Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / MIC Foundation Roof (Mary Immaculate College)
Closed Construction & Civil Engineering Works SME Suitable Open

MIC Foundation Roof (Mary Immaculate College)

Deadline

05 Mar

Tender for the MIC Foundation Roof project at Mary Immaculate College.

SME fit: Medium Bid effort: Medium 📍 Limerick

Tender for the MIC Foundation Roof project at Mary Immaculate College.

Bidder profile

Mid-sized to large firms with experience in public sector projects and compliance processes.

Risks & flags

  • Undisclosed contract value
  • Qualification gate for turnover
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Mary Immaculate College
Title MIC Foundation Roof (Mary Immaculate College)
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 3 years
Submission deadline 2026-03-05T17:00:00+00:00
Go-live / start not stated

2. Scope of Work

Mary Immaculate College ran this procurement for “MIC Foundation Roof (Mary Immaculate College)” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • FB750 INTUBATT WITHIN 300mm x 100MM SERVICES VOID PENETRATING THRU WALL
  • FB750 Intubatt or equal and approved within 300mm x 100mm services void penetrating wall;
  • att or equal and approved within 300mm x 100mm services void penetrating wall;
  • 25 Location and marking of services
  • Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be on an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.
  • Persons under a contract of service or apprenticeship with the insured
  • Persons under a contract of service or apprenticeship with the insured.
  • Effecting or maintenance of insurance of or in connection with the provision of finance or advice on financial matters
  • Utilities means conducting media and apparatus for water, sewage, electricity, gas, oil, telecommunications, data, steam, air, or other services, and associated apparatus and structures.
  • The arbitration rules are the Capital Works Management Framework (CWMF) Arbitration Rules for use with Public Works and Construction Services Contracts (AR1) published on http://constructionprocurement.gov.ie/arbitration-rules/ on the date 10 days before the latest date for submission of Tenders for this contract (disregarding any amendments posted on that date).
  • The Contractor’s agent in the for service of legal process is:
  • All costs incurred with meeting legal requirements (including but not limited to PRSI), pension contributions, death in service contributions, sick pay contributions; and Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Substrate: Existing timber boarding if in sound condition or or Plywood (Class 2 to BS EN 636), a
  • Substrate: Existing timber boarding or new 22mm plywood
  • Remedial work: Replace unsuitable timber board, cut in new boarding to match existing
    1. Location of existing gas main is within the

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; vil Engineering category € 4,500,000 Minimum level of Professional Indemnity Insurance required for € N/A Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Minimum level of Public Liability I; one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond
  • Certifications — not specified for this tender
  • Past experience — * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € N/A[16] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
  • Personnel — vil Engineering category € 4,500,000 Minimum level of Professional Indemnity Insurance required for € N/A Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Minimum level of Public Liability I; Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[14] € 4,500,000 *CA Note: if stating a minimum yearly
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • vil Engineering category € 4,500,000 Minimum level of Professional Indemnity Insurance required for € N/A Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Minimum level of Public Liability I
  • one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond
  • Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be
  • Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event
  • Maximum excess for Public liability: €10,000 in respect of property damage only

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
vil Engineering category € 4,500,000 Minimum level of Professional Indemni 2% not stated not stated
  • The excess as stated here: Maximum permissible excess on Profess 2% not stated not stated | in any one claim below which the will bear the cost is the greater amount of 2% | 2% | not stated | not stated | The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • We have examined and understand the Public Works Contract for Minor Building and Civil Engineering Works Designed by the Employer, the Works Requirements, the Pricing Document, all as amended by any supplemental information, for the above contract.
  • We submit with this Tender the completed Pricing Document and Schedule which form part of this Tender. We adopt the Design Documents as our Works Proposals.
  • and any rates in the Pricing Document.
  • Note 3: The Contractor’s tendered percentage addition generates the Contractor’s profit on each of the named Specialist’s Sums rated as a percentage. It is inserted in the Pricing Document by the Contractor at Tender Stage. The Contractor’s tendered percentage addition is to be inserted above by the Contracting Authority. Where the tendered percentage addition is less than zero in the Pricing Document it shall be read as zero and inserted in the Schedule Part 3B as zero. When Contractor’s tendered percentage addition is to be taken into account for adjustments to the Contract Sum, in accordance with sub-clause 10.6 of the Conditions, the figures inserted in the Schedule Part 3B shall be used
  • Appendix 4 to Clause 15 Price Variation

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2026-03-05T17:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2026-03-05T17:00:00+00:00
Date surfaced in documents 09 January 2025
Date surfaced in documents September 2007
Date surfaced in documents January 2027

8. Contract terms that matter

Contract duration in the extract: 3 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond
  • Minimum amount for interim payments, except release of retention, € 10,000.00
  • Minimum amount for interim payments, except release of retention, € 10,000
  • EN 12811-1 Temporary Works Equipment – Scaffolds
  • Copper strip/ sheet: To BS EN 14783
  • Within 3 months after receipt of the Contractor’s final statement, the Employer’s
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: FTS-5-v2.7-09-01-2025.docx, Where Agreed Rules of Measurement 4 is selected from the drop down menu above it shall be as amended by Supplement 1, Issue 2. Where Civil Engineering Standard Method of Measurement 4: Revised is selected from the drop down menu above it shall be the 4TH Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5.3 of the Capital Works Management Framework. Where the TII’s Requirements for Measuring and

[FTS-5-v2.7-09-01-2025.docx, ITT-W2-v3.0-18-11-24-23-01-25 Rev 1.docx.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: Schedule and, Schedule, Schedule for Public Works Contract for Building Works Designed by the Employer.

Can you bid?

Required certifications

  • EN 12020
  • EN 13162
  • EN 13707

Minimum turnover

€4,500,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (41)

PDF

2407 Method Statement.pdf

157.6 KB · Specification

PDF

2407-X-XXX-SP-QNA-AR-0001.pdf

729.4 KB · Specification

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025 (2).docx

50.1 KB · Specification

DOCX

FTS-5-v2.7-09-01-2025.docx

107.6 KB · RFT / Invitation to Tender

DOCX

ITT-W2-v3.0-18-11-24-23-01-25 Rev 1.docx

81.6 KB · RFT / Invitation to Tender

DOCX

ITT-W2-v3.0-18-11-24-23-01-25.docx

84.0 KB · RFT / Invitation to Tender

E0X

MIC Foundation Building Roof Buildsoft.e0x

63.6 KB · Pricing / BOQ / Schedule of Rates

PDF

MIC Foundation Building Roof.pdf

799.0 KB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

58.9 KB · Contract / Agreement / Terms

PDF

PW-CF5_Contract_v2.9_25-11-2025.pdf

804.8 KB · Contract / Agreement / Terms

DOCX

QW2_Part_1_v2.2_25-11-2025 revised.docx

196.1 KB · Form / Declaration / Certificate

DOCX

QW_Part_2_v1.1_18-11-2024 (3).docx

59.2 KB · Form / Declaration / Certificate

PDF

2407-QNA-XX-XX-DR-A-5002.pdf

168.4 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5000.pdf

607.5 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5001.pdf

1.3 MB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5003.pdf

285.4 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5004.pdf

275.0 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5005.pdf

284.1 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5006.pdf

1.1 MB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5007.pdf

4.3 MB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5008.pdf

412.8 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5009.pdf

193.4 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5010.pdf

235.4 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5011.pdf

475.2 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5012.pdf

326.9 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5013.pdf

414.9 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5020.pdf

345.1 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-5021.pdf

317.0 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-6000.pdf

2.8 MB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-6001.pdf

909.0 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-6002.pdf

1.1 MB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-6003.pdf

1.4 MB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-6004.pdf

568.2 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-6005.pdf

677.7 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-6006.pdf

489.2 KB · Drawing / Plan / Layout

PDF

2407-X-XXX-DR-QNA-AR-6007.pdf

583.1 KB · Drawing / Plan / Layout

PDF

Punch Consulting _Structural Repair Details.pdf

17.6 MB · Drawing / Plan / Layout

PDF

Asbestos Survey - MIC FOUNDATION BUILDING - Roof Oct 25.pdf

4.1 MB · Other

PDF

MIC Foundation Roof Refurbishment Prelim EHS Plan.pdf

6.3 MB · Other

PDF

2407-X-XXX-IS-QNA-AR-0001_Document Issue Sheet.pdf

109.7 KB · Clarification / Addendum

DOCX

QW2_Part_1_v2.2_25-11-2025 (1).docx

200.9 KB · ESPD (European Single Procurement Document)

Original notice text

This tender involves the construction and operational management of the MIC Foundation Roof at Mary Immaculate College, requiring compliance with specific building and service standards over a 3-year contract.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

05 Mar

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

23 Feb 2026

eTenders ID

7440596

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender