Airfield Taxiway Rehabilitation, Widening of the Central Apron and Associated Works 2026 at Shannon Airport
Value
€7.0m
Deadline
06 Mar
06 Mar 2026
Value
€7.0m
Deadline
06 Mar
The contractor will be responsible for the rehabilitation of Taxiway 7 and Taxiway Hotel 2, as well as the widening of the central apron. This work must be completed within a six-month timeframe, adhering to strict safety and operational standards.
Must-haves
Fail any = disqualifiedPass marking on all criteria to pass the PQQ
Declarations completed for all members of a consortium
Current tax clearance certificate
Minimum average annual turnover of €8 million for any three of the previous four years
Public Liability Insurance for €127 million for airside works and €6.5 million for landside works
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€8,000,000
Public liability insurance
€127,000,000
Background
The scope of work includes significant concrete rehabilitation and new pavement construction, specifically targeting Taxiway 7 and Taxiway Hotel 2 at Shannon Airport. The contractor must manage operations in a live airside environment, ensuring compliance with aviation regulations and safety standards. The project requires the contractor to engage an Aeronautical Ground Lighting (AGL) specialist and demonstrate their experience in similar projects. Timely completion by the end of 2026 is critical, with a total project value of approximately €7 million.
What this involves
{'scope': 'Carry out rehabilitation of Taxiways 7 and Hotel 2, widen the Central Apron between Stand 28 and Taxiway Delta, perform spot slab replacement throughout Shannon Airport; act as PSCS; complete all works by year-end 2026.', 'timeline': 'Anticipated start: June 2026. Construction phase: six months. All works must be complete by year-end 2026.', 'citations': {'timeline': ['PQQ for Construction Works Relating to Airfield Taxiway Rehabilitation, Widening of the Central Apron and Associated Works 2026 at Shannon Airport 23.02.26.docx:3'], 'deliverables': ['PQQ for Construction Works Relating to Airfield Taxiway Rehabilitation, Widening of the Central Apron and Associated Works 2026 at Shannon Airport 23.02.26.docx:3'], 'scope_summary': ['PQQ for Construction Works Relating to Airfield Taxiway Rehabilitation, Widening of the Central Apron and Associated Works 2026 at Shannon Airport 23.02.26.docx:3']}, 'deliverables': ['Rehabilitated Taxiway 7', 'Rehabilitated Taxiway Hotel 2 at intersection of Taxiway Delta', 'Widened Central Apron between Stand 28 and Taxiway Delta', 'Spot slab replacements throughout airport site', 'All works complete and handed over by year-end 2026'], 'scope_summary': 'Construction works for the rehabilitation of Taxiways 7 and Hotel 2, widening of the Central Apron between Stand 28 and Taxiway Delta, and spot slab replacement throughout Shannon Airport; approximately €7 million, NEC Option B contract, June 2026 start, six-month construction phase.', 'summary_brief': 'Shannon Airport Authority DAC requires a contractor to carry out airfield taxiway rehabilitation and central apron widening works. The approximate value is €7 million. Works must commence in June 2026 and be complete by year-end 2026. The contract is NEC Option B (Priced Contract with Bill of Quantities). The contractor will be appointed PSCS. This is a two-stage negotiated tender with this PQQ as the first stage.', 'summary_detailed': 'The works include: rehabilitation of Taxiway 7; rehabilitation of Taxiway Hotel 2 at the intersection of Taxiway Delta; widening of the central apron between Stand 28 and Taxiway Delta; and spot slab replacement throughout the Shannon Airport site. The employer is design-responsible (Employer Designed contract) with Value Engineering opportunities permitted. Technical Advisors are TOBIN. PQQ evaluation criteria are: financial/economic profile, technical profile including H&S, Aeronautical Ground Lighting Specialist profile, and suitability for H&S. A site visit can be arranged through [email protected]. The programme is imperative — only contractors able to start June 2026 and complete by year-end 2026 should apply.'}
Scoring
Price
Methodology
Lots (1)
Rehabilitation of taxiways, widening of the central apron, and associated works at Shannon Airport.
Documents (1)
PQQ for Construction Works Relating to Airfield Taxiway Rehabilitation, Widening of the Central Apron and Associated Works 2026 at Shannon Airport 23.02.26.docx
127.2 KB · Form / Declaration / Certificate
Original notice text
Prequalification Questionnaire (PQQ) for Construction Works Relating to Airfield Taxiway Rehabilitation, Widening of the Central Apron and Associated Works 2026 at Shannon Airport
AI analysis updated 4 months ago
Value
€7.0m
Deadline
06 Mar
Location
Shannon Airport
Procedure
Negotiated
Clarification
24 Feb 2026
eTenders ID
7448905
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender