Feasibility Study for Pump Track in Ballyhoura Region
Value
€40k
Deadline
10 Dec
10 Dec 2025
Value
€40k
Deadline
10 Dec
The contractor will conduct a feasibility study for a Pump Track across various locations in the Ballyhoura Region. This includes community engagement, ecological assessments, and presenting findings on suitable sites and designs.
Must-haves
Fail any = disqualifiedQuotations must be submitted on time and in the format specified.
Candidates must provide evidence of their tax compliance.
Successful contractor must provide evidence of Insurance Levels: Employer’s Liability Insurance €13 Million, Public Liability Insurance €6.5 Million, Professional Indemnity insurance €2.6 Million.
The tender must be written in English.
The tenderer must not be excluded by any stipulation in this ITT.
Can you bid?
Required certifications
- Tax Clearance Certificate
- Employer’s Liability Insurance
- Public Liability Insurance
- Professional Indemnity Insurance
Public liability insurance
€6,500,000
Professional indemnity insurance
€2,600,000
Background
The project aims to investigate the feasibility of establishing a Pump Track in the Ballyhoura Region, which is expected to enhance recreational opportunities and community engagement. The contractor will be responsible for conducting stakeholder consultations, ecological impact assessments, and presenting findings on the most suitable locations and designs for the Pump Track. The study is anticipated to run from February 2026 to September 2026, involving multiple stages of research and assessment.
What this involves
The contractor will lead a comprehensive feasibility study for a Pump Track at various locations across the Ballyhoura Region. This will include project initiation meetings to establish parameters, initial scoping through research and geographical mapping of potential sites, stakeholder engagement, and site inspections. The contractor will conduct a feasibility assessment of the proposed locations, manage ecological impact assessments, and hold client meetings to discuss findings and prioritize sites. The project will also involve identifying suitable site layouts and presenting various Pump Track styles relevant to each location.
Scoring
Proposal Methodology
Time-Frame
Qualifications
Cost
Lots (1)
Conduct a feasibility study for a Pump Track at various locations in the Ballyhoura Region, including site inspections, stakeholder engagement, ecological assessments, and final reporting.
Documents (1)
PumpTrackFeasability Study.pdf
512.3 KB · RFT / Invitation to Tender
Original notice text
Recreational trails across the Ballyhoura region provide a recreational experience for thousands of people annually and have grown to become a critical part of the sense of place and way of life of the area. The trails are a significant driver of local social, environmental and economic activity and contribute positively to the physical, mental and spiritual health and well-being of residents and visitors. The Ballyhoura Mountain Bike Trail Network is a key part of this recreational infrastructure and the largest of its kind in Ireland, with over 100 kilometres of MTB trails. The network includes trails for all and entices thousands of national and international visitors to the Ballyhoura Region every year. A recent Ballyhoura Trails Masterplan (available here), associated consultations and other local evidence has shown that access to the trails and to the sport for young people and beginners is limited, with a lack of ‘beginner friendly’ trails and other infrastructure to introduce people to the sport and its myriad of associated benefits for individuals and communities. On foot of this, Ballyhoura Development have secured ORIS (Outdoor Recreation Infrastructure Scheme) with a process underway to investigate the feasibility of a Pump Track at various locations across the Ballyhoura Region. Proposals are invited from qualified consultants with proven experience and expertise in regional strategy design and development, community and stakeholder consultation, ecological assessments, data collection and analysis and sustainability to lead the feasibility study. Process should include the following stages and is anticipated to run from Feb 2026 to Sept 2026.
AI analysis updated 4 months, 1 week ago
Value
€40k
Deadline
10 Dec
Location
Ballyhoura Region, covering East Limerick and North Cork
Procedure
Open
Clarification
01 Dec 2025
eTenders ID
7004238
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender