Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / DLR Co Co - Brine Manufacturing Plant
Awarded Construction & Civil Engineering Works Open

DLR Co Co - Brine Manufacturing Plant

Value

€300k

Deadline

23 Jan

Dun Laoghaire-Rathdown County Council seeks a contractor for a brine manufacturing plant.

SME fit: High Bid effort: Medium 📍 Dun Laoghaire-Rathdown

Dun Laoghaire-Rathdown County Council seeks a contractor for a brine manufacturing plant.

Bidder profile

Firms with experience in public sector tenders and operational capabilities in manufacturing services.

Risks & flags

  • Eligibility uncertainty
  • Technical granularity dependent on ITT
  • Compliance evidence required early

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Dun Laoghaire-Rathdown County Council
Title DLR Co Co - Brine Manufacturing Plant
CPV / category works
Estimated value 300000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 6 months
Submission deadline 2026-01-23T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

Dun Laoghaire-Rathdown County Council ran this procurement for “DLR Co Co - Brine Manufacturing Plant” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • All parts and operating systems must be covered by a minimum of a 2-year warranty and any additional service requirement on a yearly basis must be clearly listed including
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • [RFT 24038-C3 Brine Manufacturing Plant.docx] any actual or potential conflict of interest, the Contracting Authority may invite Tenderers to propose means by which the conflict of interest might be removed and in circumstances where there are links between Tenderers, the Contracting Authority may seek further information to confirm the Tenders have been prepared independently. The Contracting Authority will, at its absolute discretion, decide on the appropriate course of action, which may in appropriate circumstances include eliminating a Tenderer from this Competition or any Mini-Competition or terminating any Framework Agreement or Services Contract entered into by a Tenderer.
  • RE: Request for Tenders for the Supply of
  • 3.1.1.5. If the reply to any of the questions in sections 3.1.1.1 to 3.1.1.4 was ‘yes’ in relation to any of the notifying parties, please indicate whether during the period in which the undertaking in question was ailing, it received any foreign financial contributions that may have contributed to restore its long-term viability (including any temporary liquidity assistance designed to support that restoration of viability) or to keep that party afloat for the short time needed to work out a restructuring or liquidation plan.
  • 3.1.1.7. If the reply to any of the questions in points 3.1.1.1 to 3.1.1.4 was ‘yes’, please substantiate the answer, including references in the answer to the supporting evidence or documents that are to be provided in annexes (such documents may include,
  • [RFT 24038-C3 Brine Manufacturing Plant.docx] the questions in points 3.1.1.1 to 3.1.1.4 was ‘yes’, please substantiate the answer, including references in the answer to the supporting evidence or documents that are to be provided in annexes (such documents may include, but are not limited to, the notifying party’s latest profit and loss account statements with balance sheets, or court decision opening collective insolvency proceedings on the company or documents providing evidence that the criteria for being placed under insolvency proceedings at the request of creditors under national company law are met, etc.).
  • 3.1.3 Has the notifying party been in receipt of an export financing measure that is not in line with the OECD Arrangement on officially supported export credits (Article 5(1)(c)) of Regulation (EU) 2022/2560.
  • 3.2. For each foreign financial contribution equal to or in excess of EUR 1 million granted to the notifying parties in the three years prior to the notification that may fall into any of the categories of Article 5(1), points (a) to (c) and (e) of Regulation (EU) 2022/2560, the notifying party must provide the following information and provide supporting documents:
  • 3.2.7. Explain whether the financial contribution confers a benefit within the meaning of Article 3 of Regulation (EU) 2022/2560 to the undertaking to which the foreign financial contribution has been granted. Please explain why, with reference to the supporting documents provided under Section 6 (below).
  • [RFT 24038-C3 Brine Manufacturing Plant.docx] .2.8. Explain whether the financial contribution is limited in law or in fact, within the meaning of Article 3 of Regulation (EU) 2022/2560, to certain undertakings or industries. Please explain why, with reference to the supporting documents provided under Section 6 (below).
  • (c) Provision/purchase of goods/services (except financial services) at market terms in the ordinary course of business, for example the provision/purchase of goods or services carried out following a competitive, transparent and non-discriminatory tender procedure. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • 5.1 If applicable, notifying parties should list and substantiate any possible positive effects on the development of the relevant subsidised economic activity on the internal market. Notifying parties should also list and substantiate any other positive effects of the foreign subsidies, such as broader positive effects in relation to the relevant policy objectives, in particular those of the Union, and specify when and where those effects have or are expected to take place. Notifying parties should provide a description of each of those positive effects.

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance — not specified for this tender
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions (valued between €200,000 and €999,000 in the last three years preceding the declaration)
  • 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
  • which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
  • For reporting of foreign financial contributions which are of a value between €200,000 and €999,000 in the last three (3) years preceding the declaration
  • Appendix 3A: Schedule D – Declaration of non-notifiable foreign financial contributions (valued between €1,000,000 and €3,999,000 in the last three years preceding the declaration)
  • 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2026-01-23T12:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2026-01-23T12:00:00+00:00
Date surfaced in documents 31 July 2014
Date surfaced in documents January 2026
Date surfaced in documents January 2025

8. Contract terms that matter

Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • Sector: Office Supplies & Equipment
  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
  • 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration
  • e right to extend the Term for a period or periods of up to 12 months with a maximum of two such extensions p
  • ontinues for 14 calendar days either Party may terminate at 14 days notice
  • breach(es) (if the breach(es) are capable of remedy) within 30 days after receipt of a request in writing f
  • For the Term and for a period of 12 months thereafter (and save in respect of publ

9. Risks, red flags & unusuals

  • Numeric qualification gates were only partially visible, so eligibility certainty required full pack review.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — specialist operator with compliant procurement governance and evidencable experience.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: RFT 24038-C3 Brine Manufacturing Plant.docx, Tenderers shall complete and return the following form of Tenderers

[RFT 24038-C3 Brine Manufacturing Plant.docx, Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix 3A: Schedule D – Declaration of non-notifiable foreign financial contributions, RFT 24038-C3 Brine Manufacturing Plant.docx] Request for Tenders dated, RFT Requirements.

This tender has been awarded

Can you bid?

Minimum turnover

€300,000

Scoring

Most Economically Advantageous Tender

Documents (4)

DOCX

RFT 24038-C3 Brine Manufacturing Plant.docx

189.7 KB · RFT / Invitation to Tender

PDF

24038-C3 Contract Notice.pdf

83.1 KB · Contract / Agreement / Terms

PDF

24038-C3 Appendices A-D.pdf

7.6 MB · Appendix / Annex

DOCX

24038_C3 Brine Manufacturing Plant ESPD.docx

74.0 KB · ESPD (European Single Procurement Document)

Original notice text

This tender involves the establishment and operation of a brine manufacturing plant for Dun Laoghaire-Rathdown County Council, requiring compliance with operational standards and reporting obligations.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€300k

Deadline

23 Jan

View on eTenders ↗

Location

The supply, delivery, installation and commissioning of a Brine Manufacturing Plant and associated brine storage tanks, salt silo and rainwater harvesting system at Dún Laoghaire-Rathdown County Council, Operations Centre, Ballyogan, Dublin 18.

Procedure

Open

Clarification

16 Jan 2026

eTenders ID

7195745

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender