Ballina Flood Relief Scheme
Deadline
31 Oct
31 Oct 2025
Deadline
31 Oct
Operational contract for the Ballina Flood Relief Scheme by Mayo County Council
Operational contract for the Ballina Flood Relief Scheme by Mayo County Council
Bidder profile
Suitable for mid-sized to large firms with public sector experience and operational capabilities in flood relief.
Risks & flags
- Undisclosed contract value
- Qualification gate for turnover
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Mayo County Council_1127 |
| Title | Ballina Flood Relief Scheme |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 15 years |
| Submission deadline | 2025-10-31T17:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Mayo County Council_1127 ran this procurement for “Ballina Flood Relief Scheme” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of its tax status by t
- arrangements and their implementation.
- The Employer, subject to constraints as a public authority, and the Contractor must support
- The Contractor is responsible for the safety and stability of the Works, and of all operations
- access routes to and through the Site, and any required maintenance and upgrading of them,
- facilities, power, water, and other services it requires to complete the Investigation, other than
- on the supply under this contract in addition to the Price.
-
- any VAT arising on the supply under this contract that is chargeable at
- in the framework provision of services), except that the Contractor’s obligation to make Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- The Contractor’s programme showing the order in which the Contractor will do the
- them as desirable for efficient performance, and in particular so that its programme shows
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 3 Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 12; 4 Minimum indemnity limit for professional indemnity insurance annual aggregate €6,500,000 12
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — Engineering category € CA Entry Minimum level of Professional Indemnity Insurance required for € CA Entry Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Minimum level of Public Liability I
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 3 Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 12
- 4 Minimum indemnity limit for professional indemnity insurance annual aggregate €6,500,000 12
- 5 public liability public liability €6,500 12
- 5 employer’s liability employer’s liability €6,500 professional indemnity professional indemnity €70,000 13
- Engineering category € CA Entry Minimum level of Professional Indemnity Insurance required for € CA Entry Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Minimum level of Public Liability I
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Engineering category € CA Entry Minimum level of Professional Indemnity In 2% not stated not stated | |||
| in any one claim below which the will bear the cost is the greater amount of 2% | 2% | not stated | not stated |
| will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- [PW-CF7-v1.6-19-07-2023.pdf] INVESTIGATION CONTRACT
- [PW-CF7-v1.6-19-07-2023.pdf] CONTRACT
- [PW-CF7-v1.6-19-07-2023.pdf] the Schedule. It may include a priced bill of quantities.
- [PW-CF7-v1.6-19-07-2023.pdf] If a party discovers a discrepancy within or between the documents
- [PW-CF7-v1.6-19-07-2023.pdf] certification
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2025-10-31T17:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2025-10-31T17:00:00+00:00 |
| Date surfaced in documents | 19 July 2023 |
| Date surfaced in documents | 16 December 1996 |
| Date surfaced in documents | July 2023 |
8. Contract terms that matter
Contract duration in the extract: 15 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the construction stage for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clauses 12
- Groundwater data loggers are to be installed in a minimum of three standpipes as identified by the
- within 6 months after the termination, the Employer’s Representative must give the above
- When a payment is to be made, not later than 5 days after the date agreed between the
- 14 days of receiving the payment claim notice,
- the Investigation will terminate 14 days after the notice was given, or a differ
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: [
- File reference number attributed by the contracting authority or contracting entity (if applicable) ([[
- Access Number and
- Access Number and Tax Reference Number to facilitate online verification of its tax status by t
- by hand, Tenders must include the number and type of paper and/or electronic copies stated in the
- Number and type of Electronic Copies of
- with IS EN ISO 9001, IS EN ISO 14001 and IS OHSAS 45001
- with Eurocode 7 - IS EN 1997-2:2007 (including the referred normative documents EN ISO 14688 & 14689)
- The location, exploratory hole number and the depth of coring relating
- y coring logs shall be carried out in accordance with IS EN ISO 14688-1, IS EN ISO 14689-1 and
- The test shall be carried out precisely as described in EN ISO 22476-3
- shall be marked with the exploratory hole identification number and shall be
- Section Number Clause Number
Geographic constraints
- within 6 months after the termination, the Employer’s Representative must give the above
- ory hole has been set out and excavated within 1m of the
Scale / volume phrases
- Within 7 days after the Employer sends the Contractor
- The Contractor must start each Task within 7 days after the Employer’s Representative giv
- Within 7 days after the Contractor notifies the Emplo
- d by Met Eireann and published most recently before the day 10 days
- h of the Contractor’s obligations and lasts for longer than 3 months, the Contractor
- permission within 28 days of being asked:
- When a payment is to be made, not later than 5 days after the date agreed between the
- 14 days of receiving the payment claim notice,
- amount due within 14 days after receiving the statement
- must pay the amount due within 30 days after receiving the invoice
- Contractor must give the Employer, within 5 days of receiving the request, a quotation f
- ontractor must give the Employer notice of the claim within 14 days of when
- circumstances and the amount claimed within a further 21 days after giving the notice
- and are never more than 1 month in arrears or unpaid
- If the Employer so requests, the Contractor must, within 7 days after the request, give to the
- 8, and within 10 days of being requested to do so, the
- the Investigation will terminate 14 days after the notice was given, or a differ
- the Employer’s Representative will, within 14 days after receiving the Contractor’s
- within 6 months after the termination, the Employer’s R
- statement to the Contractor within 14 days after the 6 month period (based, if necessary, on
- ertificate, and the Employer must pay the amount due within 30 days after
- the Contractor must pay the Employer the difference within 14 days of receiving the
- must pay the amount due within 30 days of receiving the Contractor’s invoice
- Government Procurement website most recently before the day 10 days before the final date for submission of
- 33 School
TENDER DOCUMENTS [PW-CF7-v1.6-19-07-2023.pdf, PW-CF7-v1.6-19-07-2023.pdf, MGW0290-RPS-00-XX-DR-Z-GI1001 Combined GI-GI1001 D2P02.pdf.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ~$W0290-RPS-00-XXXX-CD-GI003_Tender & Schedule - FTS7.docx, Schedule or an engineer, architect,, Schedule. It may include a priced bill of quantities..
This tender has been awarded
- Priority Geotechnical Limited · 19 Dec 2025
- Priority Geotechnical Limited · 12 Dec 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,500,000
Scoring
Lowest Price
Documents (26)
Ballina FRS_ITT_GI No2_Oct 2025.pdf
944.2 KB
DocA1 QW2-Part-1-v2.1.docx
204.8 KB
DocA2 Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx
41.1 KB
DocA3 Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
34.6 KB
DocA4 Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
29.3 KB
DocA5 Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx
28.9 KB
DocA6 Appendix-C-Bankers-Letter.docx
33.2 KB
DocA7 Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx
30.1 KB
DocA8 3.4.1-HS-Works-Contractor.docx
50.2 KB
DocA9 3.4.2-HS-PSCS-v3.0-28-07-2023.docx
45.7 KB
eESPD.docx
63.4 KB · ESPD (European Single Procurement Document)
ITT-W3-v2.0-18-11-24.docx
67.6 KB
JCA AIA SI works Ballina_REV15072025.pdf
8.5 MB
Marian Crescent_Humbert St Utilities_July 2025.pdf
36.0 MB
MCW0290-RPS-00-GE-RP-G-0002 PSHP for issue.pdf
651.9 KB
MCW0290-RPS-SP-XX-R-G-0002 - Detailed GI Specification.pdf
11.7 MB
MF-1.25.docx
41.7 KB
MF-1.26-09-04-2020 (2).docx
41.3 KB
MGW0290-RPS-00-XX-DR-Z-GI0008 Proposed GI Access Tracks.pdf
4.7 MB
MGW0290-RPS-00-XX-DR-Z-GI1001 Combined GI-GI1001 D2P02.pdf
11.2 MB
MGW0290-RPS-00-XX-DR-Z-UT0002 Moy Utilities.pdf
13.6 MB
MGW0290-RPS-00-XX-DR-Z-UT0006 Bunree Utilities.pdf
3.7 MB
MGW0290-RPS-00-XX-DR-Z-UT0008 Tullyegan Utilities.pdf
1.8 MB
PW-CF7-v1.6-19-07-2023.pdf
397.4 KB
Tender & Schedule - FTS7.docx
52.9 KB
~$MCW0290-RPS-SP-XX-BQ-G-0002.xlsx
165 bytes
Original notice text
Mayo County Council seeks a contractor for the Ballina Flood Relief Scheme, focusing on building, integrating, and operating flood relief services with compliance reporting and handover obligations.
AI analysis updated 4 months ago
Deadline
31 Oct
Buyer
Mayo County CouncilLocation
Ireland
Procedure
Open
Clarification
22 Oct 2025
eTenders ID
6774892
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender