RFT 2025 - 646 - Request for Tender for Monaghan Institute - Energy Upgrade Project
Value
€500k
Deadline
03 Nov
03 Nov 2025
Value
€500k
Deadline
03 Nov
Tender for energy upgrade project at Monaghan Institute for Cavan and Monaghan ETB.
Tender for energy upgrade project at Monaghan Institute for Cavan and Monaghan ETB.
Bidder profile
Mid-sized to large firms with experience in public sector tenders and energy upgrade projects.
Risks & flags
- Qualification gate
- Two-step process
- Technical ambiguity
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Cavan and Monaghan Education and Training Board |
| Title | RFT 2025 - 646 - Request for Tender for Monaghan Institute - Energy Upgrade Project for Cavan and Monaghan Education and Training Board |
| CPV / category | works |
| Estimated value | 500000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 6 months |
| Submission deadline | 2025-11-03T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Cavan and Monaghan Education and Training Board ran this procurement for “RFT 2025 - 646 - Request for Tender for Monaghan Institute - Energy Upgrade Project for Cavan and Monaghan Education and Training Board” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Sector: Building Services & Maintenance
- 5 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- EN 62471 (Photobiological safety of lamps and lamp systems)
- C.15 It has not been guilty of serious misinterpretation in supplying the information required for the verification of the absence of grounds for exclusion or the fulfilment of the selection criteria,
- C.15 It has not been guilty of serious misinterpretation in supplying the information required for the verification of the absence of grounds for exclusion or the fulfilment of the selection criteria,
- C.15 It has been able, without delay, to submit the supporting documents required by a contracting authority or contracting entity, and
- Graphite heat sink for optimum thermal management. Spring ceiling retention system for 1–50mm
- management. Spring ceiling retention system for 1–50mm ceiling thickness. Supplied with
- [Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx] APPENDIX B3: CERTIFICATE OF SATISFACTORY DELIVERY OF SERVICES
- [Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx] required is listed below (where applicable) OTHER INFORMATION
- The criteria below mirror the structure in Section 3.4 (Technical Capability Criteria) of the Questionnaire for consistency but should be answered specifically in relation to the PSCS service. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- allow for adaptor to connect to existing lighting columns.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € CA Entry17 CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m); The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
- Certifications — not specified for this tender
- Past experience — The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € CA Entry17 CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
- Personnel — not specified for this tender
- Geographic / facility constraints — 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 19 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro) Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 1 18-11-2024 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Electrical Contracting15 € 1,000,000 CA SUPPLEMENTARY REQUIREMENTS: N/A
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € CA Entry17 CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
- The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
- aim basis18; The excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
- Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,00019 Maximum level of excess for property only* for any one incident below which the Works Contractor and as PSCS will bear the cost: € 10,000 *No excess is permitted in respect of de
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| The excess as stated here: Maximum permissible excess on Professional Indemnity | 2% | not stated | not stated |
| aim basis18; The excess on Professional Indemnity Insurance in any one claim bel | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 19 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro)
- less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
- [Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1(4).docx] Applicant’s Self Declaration re Regulation 57
- [Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1(4).docx] in human beings (). [If the relevant documentation is available electronically, please indicate the web address, issuing authority or body, precise reference of the documentation. Click here and insert details] ().
- [Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1(4).docx] B.2 If the economic operator has not met all the obligations in B.1 relating to the payment of taxes or social security contributions, please indicate in respect of each breach of such obligations: Taxes: Social Contributions:
- [Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1(4).docx] click here and insert details] [If Yes, click here and insert details]
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2025-11-03T12:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2025-11-03T12:00:00+00:00 |
| Date surfaced in documents | Regulations 2016 |
| Date surfaced in documents | Single 1200 |
| Date surfaced in documents | Output 8759 |
8. Contract terms that matter
Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
- the Works within 12 months after the termination, the Contractor’s payment under this clause
- e Schedule says that a performance bond is required, within 7 days after the Employer sends
- When a payment is to be made, not later than 5 days after the date agreed between the
- Within 14 days of receiving the payment claim notice,
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1(4).docx, Click here
[Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1(4).docx, Appendix-C-Bankers-Letter(1).docx.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Vol A.2(06) Equipment Sched.pdf, Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx, BW-03.pdf.
This tender has been awarded
- MFE Contracts Ltd · 22 Dec 2025
Can you bid?
Required certifications
- Safe-T-Cert
Minimum turnover
€1,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,500,000
Named standards / methodologies
Scoring
Lowest Price
Lots (1)
Documents (47)
1 Preliminary Health & Safety Plan.pdf
329.4 KB
2 Risk Assessment.pdf
177.9 KB
3 Hazards identified.pdf
119.2 KB
3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx
55.6 KB
3.4.2-HS-PSCS-v3.0-28-07-2023.docx
50.4 KB
62-00.pdf
395.1 KB
63-00.pdf
588.5 KB
63-01.pdf
851.9 KB
63-02.pdf
981.5 KB
63-03.pdf
818.8 KB
63-04.pdf
368.9 KB
63-10.pdf
342.3 KB
63-11.pdf
376.0 KB
69-00.pdf
157.5 KB
69-01.pdf
158.1 KB
AI1.1 PW-CF6-v1.14 Short Form of Contract.pdf
612.0 KB
AI1.2 MF1_22 - Contract Form - Appoint of PSCS.docx
40.8 KB
AI1.3 MF-1.23 - Rates of Pay.docx
40.0 KB
Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1(4).docx
46.4 KB
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
36.4 KB
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
31.1 KB
Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx
30.7 KB
Appendix-C-Bankers-Letter(1).docx
35.0 KB
BW-00.pdf
284.6 KB
BW-01.pdf
400.9 KB
BW-02.pdf
516.9 KB
BW-03.pdf
383.3 KB
BW-04.pdf
167.2 KB
Clarification Document 1.pdf
153.0 KB · Clarification / Addendum
CT-00.pdf
409.4 KB
CT-01.pdf
711.6 KB
CT-02.pdf
802.6 KB
CT-03.pdf
745.2 KB
CT-04.pdf
179.6 KB
ITT-W4-v2.0-18-11-24 - Instructions to Tender - Open Procedure.pdf
453.8 KB
QW-Part-2-v1.1-18-11-2024E.docx
67.7 KB
QW2-Part-1-v2.1-18-11-2024-09-01-2025.pdf
651.9 KB
Schedule of Tender Documentation.pdf
123.6 KB
VA.1 - Project Particulars.pdf
359.9 KB
VB.1 FTS-6-v1.6-19-07-2023-1 Form of Tender & Schedules.docx
64.4 KB
Vol A.2(01) Title.pdf
284.5 KB
Vol A.2(02) Section A - Tech Specification.pdf
887.6 KB
Vol A.2(03) Section B - Drg Issue Sheet.pdf
219.8 KB
Vol A.2(04) Drg sheet.pdf
217.8 KB
Vol A.2(05) Section C - Luminaire Schedule.pdf
219.0 KB
Vol A.2(06) Equipment Sched.pdf
1.4 MB
WF-00.pdf
1.6 MB
Original notice text
This tender involves an energy upgrade project at Monaghan Institute, focusing on building services and maintenance to enhance energy efficiency and operational capabilities.
AI analysis updated 4 months ago
Value
€500k
Deadline
03 Nov
Location
Ireland
Procedure
Open
Clarification
23 Oct 2025
eTenders ID
6738133