Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for Corporate Office Development, Associated Plantroom Upgrades and Ancillary Works at Shannon Airport, Shannon.
Closed Construction & Civil Engineering Services Open

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for Corporate Office Development, Associated Plantroom Upgrades and Ancillary Works at Shannon Airport, Shannon.

Deadline

09 Feb

Tender for architect-led design and cost management team for corporate office development at Shannon Airport.

SME fit: Medium Bid effort: Medium 📍 Clare

Tender for architect-led design and cost management team for corporate office development at Shannon Airport.

Bidder profile

Mid-sized to large firms with public sector tender experience and operational capability in design and cost management.

Risks & flags

  • Undisclosed contract value
  • Qualification gate for turnover
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Shannon Airport Authority DAC
Title Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for Corporate Office Development, Associated Plantroom Upgrades and Ancillary Works at Shannon Airport, Shannon.
CPV / category services
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 12 years
Submission deadline 2026-02-09T13:00:00+00:00
Go-live / start not stated

2. Scope of Work

Shannon Airport Authority DAC ran this procurement for “Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for Corporate Office Development, Associated Plantroom Upgrades and Ancillary Works at Shannon Airport, Shannon.” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • cialist Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover or €5,000, whichever is greatest Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000 Maximum level of excess for propert
  • y only* for any one incident below which the Service Provider will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 3
  • 0% of gross fee turnover, or €5,000 whichever is greater From start to completion of the Services; and 12 years f
  • eath, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6.5m € 5,000 From start to completion of the Services
  • Employers’ Liability for death, injury, to employees € 13m None From start to completion of the Services
  • Maximum level of excess in any one claim below which the Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover or €5,000, whichever is greatest
  • um level of excess in any one claim below which the Specialist Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover or €5,000, whichever is greatest
  • Maximum level of excess for property only* for any one incident below which the Service Provider will bear the cost: € 10,000
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • Anticipated Service Contract Period (months/years): 24 months - Stages 1-5, excluding 12 months defec
  • Should firms, tendering for this service, consider additional design input is needed on the project they must advise
  • additional amendments that arise during the course of the design services contract. Shannon Airport Authority Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • factored into the project programme as gateways. The consultant team will be required to provide input to any
  • including sustainability strategy development, energy efficient design, whole life carbon analysis and circular
  • This project will provide new corporate offices for The Shannon Airport Group using existing space within the main
  • terminal building. On completion of the new office space, The Shannon Airport Group will move from the existing

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6.5m € 5,000 From start to completion of; Employers’ Liability for death, injury, to employees € 13m None From start to completion of th
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6.5m € 5,000 From start to completion of
  • Employers’ Liability for death, injury, to employees € 13m None From start to completion of th
  • Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis Minimum level of Professional Indemnity Insurance complying with the conditions below: € 6,500,000 € 6,500,000 Maximum level of excess in any one
  • l Indemnity Insurance complying with the conditions below: Minimum level of Professional Indemnity Insurance complying with the conditions below: Minimum level of Professional Indemnity Insurance complying with the conditions below: Specialist Skill Provider Cover on Each And Every claim basis Cover on an Annual Aggregate basis QS € 6,500,000 € 6,500,000 C&S € 6,500,000 €
  • cialist Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover or €5,000, whichever is greatest Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000 Maximum level of excess for propert

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
cialist Service Provider will bear the cost: 2% of turnover or €5,000, whichev 2% not stated not stated
Maximum level of excess in any one claim below which the Service Provider will 2% not stated not stated
um level of excess in any one claim below which the Specialist Service Provider 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • to submitting for statutory approval (planning) and a final BER Certificate and
  • [1. Limestone Offices Development Design Team Brief.pdf] Resident Engineer/Architect for the construction period.
  • [1. Limestone Offices Development Design Team Brief.pdf] 1.7
  • [1. Limestone Offices Development Design Team Brief.pdf] will provide new corporate offices for The Shannon Airport Group using existing space within the main
  • [1. Limestone Offices Development Design Team Brief.pdf] at ground floor or roof level within close proximity

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2026-02-09T13:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2026-02-09T13:00:00+00:00
Date surfaced in documents September 2026

8. Contract terms that matter

Contract duration in the extract: 12 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • Title: Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for Corporate Office Development, Associated Plantroom Upgrades and Ancillary Works at Shannon Airport, Shannon.
  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6.5m € 5,000 From start to completion of
  • Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6.5m € 5,000 From start to completion of
  • eath, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6.5m € 5,000 From start to completion of the Services
  • NOW IT IS HEREBY AGREED, in consideration of the payment of €5 (five Euro) from the Client to the Sub-Consultant, receipt and sufficiency of w
  • NOTE 2 - THE COMBINED MINIMUM TURNOVER OF ALL MEMBERS OF A SUCCESSFUL CONSORTIUM/JOINT VENTURE MUST EQUAL OR EXCEED THE STATED AVERAGE MINIMUM TURNOVER FOR THE ASSOCIATED DISCIPLINE FOR EACH OF THE THREE FINANCIAL YEARS ie 2025, 2024 & 20
  • EXCEED THE STATED AVERAGE MINIMUM TURNOVER FOR THE ASSOCIATED DISCIPLINE FOR EACH OF THE THREE FINANCIAL YEARS ie 2025, 2024 & 2023

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 1. Limestone Offices Development Design Team Brief.pdf, scheduled meeting dates, schedule and lead all design team meetings providing minutes of same in a.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: ITT..

Can you bid?

Public liability insurance

€6,500,000

Professional indemnity insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Architect Led Multi-Disciplinary Design and Cost Management Team

Provision of design and cost management services for a corporate office development, plantroom upgrades, and ancillary works at Shannon Airport.

Documents (40)

PDF

1. Limestone Offices Development Design Team Brief.pdf

1.4 MB · RFT / Invitation to Tender

DOCX

2. Limestone - ITT_S2b_Services_Open_THR_v2.0-04-11-2024.docx

89.5 KB · RFT / Invitation to Tender

PDF

2. Limestone - ITT_S2b_Services_Open_THR_v2.0-04-11-2024.pdf

552.9 KB · RFT / Invitation to Tender

DOCX

3. Limestone - FTS9_Consultancy_v1.10_16-09-2024.docx

257.5 KB · RFT / Invitation to Tender

PDF

3. Limestone - FTS9_Consultancy_v1.10_16-09-2024.pdf

428.8 KB · RFT / Invitation to Tender

DOCX

5. Limestone - COE1_v2.j_Consultancy_Technical_30-09-2024.docx

82.5 KB · Contract / Agreement / Terms

DOCX

MF_2.3_Collateral_Warranty_v1.2_14-10-2024.docx

45.3 KB · Contract / Agreement / Terms

DOCX

3a. SAQ Form 3.4a Lead Designer Architect.docx

40.8 KB · Form / Declaration / Certificate

DOCX

3b. SAQ Form 3.4a C&S Design.docx

40.7 KB · Form / Declaration / Certificate

DOCX

3c. SAQ Form 3.4a Building Services Design.docx

40.7 KB · Form / Declaration / Certificate

DOCX

3d. SAQ Form 3.4a Quantity Surveyor.docx

40.6 KB · Form / Declaration / Certificate

DOCX

3e. SAQ Form 3.4a Fire Safety Design.docx

40.7 KB · Form / Declaration / Certificate

DOCX

4a. SAQ Form 3.4b Lead Designer Architect.docx

40.6 KB · Form / Declaration / Certificate

DOCX

4b. SAQ Form 3.4b C&S Design.docx

43.9 KB · Form / Declaration / Certificate

DOCX

4c. SAQ Form 3.4b Building Services Design.docx

40.8 KB · Form / Declaration / Certificate

DOCX

4d. SAQ Form 3.4b Quantity Surveyor.docx

40.8 KB · Form / Declaration / Certificate

DOCX

4e. SAQ Form 3.4b Fire Safety Design.docx

40.6 KB · Form / Declaration / Certificate

DOCX

6f. SAA Form 9.2c Fire Safety Engineer.docx

48.0 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

40.7 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

25.6 KB · Form / Declaration / Certificate

DOCX

MF_2.4_H_and_S_Compliance_General_v1.0_16-07-2013.docx

21.5 KB · Form / Declaration / Certificate

DOCX

MF_2.5_H_and_S_Compliance_PSDP_v1.0_16-07-2013.docx

21.3 KB · Form / Declaration / Certificate

DOCX

MF_2.7_Declaration_re_Article_57_v1.0_09-02-2022.docx

28.6 KB · Form / Declaration / Certificate

DOCX

MF_2.8_Oath_Valid_v1.0_09-02-2022.docx

22.3 KB · Form / Declaration / Certificate

DOCX

NVB 1(B) - Non Act Vetting Invitation for CPO Aviation Security - January 2022.docx

62.7 KB · Form / Declaration / Certificate

DOCX

SAA Form ID-1 Revision 8 - January 2022.docx

158.0 KB · Form / Declaration / Certificate

DOCX

SNN - EBC DECLARATION.docx

33.5 KB · Form / Declaration / Certificate

PDF

Training Checklist - Nov 24 V1.pdf

209.0 KB · Other

DOCX

1. SAQ Part 1 - QC2_Part_1_v3.1_04-11-2024.docx

147.4 KB · ESPD (European Single Procurement Document)

DOCX

2. SAQ Part 2 - QC_Part_2_v1.1_04-11-2024.docx

60.1 KB · Tender Response Template

DOCX

6a. SAA Form 9.2c Lead Project Architect.docx

45.1 KB · Tender Response Template

DOCX

6b. SAA Form 9.2c C&S Design Engineer.docx

45.1 KB · Tender Response Template

DOCX

6c. SAA Form 9.2c Mechanical Design Engineer.docx

45.2 KB · Tender Response Template

DOCX

6d. SAA Form 9.2c Electrical Design Engineer.docx

45.4 KB · Tender Response Template

DOCX

6e. SAA Form 9.2c Quantity Surveyor.docx

44.9 KB · Tender Response Template

DOCX

Appendix_B1_QC1_and_QC2_09-02-2022.docx

16.6 KB · Appendix / Annex

DOCX

MF_2.10_Reliance_Warranty_v1.0_09-02-2022.docx

47.6 KB · Insurance / Indemnity

DOCX

MF_2.1_Professional_Indemnity_09-02-2022.docx

40.5 KB · Insurance / Indemnity

DOCX

MF_2.9_Reliance_Guarantee_v1.0_09-02-2022.docx

55.1 KB · Insurance / Indemnity

PDF

Queries up to 29.01.2026 (issued 290126).pdf

286.4 KB · Clarification / Addendum

Original notice text

Shannon Airport Authority DAC seeks a multi-disciplinary design and cost management team for a corporate office development and associated upgrades at Shannon Airport, with a contract duration of 12 years.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

09 Feb

View on eTenders ↗

Location

Shannon Airport, Ireland.

Procedure

Open

Clarification

26 Jan 2026

eTenders ID

7249384

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender