Refurbishment of Nurses’ Home Bathrooms and Shower Rooms - Phase 1
Value
€500k
Deadline
30 Oct
30 Oct 2025
Value
€500k
Deadline
30 Oct
This tender requires the refurbishment of bathroom and shower facilities in the Nurses' Home at The Rotunda Hospital. The contractor must ensure that all hospital operations continue smoothly during the renovation, with a focus on minimizing disruption and maintaining safety.
Must-haves
Fail any = disqualifiedTax compliant with a valid Revenue Tax Clearance Certificate
Not bankrupt, wound up, or subject to insolvency proceedings
Not convicted of offences relating to professional misconduct, fraud, corruption, or money laundering
All employees on site must hold Safe Pass cards
Valid and up-to-date Safety Statement in compliance with the Safety, Health and Welfare at Work Act 2005
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€13,000,000
Background
The scope of work includes the complete refurbishment of the Nurses' Home bathrooms and shower rooms, which are currently in poor condition. The contractor will be responsible for installing new plumbing, sanitary ware, and finishes while ensuring that the hospital remains operational throughout the project. Special attention must be given to access, noise, and dust control to protect hospital staff and patients.
What this involves
The contractor will undertake the refurbishment of the Nurses' Home bathrooms and shower rooms, which includes the installation of level access showers, new sanitary ware, and plumbing systems. The work must be completed while ensuring that all existing hospital buildings remain operational, with unhindered access for staff and the public. The contractor is required to implement measures to minimize noise, dust, and disruption, including the use of temporary hoarding and sheeting. Additionally, the contractor must manage all craneage, scaffolding, and other access requirements in a live operational environment.
Scoring
Price
Work schedule/programme
RAMS including dust control measures
Lots (1)
Refurbishment works for bathrooms and shower rooms in the Nurses’ Home at The Rotunda Hospital.
Documents (5)
EE-TEN-008 - Invitation to Tender.pdf
2.7 MB · RFT / Invitation to Tender
EE-TEN-008 - Suitability Declaration QW1.pdf
427.9 KB · Form / Declaration / Certificate
Addendum No 01.docx
11.8 KB · Clarification / Addendum
Addendum No 02.docx
11.8 KB · Clarification / Addendum
EE-TEN-008 -Schedule of Principal Items.xls
47.5 KB
Original notice text
The project comprises the refurbishment of existing bathrooms, showers, and WC facilities in the Nurses’ Home (West Block), Rotunda Hospital. Works include: Demolition and removal of existing sanitary ware, partitions, cubicles, showers, baths, WHBs, risers, ceilings and finishes. Installation of new level-access showers, wall-hung WCs, wash hand basins, IPS panels, sanitary fittings, and associated pipework. Provision of new Altro Aquarius R11 non-slip flooring, Whiterock finishes, and suspended ceilings with moisture-resistant tiles. Mechanical works including new hot/cold pipework, isolation valves, drainage, ventilation fans and connections to existing services. Electrical works including replacement of light fittings with IP-rated LED, testing and commissioning. Fire-stopping to risers and penetrations. General builder’s work, access and protection in a live acute hospital environment. Part M compliant level-access showers and sanitary fittings All works are to be carried out to current Building Regulations, HBN/HTM guidance, and infection control standards
AI analysis updated 4 months, 1 week ago
Value
€500k
Deadline
30 Oct
Buyer
The Rotunda HospitalLocation
The Rotunda Hospital, Parnell Square, Dublin 1
Procedure
Open
Clarification
23 Oct 2025
eTenders ID
6624833
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender