Fire remediation works at Mill Court, Bandon, Co. Cork for Clúid Housing Association
Fire remediation works at Mill Court, Bandon, Co. Cork for Clúid Housing Association
Bidder profile
Mid-sized to large firms with experience in public sector tenders and fire safety compliance.
Risks & flags
- Undisclosed contract value
- Qualification gate for turnover
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Clúid Housing Association |
| Title | Fire Remediation Works at Mill Court, Bandon, Co. Cork |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 6 months |
| Submission deadline | 2026-03-20T17:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Clúid Housing Association ran this procurement for “Fire Remediation Works at Mill Court, Bandon, Co. Cork” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Sector: Building Services & Maintenance
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
-
- Number and type of Electronic Copies of Tender: Type: the eTenders Platform
- tested to standard BS EN 1366-3:2021 Fire resistance tests for service installations
- It will be a condition of the award of the Contract that the successful Tenderer shall, for the term of the Contract, comply with all applicable EU and domestic tax laws. Prior to the award of the Contract arising out of this Competition the successful Tenderer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by the Contracting Authority. By supplying these numbers the successful Tenderer acknowledges and agrees that the Contracting Authority has the permission of the successful Tenderer to verify its tax cleared position online.
- Tenderers must not make any assumptions that the Contracting Authority has prior knowledge of their organisation or service provision. Tenderers will only be evaluated on the
- Tenderers must not make any assumptions that the Contracting Authority has prior knowledge of their organisation or service provision. Tenderers will only be evaluated on the information contained in their Tender (as may be clarified in accordance with these Instructions).
- the Contracting Authority’s third party service providers, such as financial, legal and technical advisors; and
- [ITT-W4-v2.0-18-11-24.docx] ’s third party service providers, such as financial, legal and technical advisors; and
- Where the Particulars state that the required means of tender delivery is electronic submission to the eTenders platform, Tenderers are advised to ensure that they give sufficient time to allow for the successful upload of all Tender documents and that they have a reliable, continual connection speed available for this purpose. Tenderers should ensure that their operating system has sufficient capacity to execute the upload of all the documents included in the Tender submission before the deadline stated in the Particulars. The timely and complete upload of documents is the responsibility of each Tenderer. All files submitted electronically must be capable of being readily viewed in their entirety by the means stated in the Particulars. It is the responsibility of the Tenderer to ensure that electronic documents submitted are not corrupt. Tenderers are advised to consult etenders.gov.ie for information on uploading electronic submissions.
- Where the Particulars state that the required means of tender delivery is electronic submission (including to the eTenders platform), Candidates must submit a read only PDF copy of the pricing document with their Tender. In accordance with section 9.2 of these Instructions, the Contracting Authority may request that Tenderers provide a copy of the submitted pricing document
- [ITT-W4-v2.0-18-11-24.docx] of tender delivery is electronic submission (including to the eTenders platform), Candidates must submit a read only PDF copy of the pricing document with their Tender. In accordance with section 9.2 of these Instructions, the Contracting Authority may request that Tenderers provide a copy of the submitted pricing document (as appropriate) in its native file and/or .csv file format. Where requested, Tenders must provide the pricing document in the requested file formats promptly and within the stated timeframe. In the event of inconsistencies between the submitted read only PDF pricing document and either the native file format and/or csv file format, the read only PDF pricing document shall take precedence. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- INDICATES EXISTING TIMBER CLADDING TO BE REMOVED AND REPLACED WITH A STAMPED RENDERED FINISH
- If the Tenderer is unsuccessful as part of the Tender process, such personal data will be retained until three years after the conclusion of the Tender process or the award of the Contract to the successful Tenderer, whichever is later. If the Tenderer is successful, and a Contract is awarded to the Tenderer at the end of the Tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Contracting Authority upon request.
- Where the Particulars state that a deposit required for tender documents it will be refundable to all Tenderers that submit bona fide Tenders that are not subsequently withdrawn. The deposit is to cover the cost incurred by the Contracting Authority in preparing the relevant Tender documents.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 4 Employer’s Liability Minimum Limit The minimum limit of indemnity of the Contractor’s Employer’s Liability insurance shall be €13,000,000.00. 2; 5 Public Liability Minimum Limit The minimum limit of indemnity of the Contractor’s Public Liability insurance shall be €6,500,000.00 2
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — a of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category € CA Entry Minimum level of Professional Indemnity Insurance required for € €1,500,000 Maximum permissible excess on Profe
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 4 Employer’s Liability Minimum Limit The minimum limit of indemnity of the Contractor’s Employer’s Liability insurance shall be €13,000,000.00. 2
- 5 Public Liability Minimum Limit The minimum limit of indemnity of the Contractor’s Public Liability insurance shall be €6,500,000.00 2
- 6 Health Contractor’s Employer’s Liability insurance shall be €13,000,000.00. 2
- 3 Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10
- 4 public liability €6,500 10
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| in any one claim below which the will bear the cost is the greater amount of 2% | 2% | not stated | not stated |
| If any Bill of Quantities includes method-related charges, the total amount of m | not stated | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
-
- Number and type of Electronic Copies of Tender: Type: the eTenders Platform
- The Contracting Authority has sent a contract notice for the Works to eTenders.
- These documents set out the suitability assessment criteria, the award criterion and the evaluation and award process which will be followed by the Contracting Authority in making the assessment of which Tender is the lowest price. The documents also set out the information which must be supplied by Tenderers. Tenders must be submitted in accordance with these Instructions. Any Tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
- the completed pricing document (Volume C) [where required]
- Suitability Assessment Questionnaire(s)
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2026-03-20T17:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2026-03-20T17:00:00+00:00 |
| Date surfaced in documents | 18 November 2024 |
| Date surfaced in documents | 25 May 2018 |
| Date surfaced in documents | November 2024 |
8. Contract terms that matter
Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
- the Works within 12 months after the termination, the Contractor’s payment under this clause
- n on Contract Award: Decision on Contract Award: Within 3 weeks of receipt of tenders Within 3 weeks
- of receipt of tenders Within 3 weeks of receipt of tenders
- e Schedule says that a performance bond is required, within 7 days after the Employer sends
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: ITT-W4-v2.0-18-11-24.docx, PW-CF6-v1.14-19-07-2023.pdf, Schedule says that a performance bond is required, within 7 days after the Employer send.
- eTenders CFT / notice reference: contract notice for the Works to eTenders..
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ITT-W4-v2.0-18-11-24.docx] Instruction to Tenderers, ITT-W4 v2.0, ITT-W4-v2.0-18-11-24.docx] its officers, employees, or advisers will be liable to a.
Can you bid?
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,500,000
Named standards / methodologies
Scoring
Lowest Price
Documents (21)
3.4.2-HS-PSCS-v3.0-28-07-2023 (1).docx
45.6 KB · Specification
242665-ORS-XX-XX-CO-ZM-12a-001.pdf
895.9 KB · RFT / Invitation to Tender
FTS-6-v1.6-19-07-2023-1.docx
62.5 KB · RFT / Invitation to Tender
ITT-W4-v2.0-18-11-24.docx
71.8 KB · RFT / Invitation to Tender
3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx
50.4 KB · Contract / Agreement / Terms
MF-1.22-09-04-2020 .docx
34.4 KB · Contract / Agreement / Terms
PW-CF6-v1.14-19-07-2023.pdf
612.0 KB · Contract / Agreement / Terms
Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1.docx
42.0 KB · Form / Declaration / Certificate
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
31.8 KB · Form / Declaration / Certificate
Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx
31.3 KB · Form / Declaration / Certificate
MF-1.23-09-04-2020 (CoE).docx
36.5 KB · Form / Declaration / Certificate
242665-ORS-Z1-00-DR-AR-210.pdf
3.7 MB · Drawing / Plan / Layout
242665-ORS-Z1-00-DR-AR-211.pdf
3.9 MB · Drawing / Plan / Layout
242665-ORS-Z1-00-DR-AR-212.pdf
5.0 MB · Drawing / Plan / Layout
242665-ORS-Z1-00-DR-AR-213.pdf
5.5 MB · Drawing / Plan / Layout
242665-ORS-Z1-00-DR-AR-214.pdf
4.1 MB · Drawing / Plan / Layout
242665-ORS-XX-XX-RP-ZS-13F-001 - PSHP.pdf
6.4 MB · Other
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
37.0 KB · Appendix / Annex
Appendix-C-Bankers-Letter.docx
32.5 KB · Appendix / Annex
QW-Part-2-v1.1-18-11-2024E.docx
65.8 KB · Tender Response Template
QW2-Part-1-v2.1-18-11-2024-09-01-2025.docx
207.2 KB · ESPD (European Single Procurement Document)
Original notice text
Clúid Housing Association seeks a contractor for fire remediation works at Mill Court, Bandon, Co. Cork, focusing on building, integrating, and operating specified services with compliance reporting.
AI analysis updated 4 months, 1 week ago
Deadline
20 Mar
Location
Mill Court, Bandon, Co. Cork, Ireland
Procedure
Open
Clarification
27 Feb 2026
eTenders ID
7400802
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender