← Tenders / National Orthopaedic Hospital – Generator Resilience Project
Awarded Construction & Civil Engineering Works Open

National Orthopaedic Hospital – Generator Resilience Project

Deadline

26 Aug

Generator resilience project at National Orthopaedic Hospital for improved power supply.

SME fit: Medium Bid effort: Medium 📍 Dublin

Generator resilience project at National Orthopaedic Hospital for improved power supply.

Bidder profile

Ideal for mid-sized to large firms with experience in public sector projects and generator systems.

Risks & flags

  • Undisclosed contract value
  • Qualification gate for turnover
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer National Orthopaedic Hospital Cappagh
Title National Orthopaedic Hospital – Generator Resilience Project
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 12 months
Submission deadline 2025-08-26T11:30:00+00:00
Go-live / start not stated

2. Scope of Work

National Orthopaedic Hospital Cappagh ran this procurement for “National Orthopaedic Hospital – Generator Resilience Project” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • 10.3 Minimum indemnity limit for public liability insurance. €6.5m for any one event. (Limit may be on an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.)
  • The existing Elective Hospital provides a full range of Orthopaedic Services, with 130 beds, 6 surgical theatres, advanced diagnostic facilities, a High Dependency Unit, a Central Decontamination Unit, an Outpatients Department, and ancillary supporting infrastructure.
  • NOHC has a long tradition of providing quality care since its establishment in 1908, consistently ranking in the top hospitals nationally in HIQA’s National Patient Experience Survey. The Hospital’s existing elective care system is a paragon of efficiency and highly flexible in response to increased demand. The Hospital’s activity has grown substantially over the past five years. The Hospital has huge potential for further expansion and sits on an 11.6-hectare site. As illustrated in Figure 1.2 and 1.3 above, most of this landholding is undeveloped.
  • There is an urgent need to address deficits in the Hospital’s infrastructure in order to support and sustain this growth in activity, to provide a better patient experience, and to improve the working environment for staff.
  • The existing generators are both operated automatically during a power outage where the main hospital and CDU (central decontamination unit) are provided with back-up power supply. The control system and strategy in place needs to be more robust and provide for greater resilience to ensure critical hospital activity can continue without any downtime. The Volvo generator is now end of life and has limited spare parts available. NOHC need to upgrade their overall generator systems and
  • [2025-08-05 Generator Resilience - Project Brief.docx] provided with back-up power supply. The control system and strategy in place needs to be more robust and provide for greater resilience to ensure critical hospital activity can continue without any downtime. The Volvo generator is now end of life and has limited spare parts available. NOHC need to upgrade their overall generator systems and controls to provide ongoing resilience, adequate control with increased capacity due to planned projects and decarbonising plans. The new overall system must ensure that the main hospital and the on-site CDU are provided with immediate back-up power in a power failure event.
  • A detailed control strategy will be required detailing all requirements and outlining the proposed SOP and checklist to the on-site maintenance team.
  • The Main Contractor (Generator Specialist) shall be responsible for the supply, installation and commissioning of 2 new 800KVA standby Generators to the Cappagh Hospital Energy Centre. The 2no. new 800kVA Generator (open) shall be paralleled in a N+1 arrangement via onboard generator controllers and local switchgear. The Main Contractor shall also be responsible for all electrical and control requirements and modifications as well as synchronisation of the existing hospital supply.
  • The completed control strategy shall allow for both auto and manual retransfer in phase and in synch with mains supply upon power restoration.
  • Preconstruction Survey: Before starting work on designated items take site dimensions, review all service trenches, ducting etc. and record on drawings, and use to ensure accurate fabrication and installation.
  • Co-ordinate the implementation of the construction regulations by contractors;
  • Co-ordinate the provision and maintenance of welfare facilities; Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • EXISTING MAIN DISTRIBUTIONS BOARD FOR
  • NEW LV CABLING AND TRAY WITHIN EXISTING
  • FOR THE REMOVAL OF EXISTING CABLING WHEN
  • EXISTING ADJACENT THE ENERGY CENTRE

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ) Minimum indemnity limit for employer’s liability insurance €13.0m for any one event ; 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works € * public liability €6,500[9] * employer’s liability €6,500[10]
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • ) Minimum indemnity limit for employer’s liability insurance €13.0m for any one event
  • 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works € * public liability €6,500[9] * employer’s liability €6,500[10]

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
The amount of the performance bond is to be 0%[7] of the Pr 0% not stated not stated
Percentage of Price to be paid after Employer certifies the Works are substa 100% not stated not stated
12.3 Percentage of the unpaid portion of the Price to be paid if Employer te 4% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • [25694-VCE-ZZ-ZZ-DR-E-151.pdf] Consulting Engineers Ltd.
  • [25694-VCE-ZZ-ZZ-DR-E-152.pdf] X1 4
  • [25694-VCE-ZZ-ZZ-DR-E-152.pdf] ROLLER
  • [25694-VCE-ZZ-ZZ-DR-E-1000.pdf] RATOATH ROAD
  • [25694-VCE-ZZ-ZZ-DR-E-1000.pdf] 570

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-08-26T11:30:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-08-26T11:30:00+00:00
Date surfaced in documents 19 July 2023
Date surfaced in documents 6 August 2025
Date surfaced in documents July 2023

8. Contract terms that matter

Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • (b) expiry of at least 21 days written notice to terminate this Tender
  • We have examined and understand the Conditionsof the Short Public Works Contract and the documents listed in the attached Schedule. We offer to complete the Works on the terms of and in conformity with that contract for the lump sum of
  • If included in the attached Schedule or elsewhere in the attached documents, we also offer to accept appointment as project supervisor for the construction stage on terms required by the Contract if appointed as Contractor for the Works.
  • (b) expiry of at least 21 days written notice to terminate this Tender given by us, which may not
  • 1.10 Performance Bond required
  • The amount of the performance bond is to be 0%[7] of the Price (as stated in the accepted tender) up to issue of the certificate of the date that the Works are substantially complete, and 5%[8] of the Price (as so stated) for the subsequent period stated in the form of bond.
  • 4.1 Interim payment Monthly 100% of the value of Works completed and materials delivered to the Site with title vested in the Employer to the Employer’s satisfaction

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Volume B FTS-6-v1.6-19-07-2023.docx, 25694-VCE-ZZ-ZZ-DR-E-151.pdf, 25694-VCE-ZZ-ZZ-DR-E-152.pdf.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: 25694-VCE-ZZ-ZZ-DR-E-1000.pdf, 25694-VCE-ZZ-ZZ-DR-E-200.pdf, 25694-VCE-ZZ-ZZ-DR-E-100.pdf.

This tender has been awarded

Can you bid?

Public liability insurance

€6,500,000

Professional indemnity insurance

€13,000,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Generator Resilience Project

Works related to the Generator Resilience Project at the National Orthopaedic Hospital Cappagh.

Documents (11)

DOCX

Volume B FTS-6-v1.6-19-07-2023.docx

58.6 KB · RFT / Invitation to Tender

DOCX

2025-08-05 Generator Resilience - Project Brief.docx

6.1 MB

PDF

25694-VCE-ZZ-ZZ-DR-E-100.pdf

678.8 KB

PDF

25694-VCE-ZZ-ZZ-DR-E-1000.pdf

666.6 KB

PDF

25694-VCE-ZZ-ZZ-DR-E-150.pdf

363.0 KB

PDF

25694-VCE-ZZ-ZZ-DR-E-151.pdf

282.0 KB

PDF

25694-VCE-ZZ-ZZ-DR-E-152.pdf

260.8 KB

PDF

25694-VCE-ZZ-ZZ-DR-E-200.pdf

1.3 MB

PDF

25694-VCE-ZZ-ZZ-DR-E-201.pdf

1.4 MB

PDF

25694-VCE-ZZ-ZZ-DR-E-250.pdf

630.3 KB

DOCX

ESPD - European Single Procurement Document.docx

90.3 KB · ESPD (European Single Procurement Document)

Original notice text

This project involves upgrading the generator systems at the National Orthopaedic Hospital to ensure reliable backup power during outages, enhancing operational resilience and capacity.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

26 Aug

View on eTenders ↗

Location

National Orthopaedic Hospital Cappagh, Finglas, Dublin 11

Procedure

Open

Clarification

19 Aug 2025

eTenders ID

6257794

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender