Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / SCC2025/0112 Topographic and Hydrographic Survey Pt.2 - N17 Knock to Collooney Project
Awarded Environmental & Ecology Services Framework Restricted

SCC2025/0112 Topographic and Hydrographic Survey Pt.2 - N17 Knock to Collooney Project

Deadline

05 Sep

Topographic and hydrographic survey for the N17 Knock to Collooney project.

SME fit: High Bid effort: Medium 📍 Sligo

Topographic and hydrographic survey for the N17 Knock to Collooney project.

Bidder profile

Ideal for firms experienced in environmental surveys with a strong compliance record in public procurement.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Sligo County Council
Title SCC2025/0112 Topographic and Hydrographic Survey Pt.2 - N17 Knock to Collooney [Atlantic Economic Corridor] Project
CPV / category services / Environmental & Ecology
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Along the preferred transport corridor for the N17 Knock to Collooney [Atlantic
Contract length not stated
Submission deadline 2025-09-05T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for SCC2025/0112 Topographic and Hydrographic Survey Pt.2 - N17 Knock to Collooney [Atlantic Economic Corridor] Project. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Environmental & Ecology under buyer workflows in Sligo County Council.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1m11 € 1.5m12 Maximum level of excess in any one c; 1) 14 Minimum level of Public Liability Insurance required in respect of any one accident: € 650000013 Maximum level of excess for property only* for any one incident below which the Service Provider will bear the cost: € 10,000 * No excess is permitted in respect of d; 1) 15 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,00014 Where the Tenderer is a consortium, the

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — Turnover to include other areas of business Turnover: Turnover: Topographical Survey Not Applicable €500,000
  • Insurance
  • Public Liability — €650000013M
  • Employer's Liability — €13,000,00014
  • Professional Indemnity — €1m
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1m11 € 1.5m12 Maximum level of excess in any one c; 1) 14 Minimum level of Public Liability Insurance required in respect of any one accident: € 650000013 Maximum level of excess for property only* for any one incident below which the Service Provider will bear the cost: € 10,000 * No excess is permitted in respect of d; 1) 15 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,00014 Where the Tenderer is a consortium, the

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2025-09-05T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): Topo Extents-PT.2-Fig 2.pdf, Appendix-B1-QC1-and-QC2-09-02-2022.docx
  • eTenders CFT ID: not stated
  • Clarification contact / portal: [email protected]
  • Priority attachments: Topo Extents-PT.2-Fig 2.pdf, Appendix-B1-QC1-and-QC2-09-02-2022.docx, MF-2.8-09-02-2022.docx

This tender has been awarded

Can you bid?

Minimum turnover

€500,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,000,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (27)

PDF

QC2-Part-1-v3.1-04-11-2024 (Rev.1).pdf

665.5 KB · Form / Declaration / Certificate

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1.docx

40.7 KB

DOCX

Appendix-B1-QC1-and-QC2-09-02-2022.docx

16.6 KB

DOCX

Appendix-B3-QC1-and-QC2-09-02-2022.docx

16.7 KB

PDF

FTS9-v1.10-16-09-2024.pdf

458.8 KB

PDF

Invitation_to_Tender.pdf

97.2 KB

PDF

ITT-S2b-v2.0-04-11-2024E.pdf

545.7 KB

DOCX

MF-2.7-09-02-2022.docx

28.6 KB

DOCX

MF-2.8-09-02-2022.docx

22.3 KB

DOCX

MF_2.4.docx

21.5 KB

PDF

MGS58874 Controls Survey Report - Rev2.pdf

1.4 MB

PDF

N17KC_P3_SRDO_Z1_REP_PRIC_TOPO_Z4_PUB_P5_5.1.pdf

397.9 KB

PDF

N17KC_P3_SRDO_Z1_REP_SPEC_TOPO-2_Z4_PUB_P5_5.1.pdf

1.1 MB

PDF

Preliminary Health and Safety Plan.pdf

217.9 KB

DOCX

QC-Part-2-v1.1-04-11-2024.docx

59.4 KB

DOCX

QC2-Part-1-v3.1-04-11-2024.docx

145.3 KB

PDF

SUR-SVW-0001-05.pdf

1.2 MB

PDF

SUR-SVW-0002-09b.pdf

430.1 KB

ZIP

Topo Extents - Pt 2.zip

46.1 KB

PDF

Topo Extents-PT.2-Fig 0.pdf

5.9 MB

PDF

Topo Extents-PT.2-Fig 1.pdf

807.8 KB

PDF

Topo Extents-PT.2-Fig 2.pdf

792.0 KB

PDF

Topo Extents-PT.2-Fig 3.pdf

806.5 KB

PDF

Topo Extents-PT.2-Fig 4.pdf

664.8 KB

PDF

Topo Extents-PT.2-Fig 5.pdf

728.0 KB

PDF

Topo Extents-PT.2-Fig 6.pdf

884.6 KB

PDF

Topo Extents-PT.2-Fig 7.pdf

895.2 KB

Original notice text

This tender involves conducting topographic and hydrographic surveys along the N17 transport corridor as part of the Atlantic Economic Corridor project, ensuring compliance with public procurement standards.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

05 Sep

View on eTenders ↗

Location

Along the preferred transport corridor for the N17 Knock to Collooney project.

Procedure

Restricted

Clarification

27 Aug 2025

eTenders ID

6200731

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender