Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Rotunda Hospital: Suitability Assessment Questionnaire (SAQ) - Critical Care Wing Enabling Works Contractor as PSCS
Closed Construction & Civil Engineering Works Open

Rotunda Hospital: Suitability Assessment Questionnaire (SAQ) - Critical Care Wing Enabling Works Contractor as PSCS

Deadline

17 Oct

Suitability Assessment for Critical Care Wing Enabling Works at Rotunda Hospital

SME fit: Medium Bid effort: Medium 📍 Dublin

Suitability Assessment for Critical Care Wing Enabling Works at Rotunda Hospital

Bidder profile

Mid-sized to large contractors with experience in public sector projects and a strong health and safety record.

Risks & flags

  • Qualification gate for turnover
  • Undisclosed contract value
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer The Rotunda Hospital
Title Rotunda Hospital: Suitability Assessment Questionnaire (SAQ) - Critical Care Wing Enabling Works Contractor as PSCS
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 5 years
Submission deadline 2025-10-17T14:00:00+00:00
Go-live / start not stated

2. Scope of Work

The Rotunda Hospital ran this procurement for “Rotunda Hospital: Suitability Assessment Questionnaire (SAQ) - Critical Care Wing Enabling Works Contractor as PSCS” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • s/fail standard is a Fetac Level 8 MEP services engineering qualification AND a minimum of 10 years’ experience working in the same role
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • Provide a list of completed projects below for which Works/Works and PSCS Services were provided by the Applicant over the time period stated in the relevant Qualification Criterion stated above that are similar in nature and complexity to the Works required for this Competition.
  • The evidence required to pass this criterion is details of the relevant technicians or technical bodies upon whom the Applicant can call on in order to carry out the work or whom the Applicant can use in regards to quality control. Applicants must also provide evidence of a safety management system.
  • For Type 3 projects Applicants should supply names of any group, body and organisation that the Applicant is a member of and which promotes and has involvement in Health and Safety matters. It should also provide details of any external resource or expertise relevant to this project that are available to
  • [RTH Critical Care Wing Enabling Works QW1-3.4.1 Health and Safety Supplement-Works Contractor.docx] of a safety management system.
  • For Type 3 projects Applicants should supply names of any group, body and organisation that the Applicant is a member of and which promotes and has involvement in Health and Safety matters. It should also provide details of any external resource or expertise relevant to this project that are available to the Applicant's business.
  • Evidence in support of the declarations in Appendix 1 and any requirements set out above must be provided when requested by the Contracting Authority.In place of documentary evidence, Applicants may provide third party certification that their safety management system is in accordance with OHSAS 18001 or equivalent. Certified membership of Safe-T-Cert may be deemed equivalent for the purposes of this criterion. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

    • Health and Safety Policy and Organisation;
    • a copy of our current general health and safety policy; * a general Health and Safety policy document appropriate to a Health and Safety led Construction Management role;

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering € 15,000,000 Minimum level of Professional Indemnity Insurance required for € 6,500,000 Maximum permissible excess on Profe; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 Minimum level of Employer’s Liabili
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering € 15,000,000 Minimum level of Professional Indemnity Insurance required for € 6,500,000 Maximum permissible excess on Profe
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering € 15,000,000 Minimum level of Professional Indemnity Insurance required for € 6,500,000 Maximum permissible excess on Profe
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 Minimum level of Employer’s Liabili
  • The amount of the Performance Bond required (expressed as a percentage of the eventual ): 10 % Period after Substantial € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
claim below which the Contractor will bear the cost is the greater amount of 2% 2% not stated not stated
We have bond facilities in place which would enable us to act as sureties on you 10% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Title: Rotunda Hospital: Suitability Assessment Questionnaire (SAQ) - Critical Care Wing Enabling Works Contractor as PSCS
  • Value: not disclosed (eTenders placeholder)
  • This project number must correspond to the project number given in Appendix B1
  • [RTH Critical Care Wing Enabling Works QW1-Appendix-C-Bankers-Letter.docx] [on Applicant headed paper]
  • [RTH Critical Care Wing Enabling Works QW1-Appendix-C-Bankers-Letter.docx] been drawn down in the amount of € and said facilities will be available for the next months subject to all terms and conditions applicable to the facilities being complied with. It should be noted that facilities may contain an obligation to make capital repayments such that the outstanding amount of the facilities will be substantially reduced well in advance of the expiration of the month period referred to above.
  • [RTH Critical Care Wing Enabling Works QW1-Appendix-B1-List-of-Previous-Works-Projects.docx]

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-10-17T14:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-10-17T14:00:00+00:00
Date surfaced in documents Regulations 2013
Date surfaced in documents Act 2005
Date surfaced in documents Regulations 2007

8. Contract terms that matter

Contract duration in the extract: 5 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • The amount of the Performance Bond required (expressed as a percentage of the eventual ): 10 % Period after Substantial € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond
  • nder similar conditions including the contract used, the number and type of sub-contracts managed, the site location, methodologies to be used in
  • Applicant’s current principal banker dated within the past 3 months
  • cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap
  • ory application, we expect that a bond can be issued within 4 weeks of the receipt by us of the relevant ap
  • I authorise you to provide the information requested overleaf in respect of [Applicant name] ’s term loan and on demand loan \ overdraft accounts (to the extent they exist) to the Rotunda Hospital for the purposes of the above named contract’s prequalification submission.
  • We confirm [ ] (the “Bank”) have been the Contractor’s principal banker for [ ] years.

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: RTH Critical Care Wing Enabling Works QW1-Appendix-C-Bankers-Letter.docx, RTH Critical Care Wing Enabling Works QW1-Appendix-B1-List-of-Previous-Works-Projects.docx, RTH Critical Care Wing Enabling Works QW1-Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Name of Sure

[RTH Critical Care Wing Enabling Works QW1-Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx, RTH Critical Care Wing Enabling Works QW1-3.4.1 Health and Safety Supplement-Works Contractor.docx, Appendix B1.

Can you bid?

Required certifications

  • OHSAS 18001
  • Safe-T-Cert

Minimum turnover

€15,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Technical Merit

Relevant Experience

Price

Lots (1)

Lot 1: Critical Care Wing Enabling Works

Construction enabling works for the Rotunda Hospital Critical Care Wing.

Documents (9)

DOCX

RTH Critical Care Wing Enabling Works QW1-3.4.1 Health and Safety Supplement-Works Contractor.docx

49.3 KB · Contract / Agreement / Terms

DOCX

RTH Critical Care Wing Enabling Works QW1-3.4.2 Health and Safety Supplement-PSCS.docx

44.8 KB · Form / Declaration / Certificate

DOCX

RTH Critical Care Wing Enabling Works QW1-Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1.docx

41.6 KB · Form / Declaration / Certificate

DOCX

RTH Critical Care Wing Enabling Works QW1-Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

27.6 KB · Form / Declaration / Certificate

DOCX

RTH Critical Care Wing Enabling Works QW1-Part-1.docx

220.9 KB · Form / Declaration / Certificate

DOCX

RTH Critical Care Wing Enabling Works QW1-Part-2.docx

58.5 KB · Form / Declaration / Certificate

DOCX

RTH Critical Care Wing Enabling Works QW1-Appendix-B1-List-of-Previous-Works-Projects.docx

33.0 KB · Appendix / Annex

DOCX

RTH Critical Care Wing Enabling Works QW1-Appendix-C-Bankers-Letter.docx

31.7 KB · Appendix / Annex

DOCX

RTH Critical Care Wing Enabling Works QW1-Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx

35.1 KB · Appendix / Annex

Original notice text

The Rotunda Hospital seeks a contractor for enabling works for the Critical Care Wing, requiring compliance with health and safety standards and a robust safety management system.

AI analysis updated 4 months, 1 week ago

Bid ↗
Details

Deadline

17 Oct

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

07 Oct 2025

eTenders ID

6548234

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender