Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / NDA Facilities Management Contract
Closed Facilities Management & Cleaning Services Open

NDA Facilities Management Contract

Value

€250k

Deadline

15 Oct

Facilities management services contract for the National Disability Authority.

SME fit: Medium Bid effort: Medium 📍 Dublin

Facilities management services contract for the National Disability Authority.

Bidder profile

Mid-sized to large firms with experience in public sector facilities management and compliance.

Risks & flags

  • Turnover threshold
  • Two-step qualification process
  • Compliance evidence requirements

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer National Disability Authority (NDA)
Title NDA Facilities Management Contract
CPV / category services
Estimated value 250000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 3 years
Submission deadline 2025-10-15T14:00:00+00:00
Go-live / start not stated

2. Scope of Work

National Disability Authority (NDA) ran this procurement for “NDA Facilities Management Contract” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • e Contracting Authority estimates that the expenditure on the Services to be covered by the proposed may amount to some €250,000 (excl
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
    • The proposed workflow for managing the attendance 1 day per week for 2 hours to carry out any a
  • tion (the “Services Contract”) will be issued for a term of 24 months (“the Term”)
  • Repairs & Maintenance, Storage & Moving Attendance 1 day per week for 2 hours to deliver general
  • [NDA RFT for Facilities Management services.docx] Request for Tenders dated 4 September 2025
  • [NDA RFT for Facilities Management services.docx] of undertakings (in whatever form and regardless of the legal relationship between them) come together to submit a Tender in response to this RFT, the Contracting Authority will deal with all matters relating to this Competition through a single nominated entity authorised to represent all members of the group of undertakings. The Tenderer must provide details of all members of the group of undertakings and their role in the Tender and clearly set out the contact details including name, title, telephone number, postal address, facsimile number and e-mail address of the nominated entity authorised to represent the Tenderer and to whom all communications shall be directed and accepted until this Competition has been completed or terminated. Correspondence from any other person will NOT be accepted, acknowledged or responded to.
  • Prior to and as a condition of award of any Services Contract, the successful Tenderer shall be required to designate a single entity who will carry overall responsibility for the Services Contract (the “Prime Contractor”), irrespective of whether or not tasks are to be performed by a subcontractor or other consortium member (the “Subcontractor”).
  • No publicity regarding this Competition or any Services Contract pursuant to this Competition is permitted unless and until the Contracting Authority has given its prior written consent to the relevant communication.
  • [NDA RFT for Facilities Management services.docx] members of the Oireachtas, or employees and officers of the Contracting Authority and their relatives must be fully disclosed in the Tender or, in the event of this information only coming to the notice of the Tenderer or Subcontractor after the submission of a Tender, must be communicated to the Contracting Authority immediately upon such information becoming known to the Tenderer or Subcontractor.
  • The terms “Registrable Interest” and “Relative” shall be interpreted as per Section 2 of the Ethics in Public Office Acts 1995 and 2001, copies of which are available at www.irishstatutebook.ie. The Contracting Authority will, at its absolute discretion, decide on the appropriate course of action, which may in appropriate circumstances include eliminating a Tenderer from this Competition or terminating any Services Contract entered into by a Tenderer. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • 5.1 If applicable, notifying parties should list and substantiate any possible positive effects on the development of the relevant subsidised economic activity on the internal market. Notifying parties should also list and substantiate any other positive effects of the foreign subsidies, such as broader positive effects in relation to the relevant policy objectives, in particular those of the Union, and specify when and where those effects have or are expected to take place. Notifying parties should provide a description of each of those positive effects.

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Insurance type Minimum level of indemnity Currently hold Undertake to obtain if successful Employers Liability € 13,000,000 Public Liability € 6,500,000 in respect of any one claim Pr; oduct Liability Not applicable for this project on ‘each claim’ basis Professional Indemnity €1,000,000 on ‘each claim’ basis Cyber Liability €1,000,000 Liability Not applicable for this project on ‘each claim’ basis Professional Indemnity €1,000,000 on ‘each claim’ basis Cybe
  • Certifications — not specified for this tender
  • Past experience — oduct Liability Not applicable for this project on ‘each claim’ basis Professional Indemnity €1,000,000 on ‘each claim’ basis Cyber Liability €1,000,000 Liability Not applicable for this project on ‘each claim’ basis Professional Indemnity €1,000,000 on ‘each claim’ basis Cybe
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Minimum Turnover Requirement Insert “Yes” or “No” The Tenderer must have achieved a turnover of at least €1,000,000 in each of the three previous financial
  • Insurance type Minimum level of indemnity Currently hold Undertake to obtain if successful Employers Liability € 13,000,000 Public Liability € 6,500,000 in respect of any one claim Pr
  • oduct Liability Not applicable for this project on ‘each claim’ basis Professional Indemnity €1,000,000 on ‘each claim’ basis Cyber Liability €1,000,000 Liability Not applicable for this project on ‘each claim’ basis Professional Indemnity €1,000,000 on ‘each claim’ basis Cybe

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions (valued between €200,000
  • Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions (valued between €200,000 and €999,000 in the last three years preceding the declaration)
  • 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
  • For reporting of foreign financial contributions which are of a value between €200,000 and €999,000 in the last three (3) years preceding the declaration
  • Appendix 3A: Schedule D – Declaration of non-notifiable foreign financial contributions (valued between €1,000,000 and €3,999,000 in the last three years preceding the declaration)
  • 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-10-15T14:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-10-15T14:00:00+00:00
Date surfaced in documents 15 October 2025
Date surfaced in documents 18 September 2025
Date surfaced in documents 4 September 2025

8. Contract terms that matter

Contract duration in the extract: 3 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
  • 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration
  • NOW IT IS HEREBY AGREED in consideration of the sum of €2.00 (the receipt of which is hereby acknowledged by the Contractor) as follows:
  • tion (the “Services Contract”) will be issued for a term of 24 months (“the Term”)
  • e right to extend the Term for a period or periods of up to 12 months with a maximum of two such extension or
  • e right to extend the Term for a period or periods of up to 12 months months with a maximum of 2 such extensi
  • [insert number]calendar days either Party may terminate at 14 days notice

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: NDA RFT for Facilities Management services.docx, To be completed by notifying parties where the value of the procurement procedure is equal to or greater than the financial thresholds in Article 28 of Regulation (EU) 2022/2560 and where the notifying party has been in receipt of foreign financial contributions that do not exceed de minimis aid as defined in Article 3(2) of Regulation (EU) 1407/201

[NDA RFT for Facilities Management services.docx, To be completed by notifying parties where the value of the procurement procedure is equal to or greater than the financial thresholds in Article 28 of Regulation (EU) 2022/2560 and where the notifying party has been in receipt of aggregated foreign

[NDA RFT for Facilities Management services.docx.

  • eTenders CFT / notice reference: OJEU Open procedure.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions, Appendix 3A: Schedule D – Declaration of non-notifiable foreign financial contributions, RFT for Facilities Management services.docx] Request for Tenders dated 4 September.

Can you bid?

Minimum turnover

€1,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,000,000

Scoring

Most Economically Advantageous Tender

Professional Capability

22.5%

Lots (1)

Lot 1: Facilities Management Services

Provision of regular, preventative, and reactive maintenance services for NDA assets.

Documents (4)

DOCX

NDA Appendix 1 Requirements and Specifications (1).docx

29.7 KB · Specification

DOCX

NDA RFT for Facilities Management services.docx

152.0 KB · RFT / Invitation to Tender

DOCX

NDA Appendix 2 Pricing Schedule Facilities.docx

37.6 KB · Pricing / BOQ / Schedule of Rates

DOCX

NDA Tender Response Document Facilities Management.docx

99.5 KB · Tender Response Template

Original notice text

The National Disability Authority seeks a contractor for facilities management services, including repairs and maintenance, over a 3-year term with an estimated value of €250,000.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€250k

Deadline

15 Oct

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

18 Sep 2025

eTenders ID

6383086

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender