Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / CFT 3754 - MPFA for supply and installation of public realm footpaths and park infrastructure
Awarded Construction & Civil Engineering Services Restricted

CFT 3754 - MPFA for supply and installation of public realm footpaths and park infrastructure

Deadline

08 Apr

Supply and installation of public realm footpaths and park infrastructure for South Dublin County Council

SME fit: Medium Bid effort: Medium 📍 Dublin

Supply and installation of public realm footpaths and park infrastructure for South Dublin County Council

Bidder profile

Ideal for firms experienced in public works and capable of meeting stringent insurance and compliance requirements.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer South Dublin County Council
Title CFT 3754 - MPFA for supply and installation of public realm footpaths and park infrastructure. The Initial contract is for 12 months with an option to proceed for up to 3 x 12 month periods (4 years
CPV / category services / Construction & Civil Engineering
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2025-04-08T15:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for CFT 3754 - MPFA for supply and installation of public realm footpaths and park infrastructure. The Initial contract is for 12 months with an option to proceed for up to 3 x 12 month periods (4 years. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in South Dublin County Council.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and compliance evidence for the awarded framework or contract lot.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: Minimum level of Public Liability Insurance required in respect of any one accident: € CA Entry[19] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec; Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be; Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — Turnover arising from the area of work specified: footpaths and park infrastructure € 750,000 Minimum level of Professional Indemnity Insurance required for € 2 m
  • Insurance
  • Public Liability — €6,500,000
  • Professional Indemnity — €1,000
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: Minimum level of Public Liability Insurance required in respect of any one accident: € CA Entry[19] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec; Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be; Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2025-04-08T15:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): F01 ITT-W2-v3.0-18-11-24-23-01-25.docx
  • eTenders CFT ID: 3754
  • Clarification contact / portal: eTenders clarification portal
  • Priority attachments: F01 ITT-W2-v3.0-18-11-24-23-01-25.docx

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€750,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,000,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (26)

DOCX

QC-Part-2-v1.1-04-11-2024.docx

67.7 KB · Form / Declaration / Certificate

DOCX

QC1-Part-1-v3.1-04-11-2024.docx

157.5 KB · Form / Declaration / Certificate

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023 (2).docx

49.9 KB

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023 (1).docx

44.8 KB

DOCX

3.4.3-HS-Works-Specialist-with-Design-v3.0-28-07-2023 (1).docx

47.2 KB

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57 (1).docx

42.5 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE (1).docx

33.9 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution (1).docx

30.7 KB

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services (1).docx

30.1 KB

DOCX

Appendix-C-Bankers-Letter (1).docx

34.4 KB

DOCX

Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond (2).docx

38.2 KB

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx

31.5 KB

DOCX

Data Protection Appendix.docx

22.0 KB

DOCX

ESPD template.docx

76.4 KB

DOCX

F01 1. Volume A Works UPDATE.2.docx

7.7 MB

DOCX

F01 FTS-4-v2.6-09-01-2025.docx

98.4 KB

DOCX

F01 ITT-W2-v3.0-18-11-24-23-01-25.docx

71.6 KB

DOCX

F01 QW2-Part-1-v2.1-18-11-2024-09-01-2025 (2).docx

194.6 KB

PDF

Information-Note-GDPR-05-06-2019.pdf

265.7 KB

DOCX

MF-1.10-09-04-2020.docx

53.9 KB

DOCX

MF-1.11-09-04-2020.docx

49.5 KB

DOCX

MF-1.6-09-04-2020.docx

58.5 KB

PDF

PW-CF4-v2.7-01-05-2024.pdf

1.3 MB

DOCX

QW-Part-2-v1.1-18-11-2024.docx

58.6 KB

PDF

SDCC Invitation to Tender memo.pdf

141.0 KB

DOCX

Volume F External Safety and Health Prequalification Questionnaire.docx

59.6 KB

Original notice text

This tender involves the supply and installation of footpaths and park infrastructure for South Dublin County Council, with an initial contract of 12 months and options for extensions.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

08 Apr

View on eTenders ↗

Location

Various locations within South Dublin County

Procedure

Restricted

Clarification

28 Mar 2025

eTenders ID

5308061

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender