Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Fire Safety Emergency Works at Loreto College Secondary School, Mullingar
Closed Building Services & Maintenance Works Open

Fire Safety Emergency Works at Loreto College Secondary School, Mullingar

Deadline

05 Sep

Fire safety emergency works at Loreto College Secondary School in Mullingar

SME fit: Medium Bid effort: Medium 📍 Westmeath

Fire safety emergency works at Loreto College Secondary School in Mullingar

Bidder profile

Ideal for firms experienced in fire safety works and public procurement compliance.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Loreto College (Mullingar)
Title Fire Safety Emergency Works at Loreto College Secondary School, Mullingar
CPV / category works / Building Services & Maintenance
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2025-09-05T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for Fire Safety Emergency Works at Loreto College Secondary School, Mullingar. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Building Services & Maintenance under buyer workflows in Loreto College (Mullingar).
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category15 € 450,000 CA Note: if stating a minimum yearly tur; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € N/A17 CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m); 1 18-11-2024 Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category15 € 450,000
  • Insurance
  • Public Liability — €6,500,00019M
  • Employer's Liability — €13,000,00020
  • Professional Indemnity — €5,000.
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category15 € 450,000 CA Note: if stating a minimum yearly tur; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € N/A17 CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m); 1 18-11-2024 Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: MEATH - FIRE SAFETY.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2025-09-05T12:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): -DR-SK03_T0_PROPOSED FIRST FLOOR PLAN.pdf, 02. QW-Part-2-v1.1-18-11-2024E.docx
  • eTenders CFT ID: not stated
  • Clarification contact / portal: [email protected]
  • Priority attachments: -DR-SK03_T0_PROPOSED FIRST FLOOR PLAN.pdf, 02. QW-Part-2-v1.1-18-11-2024E.docx, Contents.pdf

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€450,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€5,000

Scoring

Most Economically Advantageous Tender

Documents (40)

PDF

01. Preliminary Safety & Health Plan (Fire Safety Measures - Door Replacement).pdf

433.9 KB

PDF

01. QW2-Part-1-v2.1-18-11-2024.pdf

647.2 KB

PDF

02. ITT-W4-v2.0-18-11-24.pdf

449.2 KB

DOCX

02. QW-Part-2-v1.1-18-11-2024E.docx

58.3 KB

DOCX

03. Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

37.8 KB

PDF

03. PW-CF6-v1.14-19-07-2023.pdf

612.0 KB

PDF

04. 3.4.1-HS-Works-Contractor-v3.0-28-07-2023.pdf

229.3 KB

PDF

05. 3.4.2-HS-PSCS-v3.0-28-07-2023.pdf

275.6 KB

PDF

22-029(01)-DR-01_T0_EXISTING SITE LAYOUT PLAN.pdf

11.1 MB

PDF

22-029(01)-DR-02_T0_PROPOSED LOWER GROUND FLOOR PLAN.pdf

266.5 KB

PDF

22-029(01)-DR-03_T0_PROPOSED GROUND FLOOR PLAN.pdf

311.3 KB

PDF

22-029(01)-DR-04_T0_PROPOSED FIRST FLOOR PLAN.pdf

285.3 KB

PDF

22-029(01)-DR-05_T0_PROPOSED SECOND FLOOR PLAN.pdf

185.8 KB

PDF

22-029(01)-DR-06_T0_INTERNAL DOOR & WINDOW SCHEDULE - SHEET 1 OF 3.pdf

250.1 KB

PDF

22-029(01)-DR-07_T0_INTERNAL DOOR & WINDOW SCHEDULE - SHEET 2 OF 3.pdf

264.6 KB

PDF

22-029(01)-DR-08_T0_INTERNAL DOOR & WINDOW SCHEDULE - SHEET 3 OF 3.pdf

743.4 KB

PDF

22-029(01)-DR-09_T0_PROPOSED NEW LOBBY DETAILS.pdf

1023.9 KB

PDF

22-029(01)-DR-SK01_T0_PROPOSED LOWER GROUND FLOOR PLAN.pdf

268.0 KB

PDF

22-029(01)-DR-SK02_T0_PROPOSED GROUND FLOOR PLAN.pdf

318.2 KB

PDF

22-029(01)-DR-SK03_T0_PROPOSED FIRST FLOOR PLAN.pdf

293.5 KB

PDF

22-029(01)-DR-SK04_T0_PROPOSED SECOND FLOOR PLAN.pdf

182.7 KB

PDF

22-029(01)IS01_T0_ISSUE SHEET.pdf

111.1 KB

PDF

23115 E300-1.4.pdf

448.7 KB

PDF

23115 E300-2.4.pdf

592.6 KB

PDF

23115 E300-3.4.pdf

536.6 KB

PDF

23115 E300-4.4.pdf

394.7 KB

PDF

23115 E350-1.4.pdf

323.3 KB

PDF

23115 E350-2.4.pdf

417.4 KB

PDF

23115 E350-3.4.pdf

365.9 KB

PDF

23115 E350-4.4.pdf

270.6 KB

PDF

23115 Elec Pricing Schedule.pdf

947.2 KB

PDF

23115 Fire Alarm & Emergency Lighting Spec.pdf

1.2 MB

PDF

Contents.pdf

155.3 KB

PDF

CSA Design Risk Assessment.pdf

159.4 KB

PDF

M&E Design Risk Assessment.pdf

463.5 KB

PDF

Vol A1 - Project Particulars.pdf

317.5 KB

PDF

Vol A2 - Engineering Specifications.pdf

473.6 KB

PDF

Vol A3 - Sample Photographs.pdf

1.5 MB

PDF

Vol B - Form of TenderFTS-6-v1.6-19-07-2023.pdf

266.9 KB

PDF

Volume C - Pricing Document.pdf

489.2 KB

Original notice text

This tender involves fire safety emergency works at Loreto College Secondary School, focusing on compliance with safety specifications and quality standards.

AI analysis updated 4 months, 1 week ago

Bid ↗
Details

Deadline

05 Sep

View on eTenders ↗

Location

Fire Safety Emergency Works at Loreto College, Garbour Street, Mullingar, Co. Westmeath

Procedure

Open

Clarification

22 Aug 2025

eTenders ID

6221625

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender