Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Respond Nationwide Gas Boiler Services Maintenance Framework
Closed Building Services & Maintenance Works SME Suitable Framework Open

Respond Nationwide Gas Boiler Services Maintenance Framework

Deadline

11 Aug

Framework for nationwide gas boiler services maintenance by Respond Ireland.

SME fit: Medium Bid effort: Medium 📍 Ireland

Framework for nationwide gas boiler services maintenance by Respond Ireland.

Bidder profile

Mid-sized to large firms with experience in public sector maintenance contracts and established compliance processes.

Risks & flags

  • Undisclosed contract value
  • Qualification gate turnover requirement
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Respond Ireland
Title Respond Nationwide Gas Boiler Services Maintenance Framework
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 2 months
Submission deadline 2025-08-11T16:00:00+00:00
Go-live / start not stated

2. Scope of Work

Respond Ireland ran this procurement for “Respond Nationwide Gas Boiler Services Maintenance Framework” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Title: Respond Nationwide Gas Boiler Services Maintenance Framework
  • Sector: Building Services & Maintenance
  • Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Maintenance[15] € 500,000.00 *CA Note: if stating a minimum yearly
  • 1 18-11-2024 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: General Construction/Maintenance15 € 500,000.00 CA Note: if stating a minimum yearly tur
  • General Construction/Maintenance[15] € 500,000.00
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • All appliances will be serviced within 12 months of their last annual
  • [W25036 Vol C Gas Boiler Servicing and Maintenance PD.pdf] July 2025
  • Gas Boiler Servicing and Maintenance
  • GAS BOILER SERVICING AND MAINTENANCE
  • in relation to Respond Procurement Services Contract.
  • RESPOND PROCUREMENT SERVICES CONTRACT Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Contractor’s risk of loss and damage to the Works and Employer’s existing facility

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € N/A[17] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m); * The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided * The excess as stat
  • Certifications — not specified for this tender
  • Past experience — * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € N/A[17] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m); The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € N/A17 CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Maintenance[15] € 500,000.00 *CA Note: if stating a minimum yearly
    • The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € N/A[17] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
    • The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided * The excess as stat
  • ed here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000.00[19] Maximum level o

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
  • The excess as stated here: Maximum permissible excess on Profess 2% not stated not stated ed here: Maximum permissible excess on Professional Indemnity Insu 2% not stated not stated | 1 18-11-2024 Maximum permissible excess on Professional Indemnity Insurance in a | 2% | not stated | not stated | | e in any one claim below which the will bear the cost is the greater amount of 2 | 2% | not stated | not stated | The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • If the estimated cost exceeds €500, the contractor must submit the details to
  • This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a Certifi
  • and the number and type of submittals provided as requested
  • This project number must correspond to the project number given in Appendix B1
  • [W25036 Vol C Gas Boiler Servicing and Maintenance PD.pdf] July 2025

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-08-11T16:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-08-11T16:00:00+00:00
Date surfaced in documents 23 June 2022
Date surfaced in documents 24 October 2008
Date surfaced in documents 22 July 2003

8. Contract terms that matter

Contract duration in the extract: 2 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the construction stage for the Projects, unless the appointment is terminated earlier
  • ensure that it is insured by insurances in the same terms as the insurances it is required to have under the Contract, and that those insurances comply with all the requirements of the Contract, and are kept in force for the same period as required by the Contract, and include cover for death or i
  • conclusion of a Framework Agreement with a Framework Member does not guarantee the awarding
  • 1031 – the IPI - apply to this Competition 23 June 2022 - the International Procurement Instrument to the Competition (“the IPI”)
  • Within 14 days after receiving the payment claim notic
  • (b) expiry of at least 21 days written notice to terminate this Tender
  • 6 Time for payment 30 days[15] after Employer rece

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: W25036 Vol C Gas Boiler Servicing and Maintenance PD.pdf, Appendix-A-Self-Declaration Reg 57.docx, [

[Appendix-A-Self-Declaration Reg 57.docx.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Click here and

[Appendix-A-Self-Declaration Reg 57.docx, Click here and insert

[Appendix-A-Self-Declaration Reg 57.docx, PW-CF11-v1.6-29-07-2021.pdf.

Can you bid?

Minimum turnover

€500,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Documents (20)

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

45.6 KB

DOCX

Appendix-A-Self-Declaration Reg 57.docx

41.2 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

34.7 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

29.4 KB

DOCX

Appendix-B3-Cert Satisfactory-Delivery.docx

29.0 KB

DOCX

Appendix-C-Bankers-Letter.docx

33.3 KB

DOCX

FTS12-v1.4-30-06-2016.docx

51.6 KB

PDF

ITTW-7.pdf

648.1 KB

PDF

ITTW-7_Invitation_to_Tender.pdf

67.5 KB

DOCX

MF-1.27-09-04-2020.docx

36.5 KB

DOCX

MF-1.28-09-04-2020.docx

52.3 KB

PDF

Project Brief.pdf

1003.5 KB

DOCX

PW-CF11-MF-Task-Order.docx

27.6 KB

PDF

PW-CF11-v1.6-29-07-2021.pdf

383.5 KB

PDF

QW-Part-1.pdf

1.4 MB

DOCX

QW-Part-2-v1.1-18-11-2024E.docx

65.5 KB

DOCX

QW2-Part-1-v2.1-18-11-2024-09-01-2025.docx

202.2 KB

PDF

Volume E - Qualitative Criteria.pdf

660.1 KB

PDF

W25036 Vol A Gas Boiler Servicing and Maintenance.pdf

1.8 MB

PDF

W25036 Vol C Gas Boiler Servicing and Maintenance PD.pdf

863.4 KB

Original notice text

This tender involves the establishment of a maintenance framework for gas boiler services across Ireland, focusing on operational contract execution and compliance with reporting obligations.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

11 Aug

View on eTenders ↗

Location

Services will be provided nationwide across Ireland.

Procedure

Open

Clarification

01 Aug 2025

eTenders ID

6055363

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender