← Tenders / Demolition of Charging Shed and Associated Civil and M and E Works at Shannon Airport
Closed Construction & Civil Engineering Works Open

Demolition of Charging Shed and Associated Civil and M and E Works at Shannon Airport

Deadline

05 Sep

Demolition and civil works at Shannon Airport.

SME fit: Medium Bid effort: Medium 📍 Clare

Demolition and civil works at Shannon Airport.

Bidder profile

Firms with experience in public procurement and demonstrated compliance with insurance and turnover requirements.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Shannon Airport Authority DAC
Title Demolition of Charging Shed and Associated Civil and M and E Works at Shannon Airport
CPV / category works / Construction & Civil Engineering
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Less than 700 movements per year for the busiest 3 months
Contract length not stated
Submission deadline 2025-09-05T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for Demolition of Charging Shed and Associated Civil and M and E Works at Shannon Airport. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Shannon Airport Authority DAC.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: Turnover shall satisfy a minimum average of €2,000,000 per annum over the three previous finan; 1 Employers Liability Insurance for Works Contractor, PSCS and Designer Minimum level of Employers Liability Insurance required is €13m; 2 Public Liability Insurance for Building Works Minimum level of Public Liability Insurance required is €6.5m 3

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — Turnover shall satisfy a minimum average of €2,000,000
  • Insurance
  • Public Liability — €6.5m
  • Professional Indemnity — €1.5m
  • Motor — €127m
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: Turnover shall satisfy a minimum average of €2,000,000 per annum over the three previous finan; 1 Employers Liability Insurance for Works Contractor, PSCS and Designer Minimum level of Employers Liability Insurance required is €13m; 2 Public Liability Insurance for Building Works Minimum level of Public Liability Insurance required is €6.5m 3

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
On Limit With Unlimited Bodily Injury And 5 not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2025-09-05T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): 24 BAGGAGE BASEMENT OPERATING PROCEDURES.pdf, - Non Act Vetting Invitation for CPO Aviation Security - January 2022.docx
  • eTenders CFT ID: not stated
  • Clarification contact / portal: [email protected]
  • Priority attachments: 24 BAGGAGE BASEMENT OPERATING PROCEDURES.pdf, - Non Act Vetting Invitation for CPO Aviation Security - January 2022.docx, 11914-6203 Proposed Demo Survey.pdf

Can you bid?

Required certifications

  • Tax Clearance
  • Certificate of Registration/Incorporation
  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€2,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Documents (73)

PDF

24.2819 BLD-01-A1.pdf

434.8 KB · Drawing / Plan / Layout

PDF

01 PROMULGATION OF AERODROME OPERATIONAL INFORMATION.pdf

534.0 KB

PDF

02 FOD CONTROL PRINCIPLES.pdf

1.5 MB

PDF

03 ACCIDENT, INCIDENT AND OCCURRENCE REPORTING.pdf

728.8 KB

PDF

04 PROCEDURES FOR PERMISSION TO ACCESS THE AERODROME MOVEMENT AREA.pdf

518.1 KB

PDF

05 PROCEDURE FOR THE CONTROL OF PEDESTRIANS AND VEHICULAR TRAFFIC ON THE AERODROME MOVEMENT AREA.pdf

874.2 KB

PDF

06 PROCEDURE FOR AIRBRIDGE OPERATIONS.pdf

725.3 KB

PDF

07 PROCEDURE FOR MARSHALLING AND PARKING AIRCRAFT.pdf

1.5 MB

PDF

08 PROCEDURE FOR CODE F AIRCRAFT ON THE APRON.pdf

869.8 KB

PDF

09 ENGINE RUN UP PROCEDURES.pdf

1.2 MB

PDF

10 REMOVAL OF DISABLED AIRCRAFT.pdf

1.0 MB

PDF

11914 - DEMP Report.pdf

647.3 KB

PDF

11914 - SAA Ground Power Charging Shed - Vol C Pricing Document.pdf

4.6 MB

PDF

11914 - Volume 2B - Civil Particular Specification.pdf

347.4 KB

PDF

11914 AASR Shannon Airport Charging Shed Demolition V1.pdf

1.4 MB

PDF

11914 Charging Shed SAQ.pdf

1.2 MB

PDF

11914 Charging Shed Vol 3B Form of Tender.pdf

438.8 KB

PDF

11914 SAA Charging Shed Instructions to Tenderers.pdf

470.3 KB

PDF

11914 Volume 2A Project Particulars Rev01.pdf

1.1 MB

PDF

11914-6201 Proposed Demo Layout.pdf

1.0 MB

PDF

11914-6202 Site Development Details.pdf

392.6 KB

PDF

11914-6203 Proposed Demo Survey.pdf

337.0 KB

PDF

11914-6204 Proposed Contractor Site Compound Location.pdf

895.0 KB

PDF

11914-6205 Proposed Contractor Site Compound Layout.pdf

583.2 KB

PDF

11914-SAA -Ground Power Charging Shed - PSDP Preliminary Health and Safety Plan - Rev01.pdf

2.1 MB

PDF

11A 11B MANAGEMENT OF CONSTRUCTION MAINTENANCE PROJECTS.pdf

930.2 KB

PDF

12 AIRSIDE INSPECTION PROCEDURES.pdf

1.3 MB

PDF

13 PROCEDURES FOR THE ASSESSMENT AND CARE OF PAVEMENT SURFACE CONDITIONS ON THE AERODROME MOVEMENT AREA.pdf

824.5 KB

PDF

14 PROCEDURE FOR SNOW & ICE CONDITIONS.pdf

1.9 MB

PDF

15 Unassigned.pdf

66.1 KB

PDF

16 BIRD HAZARD & WILDLIFE MANAGEMENT PLAN.pdf

1.4 MB

PDF

17 PROCEDURES FOR REDUCED AND LOW VISIBILITY OPERATIONS AT SHANNON AIRPORT.pdf

1.7 MB

PDF

18 PROCEDURE FOR AVIATION FUEL MANAGEMENT.pdf

775.0 KB

PDF

19 PROCEDURE FOR HANDLING OF HAZARDOUS GOODS.pdf

668.8 KB

PDF

20 PROCEDURE FOR ENVIRONMENT MANAGEMENT.pdf

319.0 KB

PDF

2024-miscellaneous-charges-booklet.pdf

950.4 KB

PDF

21 AERODROME SAFEGUARDING PROCEDURE .pdf

601.6 KB

PDF

22 PROCEDURE FOR OPERATIONS DURING HOURS OF DARKNESS.pdf

292.4 KB

PDF

23 PROCEDURES FOR SITING AND PROTECTING NAVIGATIONAL AIDS.pdf

248.0 KB

PDF

24 BAGGAGE BASEMENT OPERATING PROCEDURES.pdf

579.9 KB

PDF

24.2819 E100_-A1.pdf

3.9 MB

PDF

24.2819 E200_-A1.pdf

2.8 MB

PDF

24.2819 E300_-A1.pdf

2.9 MB

PDF

24.2819 E400_-A1.pdf

2.0 MB

PDF

24.2819 E500_-A1.pdf

176.9 KB

PDF

24.2819 Electrical Drawing Register.pdf

127.0 KB

PDF

24.2819 M100_-A1.pdf

1.8 MB

PDF

24.2819 Mechanical Drawing Register.pdf

121.8 KB

PDF

24.2819 SP-100-A1.pdf

1.9 MB

PDF

242819 Electrical Specification.PDF

2.1 MB

PDF

242819 Electrical Works Schedule of Rates.PDF

327.7 KB

PDF

242819 M&E Builders Works Drawing Register.PDF

123.4 KB

PDF

242819 Mechanical Schedule of Rates.PDF

297.0 KB

PDF

242819 Mechanical Specification.PDF

843.0 KB

PDF

25 PROCEDURE FOR DRIVING ON THE INTERNAL AIRFIELD PERIMETER ROAD.pdf

608.3 KB

PDF

26 PROCEDURE FOR THE USE OF FIXED GROUND POWER.pdf

344.1 KB

PDF

27 SAFETY INSTRUCTIONS FOR AIRCRAFT POWER-BACK PROCEDURES.pdf

277.6 KB

PDF

28 PROCEDURE FOR AMBULIFT EQUIPMENT DURING MEDICAL DIVERSIONS OR DECLARED EMERGENCIES.pdf

353.6 KB

PDF

29 PROCEDURE FOR THE CONTROL OF APRON HAZARDS, FOD, SPILLAGES, WASTE & ENGINE HAZARDS.pdf

531.6 KB

PDF

30 PROCEDURES IN THE EVENT OF ADVERSE WEATHER.pdf

375.0 KB

PDF

31 INTOXICANTS POLICY.pdf

346.4 KB

PDF

32 PUSHBACK and START-UP PROCEDURES.pdf

367.9 KB

PDF

33 AIRSIDE SAFETY TRAINING REQUIREMENTS PROCEDURE.pdf

546.8 KB

PDF

Bulk Sample SAA Swiss Port Canopy - Sept 2021.pdf

165.4 KB

PDF

Contents.pdf

101.2 KB

PDF

Garda Security Check Form.pdf

538.7 KB

DOCX

NVB 1(B) - Non Act Vetting Invitation for CPO Aviation Security - January 2022.docx

62.7 KB

PDF

P25-60304 Planning Permission Application Report.pdf

663.5 KB

PDF

P25-60304 Planning Permission Conditions.pdf

126.3 KB

PDF

P25-60304 Planning Permission.pdf

370.4 KB

PDF

PUM-12146-U-DR-0001-01.pdf

1.5 MB

DOCX

SAA Form ID-1 Revision 8 - January 2022.docx

158.0 KB

PDF

Shannon ID Application Form.pdf

1.8 MB

Original notice text

This tender involves the demolition of the Charging Shed and associated civil and mechanical works at Shannon Airport, ensuring compliance with public procurement standards.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

05 Sep

View on eTenders ↗

Location

Less than 700 movements per year for the busiest 3 months.

Procedure

Open

Clarification

15 Aug 2025

eTenders ID

6241305

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender