D.402.3_Wall Detail_03.pdf

281.6 KB

PDF

D.421_Floor Detail_02.pdf

282.6 KB

PDF

D.427_Floor Detail_08.pdf

277.9 KB

PDF

D.430_Ceiling Details_01.pdf

281.2 KB

PDF

D.432_Ceiling Details_03.pdf

281.1 KB

PDF

D.441_Pitched Roof Replacement Detail.pdf

326.5 KB

PDF

D.442_Flat Roof.pdf

282.1 KB

PDF

D.447_Flat Roof Soffit.pdf

288.4 KB

PDF

D.460_Window Reveal.pdf

279.8 KB

PDF

D.471.A_Ramp Wall Details.pdf

289.0 KB

PDF

D.471.B_Ramp Wall Details.pdf

289.3 KB

PDF

D.472_Planter Details.pdf

288.7 KB

PDF

D.500_Front Landscape.pdf

334.3 KB

PDF

D.501_Planters.pdf

373.6 KB

PDF

D.502.A_Southern Ramp.pdf

391.4 KB

PDF

D.502.B_Northern Ramps.pdf

388.8 KB

PDF

D.503_Rear Landscape.pdf

501.9 KB

PDF

D.600_00_South.pdf

520.7 KB

PDF

D.601_00_North.pdf

468.2 KB

PDF

D.602_01_South.pdf

381.6 KB

PDF

D.603_01_North.pdf

393.1 KB

PDF

D.660_Main Hall Extension.pdf

492.3 KB

PDF

D.701_Internal Door Schedule.pdf

332.3 KB

PDF

D.711_Timber Panels Schedule.pdf

297.4 KB

PDF

D.712_Aluminium Panels Schedule.pdf

296.0 KB

PDF

Existing Building SOC.pdf

68.0 KB

PDF

External Works SOC.pdf

43.4 KB

PDF

New Building SOC.pdf

54.7 KB

CBX

W1308 - Connolly Addendum Vol C.CBX

1020.0 KB

XLSX

W1308 - Connolly Barracks Vol C.xlsx

657.7 KB

Original notice text

This project involves the refurbishment, renovation, and extension of the existing Connolly Barracks, requiring compliance with strict procurement and execution standards.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€5.1m

Deadline

23 Apr

View on eTenders ↗

Location

Connolly Barracks, Church Street, Abbeycartron, Longford

Procedure

Open

Clarification

23 Apr 2026

eTenders ID

7336242

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender