← Tenders / Energy Improvements - Window replacement works to the Nurses Administration Building
Awarded Building Services & Maintenance Services SME Suitable Framework

Energy Improvements - Window replacement works to the Nurses Administration Building

Deadline

22 Aug

Window replacement works for energy improvements at the Nurses Administration Building

SME fit: Medium Bid effort: Medium 📍 Dublin

Window replacement works for energy improvements at the Nurses Administration Building

Bidder profile

Firms with experience in public sector window replacement projects and energy efficiency improvements.

Risks & flags

  • Undisclosed contract value
  • Ambiguity in eligibility criteria
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer National Orthopaedic Hospital Cappagh
Title Energy Improvements - Window replacement works to the Nurses Administration Building
CPV / category services
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length not stated
Submission deadline 2025-08-22T14:00:00+00:00
Go-live / start not stated

2. Scope of Work

National Orthopaedic Hospital Cappagh ran this procurement for “Energy Improvements - Window replacement works to the Nurses Administration Building” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • [Appendix D - supporting Info.zip] [ZIP containing 6 files]
    1. Payment for the Project Supervisor’s service is provided for under the Contract. Accordingly, the Client is not liable under this Agreement for the Project Supervisor’s fees or expenses.
  • All locking systems to have architects final approval.
  • double glazed low 'e' argon filled units, Proprietary Glazing system to be thermally
  • broken system - general, pressure equalized, drained and ventilated;
  • Wind loads to be calculated by the System Fabricator in accordance with site and
  • Window manufacturer / installer to supply cavity supports to all windows.
  • Sika Trocal Type SGK 1.5mm waterproofing membrane roofing system or similar

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • \n\nAllow for the removal of existing timber frame window, make good to existing window reveals
  • SITE PHOTOGRAPHS OF THE EXISTING SLIDING
  • [2504 TEN 506 - Replacement Windows - Sheet 3.pdf] to existing
  • replacement of existing structure at

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance — not specified for this tender
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — not specified in extract.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • [Appendix B - Forms of Tender and Schedule.zip] Content from the zip file /var/folders/j7/ntc0q6551nj30444rfp25mzw0000gn/T/tmp2o63th0_.zip:
  • [Appendix B - Forms of Tender and Schedule.zip] None
  • [Appendix D - supporting Info.zip] [ZIP containing 6 files]
    1. This Agreement is governed by and construed according to Irish law. The parties submit to the jurisdiction of the Irish courts in relation to all matters concerning it.
  • [2504 TEN 503 - Nursing Admin- OPD - Elevations.pdf] Level _1 OPD

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-08-22T14:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-08-22T14:00:00+00:00
Date surfaced in documents Act 2005
Date surfaced in documents Regulations 2013
Date surfaced in documents Standard 7413

8. Contract terms that matter

Contract duration in the extract: not stated. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
  • it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
  • the same terms as the insurances the Contractor is required to have under clause 10
  • [Appendix B - Forms of Tender and Schedule.zip] Content from the zip file /var/folders/j7/ntc0q6551nj30444rfp25mzw0000gn/T/tmp2o63th0_.zip:
  • [Appendix B - Forms of Tender and Schedule.zip] None
  • [Appendix D - supporting Info.zip] [ZIP containing 6 files]
  • Whose principal office is at Finglas, Dublin 11, D11 EV29

9. Risks, red flags & unusuals

  • Numeric qualification gates were only partially visible, so eligibility certainty required full pack review.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — specialist operator with compliant procurement governance and evidencable experience.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Project Supervisor-1.22-28-04-2025.docx, 2504 TEN 503 - Nursing Admin- OPD - Elevations.pdf, 2504 TEN 502 - Nursing Admin- OPD - Level 2 & 3.pdf.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: 2504 TEN 505 - Replacement Windows - Sheet 2.pdf, 2504 TEN 500 - Site Layout Plan - Phase 5 Window replacement.pdf, 2504 TEN 506 - Replacement Windows - Sheet 3.pdf.

This tender has been awarded

Can you bid?

Required certifications

  • BS 4873

Lots (1)

Lot 1: Project Supervisor Appointment

Appointment of a Project Supervisor to oversee compliance with Construction Regulations.

Documents (12)

XLSX

2025-07-29 Pricing document - Nurses Admin Rev A.xlsx

25.9 KB · Pricing / BOQ / Schedule of Rates

DOCX

Project Supervisor-1.22-28-04-2025.docx

37.7 KB · Contract / Agreement / Terms

DOCX

A2-PW-CF6_Rates_of_Pay_and_Conditions_of_Employment_Certificate.docx

23.3 KB · Form / Declaration / Certificate

PDF

2504 TEN 500 - Site Layout Plan - Phase 5 Window replacement.pdf

1.5 MB

PDF

2504 TEN 501 - Nursing Admin- OPD - Level 0 & 1.pdf

623.6 KB

PDF

2504 TEN 502 - Nursing Admin- OPD - Level 2 & 3.pdf

305.7 KB

PDF

2504 TEN 503 - Nursing Admin- OPD - Elevations.pdf

290.7 KB

PDF

2504 TEN 504 - Replacement Windows - Sheet 1.pdf

419.1 KB

PDF

2504 TEN 505 - Replacement Windows - Sheet 2.pdf

473.5 KB

PDF

2504 TEN 506 - Replacement Windows - Sheet 3.pdf

226.0 KB

ZIP

Appendix B - Forms of Tender and Schedule.zip

1.0 MB · Appendix / Annex

DOCX

Proffessional Indemity Insurnace Cert.docx

36.8 KB · Insurance / Indemnity

Original notice text

This tender involves window replacement works aimed at improving energy efficiency in the Nurses Administration Building at the National Orthopaedic Hospital Cappagh.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

22 Aug

View on eTenders ↗

Location

Ireland

Clarification

11 Aug 2025

eTenders ID

6210068

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender