Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Replacement of existing flat roof to St Francis Xavier Senior NS.
Closed Construction & Civil Engineering Works SME Suitable Open

Replacement of existing flat roof to St Francis Xavier Senior NS.

Value

€900k

Deadline

30 Jan

Replacement of flat roof at St. Francis Xavier Senior School.

SME fit: Medium Bid effort: Medium 📍 Dublin

Replacement of flat roof at St. Francis Xavier Senior School.

Bidder profile

Mid-sized to large contractors with experience in public sector roofing projects.

Risks & flags

  • Qualification gate
  • Two-step process
  • Compliance evidence required

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer St. Francis Xavier Senior School
Title Replacement of existing flat roof to St Francis Xavier Senior NS.
CPV / category works
Estimated value 900000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 12 months
Submission deadline 2026-01-30T17:00:00+00:00
Go-live / start not stated

2. Scope of Work

St. Francis Xavier Senior School ran this procurement for “Replacement of existing flat roof to St Francis Xavier Senior NS.” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Ductwork on roof shall be supported using recycled rubber feet and u channel support system
  • rials Paralon Roof Waterproofing system – new build over timber deck or equal
  • Paralon Roof Waterproofing system – new build over timber deck or equal
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • It will be a condition of the award of the Contract that the successful Tenderer shall, for the term of the Contract, comply with all applicable EU and domestic tax laws. Prior to the award of the Contract arising out of this Competition the successful Tenderer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of
  • [Instructions to tenderers - St Francis Xavier Rev 1.docx] Contract that the successful Tenderer shall, for the term of the Contract, comply with all applicable EU and domestic tax laws. Prior to the award of the Contract arising out of this Competition the successful Tenderer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by the Contracting Authority. By supplying these numbers the successful Tenderer acknowledges and agrees that the Contracting Authority has the permission of the successful Tenderer to verify its tax cleared position online.
  • Tenderers must not make any assumptions that the Contracting Authority has prior knowledge of their organisation or service provision. Tenderers will only be evaluated on the information contained in their Tender (as may be clarified in accordance with these Instructions).
  • Where the Particulars state that the required means of tender delivery is electronic submission to the eTenders platform, Tenderers are advised to ensure that they give sufficient time to allow for the successful upload of all Tender documents and that they have a reliable, continual connection speed available for this purpose. Tenderers should ensure that their operating system has sufficient capacity to execute the upload of all the documents included in the Tender submission before the deadline stated in the Particulars. The timely and complete upload of documents is the responsibility of each Tenderer. All files submitted electronically must be capable of being readily viewed in their entirety by the means stated in the Particulars. It is the responsibility of the Tenderer to ensure that electronic documents submitted are not corrupt. Tenderers are advised to consult etenders.gov.ie for information on uploading electronic submissions.
  • Where the Particulars state that the required means of tender delivery is electronic submission (including to the eTenders platform), Candidates must submit a read only PDF copy of the pricing document with their Tender. In accordance with section 9.2 of these Instructions, the Contracting Authority may request that Tenderers provide a copy of the submitted pricing document (as appropriate) in its native file and/or .csv file format. Where requested, Tenders must provide the pricing document in the requested file formats promptly and within the stated timeframe. In the event of inconsistencies between the submitted read only PDF pricing document and either the native file format and/or csv file format, the read only PDF pricing document shall take precedence.
  • If the pricing document (where provided) includes a schedule of items that are not construction operations subject to Relevant Contracts Tax (and therefore to reverse-charge VAT), and, in the Contracting Authority’s opinion, the categorisation of an item, the VAT rate stated, or the value stated is not correct, the Contracting Authority may invoke Section 6.2 of these Instructions. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Title: Replacement of existing flat roof to St Francis Xavier Senior NS.
  • NaN Removal of existing Timber Fascia Board; including any flashings etc; complete in preparation for new Fascia
  • NaN Carefully remove the existing timber fascia board & disposal NaN NaN NaN NaN
  • electrical main cable remove from the existing timber fascia board to be fixed to new fascia board 1

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.;  Public Liability Insurance with a minimum indemnity limit of €6.5 million per occurrence;  Employers’ Liability Insurance with a minimum indemnity limit of €13 million
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  •  Public Liability Insurance with a minimum indemnity limit of €6.5 million per occurrence
  •  Employers’ Liability Insurance with a minimum indemnity limit of €13 million
  • 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works € * public liability €6,500[9] * employer’s liability €6,500[10]
  • 3g Public Liability Insurance and Employer’s Liability Insurance I declare that the above named Contractor has, or (if successful in this tender competition) will take out (prior to appointment), Public Liability Insurance (with a minimum level of cover of €6,500,000) and Employer’s Liability Insurance (wi
  • th a minimum level of cover of €13,000,000) in accordance with the conditions stat

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
If any Bill of Quantities includes an item described as an 'adjustment item', th not stated not stated not stated
If any Bill of Quantities includes method-related charges, the total amount of m not stated not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • procedure may be used for all values of works contracts but must be used for works contracts with a value of less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
  • [Instructions to tenderers - St Francis Xavier Rev 1.docx] The Contracting Authority has sent a contract notice for the Works to eTenders.[1]
  • These documents set out the suitability assessment criteria, the award criterion and the evaluation and award process which will be followed by the Contracting Authority in making the assessment of which Tender is the lowest price. The documents also set out the information which must be supplied by Tenderers. Tenders must be submitted in accordance with these Instructions. Any Tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
    • the completed pricing document[3] (Volume C) [where required]
    • Suitability Assessment Questionnaire(s)
    • the information referred to in Appendix 3 to these Instructions

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2026-01-30T17:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2026-01-30T17:00:00+00:00
Date surfaced in documents 11 Mar 2024
Date surfaced in documents 13 April 2025
Date surfaced in documents 18 November 2024

8. Contract terms that matter

Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • The liability of the Surety under this Bond will not exceed € . This amount will be reduced by half on issue of the Certificate of Substantial
  • nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
  • it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
  • the same terms as the insurances the Contractor is required to have under clause 10
  • Remove Hunton fiber board & slip membrane
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
  • the Works within 12 months after the termination, the Contractor’s payment under this clause

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Instructions to tenderers - St Francis Xavier Rev 1.docx, ITT-W4 v2.0, ITT-W4 v2.0.
  • eTenders CFT / notice reference: contract notice for the Works to eTenders.[1].
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Schedule (Volume B), Appendix 3 to these Instructions, Appendix 2 to these Instructions.

Can you bid?

Public liability insurance

€6,500,000

Professional indemnity insurance

€13,000,000

Scoring

Lowest Price

Lowest Price

Lots (1)

Lot 1: Roof Replacement Project

Replacement of the roof at St Francis Xavier Senior National School.

Documents (30)

PDF

2025.12.11 - Scope of works - St.Francis Xavier Roof works.pdf

497.3 KB · Specification

PDF

A1034-St Francis Xavier SNS - Roof M&E Requirements 2025-12-09.pdf

1.2 MB · Specification

DOCX

Instructions to tenderers - St Francis Xavier Rev 1.docx

69.6 KB · RFT / Invitation to Tender

XLSX

19470S St Francis X - Pricing Doc.xlsx

109.4 KB · Pricing / BOQ / Schedule of Rates

DOCX

DoEY_Contractor_Suitability_Declaration_for_Small_Works.docx

74.4 KB · Contract / Agreement / Terms

DOCX

MF-1.22-09-04-2020.docx

38.6 KB · Contract / Agreement / Terms

DOCX

MF_1.22_Project_Supervisor_09-04-2020 (2).docx

40.5 KB · Contract / Agreement / Terms

PDF

PW-CF6-v1.13-29-07-2021.pdf

434.3 KB · Contract / Agreement / Terms

DOCX

MF-1.23-09-04-2020.docx

38.0 KB · Form / Declaration / Certificate

DOCX

MF_1.21_Performance_Bond_09-04-2020.docx

55.1 KB · Form / Declaration / Certificate

DOCX

MF_1.23_Rates_of_Pay_09-04-2020.docx

39.7 KB · Form / Declaration / Certificate

PDF

24649-COR-XX-00-DR-A-C2000.pdf

1.8 MB · Drawing / Plan / Layout

PDF

24649-COR-XX-00-DR-A-C2001.pdf

157.4 KB · Drawing / Plan / Layout

PDF

24649-COR-XX-00-DR-A-C2002.pdf

196.4 KB · Drawing / Plan / Layout

PDF

24649-COR-XX-00-DR-A-C2003.pdf

162.1 KB · Drawing / Plan / Layout

PDF

24649-COR-XX-00-DR-A-C2004.pdf

209.3 KB · Drawing / Plan / Layout

PDF

24649-COR-XX-00-DR-A-C2005.pdf

170.4 KB · Drawing / Plan / Layout

PDF

24649-COR-XX-00-DR-A-C3001.pdf

223.6 KB · Drawing / Plan / Layout

PDF

24649-COR-XX-00-DR-A-C3002.pdf

602.2 KB · Drawing / Plan / Layout

PDF

24649-COR-XX-00-DR-A-C6001.pdf

135.0 KB · Drawing / Plan / Layout

PDF

St. Fancis Xavier - Roof Works - Issue Sheet - 2025.11.25.pdf

33.4 KB · Drawing / Plan / Layout

PDF

Vision SI Roof Survey.pdf

858.1 KB · Drawing / Plan / Layout

PDF

Asbestos Report - St. Francis Xavier Senior National School - Refurbishment Demolition.pdf

1.6 MB · Other

PDF

Building Condition Survey July 2025.pdf

4.7 MB · Other

PDF

PreliminarySafetyPlan Rev 01.pdf

693.0 KB · Other

PDF

Roof report St Francis Xavier School 11-3-2024 Edit.pdf

824.3 KB · Other

PDF

Roof report St Francis Xavier School 11-3-2024.pdf

818.1 KB · Other

PDF

St Francis Xavier School Thermal Imaging Survey Nov 10 2022.pdf

2.4 MB · Other

PDF

Vision report from 23.04.25.pdf

1.6 MB · Other

DOCX

Tender & Schedule St Francis Xavier SNS 19470S.docx

63.9 KB · Appendix / Annex

Original notice text

This tender involves replacing the existing flat roof at St. Francis Xavier Senior School, including the installation of a new waterproofing system and necessary structural supports.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€900k

Deadline

30 Jan

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

12 Jan 2026

eTenders ID

7189247

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender