← Tenders / 2840.02 - Main Contractor and PSCS Services for Control Room Upgrade Works at Ballycasey ATC Centre, Co. Clare
Closed Construction & Civil Engineering Works Open

2840.02 - Main Contractor and PSCS Services for Control Room Upgrade Works at Ballycasey ATC Centre, Co. Clare

Deadline

26 Mar

Main contractor and PSCS services for control room upgrade works at Ballycasey ATC Centre.

SME fit: Medium Bid effort: Medium 📍 Clare

Main contractor and PSCS services for control room upgrade works at Ballycasey ATC Centre.

Bidder profile

Mid-sized to large firms with public-sector tender experience and operational capability in construction.

Risks & flags

  • Undisclosed contract value
  • Qualification gate turnover threshold
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer The Irish Air Navigation Service
Title 2840.02 - Main Contractor and PSCS Services for Control Room Upgrade Works at Ballycasey ATC Centre, Co. Clare
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 3 months
Submission deadline 2026-03-26T17:00:00+00:00
Go-live / start not stated

2. Scope of Work

The Irish Air Navigation Service ran this procurement for “2840.02 - Main Contractor and PSCS Services for Control Room Upgrade Works at Ballycasey ATC Centre, Co. Clare” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Title: 2840.02 - Main Contractor and PSCS Services for Control Room Upgrade Works at Ballycasey ATC Centre, Co. Clare
  • Buyer: The Irish Air Navigation Service
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • n that their safety management system is in accordance with ISO 45001:2018or equivalent
  • Provide a list of completed projects below for which select as appropriate: Works/Works and PSCS Services/Specialist Works/Specialist Works with Design Input were provided by the Applicant over the time period stated in the relevant Qualification Criterion stated above that are similar in nature and complexity to the Works required for this Competition.
  • The evidence required to pass this criterion is details of the relevant technicians or technical bodies upon whom the Applicant can call on in order to carry out the work or whom the Applicant can use in regards to quality control. Applicants must also provide evidence of a safety management system.
  • Evidence in support of the declarations in Appendix 1 and any requirements set out above must be provided when requested by the Contracting Authority.In place of documentary evidence, Applicants may provide third party certification that their safety management system is in accordance with ISO 45001:2018or equivalent. Certified membership of Safe-T-Cert may be deemed equivalent for the purposes of this criterion. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

    • Health and Safety Policy and Organisation;
    • a copy of our current general health and safety policy; * a general Health and Safety policy document appropriate to a Health and Safety led Construction Management role;
  • [3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx] safety policy; * a general Health and Safety policy document appropriate to a Health and Safety led Construction Management role;

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 0[16] The excess as st; ated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
  • Certifications — not specified for this tender
  • Past experience — g an auditors statement) confirming that the Applicants minimum average turnover for each of the last three (3) financial years was as least €1,125,000 or a cumulative total of €3,375,000 in the last three (3) financial years
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction[14] € 1,125,000 CA SUPPLEMENTARY REQUIREMENTS: In
  • g an auditors statement) confirming that the Applicants minimum average turnover for each of the last three (3) financial years was as least €1,125,000 or a cumulative total of €3,375,000 in the last three (3) financial years
  • The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 0[16] The excess as st
  • ated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
ated here: Maximum permissible excess on Professional Indemnity In 2% not stated not stated
e in any one claim below which the will bear the cost is the greater amount of 2 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • This project number must correspond to the project number given in Appendix B1
  • This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a Certifi
  • [Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx]
  • [Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx] 18 Applicant Entry
    1. in the completed form of Appendix B2 Certificate of Satisfactory Execution

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2026-03-26T17:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2026-03-26T17:00:00+00:00
Date surfaced in documents Regulations 2013
Date surfaced in documents Act 2005
Date surfaced in documents Regulations 2007

8. Contract terms that matter

Contract duration in the extract: 3 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • e Tenderer’s current principal banker dated within the past 3 months stating the duration of the relationshi
  • cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap
  • The evidence required to pass this criterion should be submitted in the form of a document setting out the Applicant’s organisational structure and the curricula vitae of the Applicant’s management staff and any additional requirements that may be set out below. The curriculum vitae of each management staff member should indicate their relevant educational and professional qualifications and Health and Safety training and qualifications (for example, degree, diploma, certificate, CPD), their experience on projects of a similar scale and complexity, and the role they had on those projects.
    1. The evidence required to pass this criterion should be submitted in the form of a document setting out the Applicant’s organisational structure and the curricula vitae of the Applicant’s personnel and any additional requirements that may be set out below. The curriculum vitae of each of the Applicant’s personnel should indicate their relevant educational and professional qualifications and Health and Safety training and qualifications (for example, degree, diploma, certificate, CPD), their experience on projects of a similar scale and complexity, and the role they had on those projects.
  • Evidence in support of the declarations in Appendix 1 and any requirements set out above must be provided when requested by the Contracting Authority.In place of documentary evidence, Applicants may provide third party certification that their safety management system is in accordance with ISO 45001:2018or equivalent. Certified membership of Safe-T-Cert may be deemed equivalent for the purposes of this criterion.
  • [3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx] accordance with ISO 45001:2018or equivalent. Certified membership of Safe-T-Cert may be deemed equivalent for the purposes of this criterion.
    1. In particular we are familiar with our general duties as Contractors as outlined in Part 3 Regulations 24-29 of the Safety, Health & Welfare at Work (Construction) Regulations 2013; also with the specific duties enumerated in Parts 4-14, Regulations 30-105 of those Regulations and Schedules 1-6 of those Regulations. We are aware of and will take into account the General Principles of Prevention in Schedule when carrying out design construction work associated with the project and undertake to liaise with, communicate and cooperate with the PSDP and the PSCS in their roles.

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx, 3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx, Appendix B1.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix B1 List of Previous Works projects for which there is a Certifi, Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx] , Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx] 18 Applicant Entry .

Can you bid?

Required certifications

  • ISO 45001:2018
  • Safe-T-Cert

Minimum turnover

€1,125,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (12)

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

51.4 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

43.5 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57 (2).docx

40.7 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution (1).docx

27.6 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services (1).docx

25.6 KB · Form / Declaration / Certificate

DOCX

QW2_Part_1_v2.2_25-11-2025.docx

198.1 KB · Form / Declaration / Certificate

DOCX

QW_Part_2_v1.1_18-11-2024.docx

58.5 KB · Form / Declaration / Certificate

PDF

2840.02 - Clarifications Nr1.pdf

211.7 KB · Clarification / Addendum

PDF

2840.02 - Clarifications Nr3.pdf

223.1 KB · Clarification / Addendum

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE (1).docx

33.0 KB · Appendix / Annex

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

33.0 KB · Appendix / Annex

ZIP

Tender Addendum No.2.zip

532.0 KB · Clarification / Addendum

Original notice text

Please refer to Volume A: Works Requirements for a detailed description of the works.

AI analysis updated 3 months, 4 weeks ago

Bid ↗
Details

Deadline

26 Mar

View on eTenders ↗

Location

Control Room Upgrade Works at Ballycasey ATC Centre

Procedure

Open

Clarification

19 Mar 2026

eTenders ID

7602652

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender