← Tenders / NEW BUILD OF A 18M PASSENGER BARGE
Closed supplies Supplies Open

NEW BUILD OF A 18M PASSENGER BARGE

Deadline

25 Sep

Tender for the construction of an 18m passenger barge for Street Art Ink

SME fit: Medium Bid effort: Medium 📍 Ireland

Tender for the construction of an 18m passenger barge for Street Art Ink

Bidder profile

Firms with public-sector tender experience and operational capability in construction and service maintenance are preferred.

Risks & flags

  • Undisclosed contract value
  • Partial visibility of qualification criteria
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Street Art Ink
Title NEW BUILD OF A 18M PASSENGER BARGE
CPV / category supplies
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length not stated
Submission deadline 2025-09-25T16:30:00+00:00
Go-live / start not stated

2. Scope of Work

Street Art Ink ran this procurement for “NEW BUILD OF A 18M PASSENGER BARGE” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Core service configuration, integration, and ongoing support obligations were referenced but not numerically defined in the extract.
  • ITT-stage documents were expected to carry the granular technical schedules, acceptance tests, and phased rollout details.
  • The bidder had to evidence ability to mobilise, operate, and maintain the contracted service profile for the full term.

3. Background & buyer context

The extract showed a structured PQQ-to-ITT sequence intended to shortlist capable bidders before full award-stage submission. Programme and policy framing was only partially visible, but continuity and modernisation drivers were evident in the procurement design.

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance — not specified for this tender
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — not specified in extract.
  • Case studies (number/value range) — not specified in extract.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-09-25T16:30:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-09-25T16:30:00+00:00
Date surfaced in documents 3 Deck 4158
Date surfaced in documents Object 1000
Date surfaced in documents Deck 2100

8. Contract terms that matter

Contract duration in the extract: not stated. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • *Part Panel Planelayer Cog_len Cog_trans Cog_vert Weight Description *02 09 2025

9. Risks, red flags & unusuals

  • Numeric qualification gates were only partially visible, so eligibility certainty required full pack review.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — specialist operator with compliant procurement governance and evidencable experience.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Parts-cog-list.lst.txt.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix/Schedule documents referenced in the source pack.

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (6)

PDF

SA-2000-02 (General Arrangement 09-12-2024).pdf

468.9 KB · Drawing / Plan / Layout

PDF

SA-2000-02 (General Arrangement 22-11-2024).pdf

462.3 KB · Drawing / Plan / Layout

PDF

SA-2002-00 (Fire and Safety Plan 09-12-2024).pdf

803.6 KB · Drawing / Plan / Layout

PDF

SA-2003-00 (Colreg Information 09-12-2024).pdf

329.0 KB · Drawing / Plan / Layout

PDF

SA-3000-00 1 of 2 (Structural Arrangement 09-12-2024).pdf

323.3 KB · Drawing / Plan / Layout

OTHER

Parts-cog-list.lst.txt

30.9 KB · Other

Original notice text

Street Art Ink seeks a contractor for the new build of an 18m passenger barge, requiring integration and operational support. The project involves building, integrating, and maintaining the service with compliance to reporting obligations.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

25 Sep

View on eTenders ↗

Location

The project is located in Ireland, with specific details not disclosed.

Procedure

Open

Clarification

01 Sep 2025

eTenders ID

6360177

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender