Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / MCC Ballinrobe Housing Bundle
Awarded Building Services & Maintenance Works Open

MCC Ballinrobe Housing Bundle

Deadline

11 Aug

Mayo County Council housing bundle project requiring building and service execution.

SME fit: Medium Bid effort: Medium 📍 Mayo

Mayo County Council housing bundle project requiring building and service execution.

Bidder profile

Mid-sized to large firms with public sector experience and compliance capabilities.

Risks & flags

  • Qualification gate for turnover
  • Undisclosed contract value
  • Two-step tender process
  • Technical granularity dependent on ITT

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Mayo County Council_1127
Title MCC Ballinrobe Housing Bundle
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 15 months
Submission deadline 2025-08-11T16:00:00+00:00
Go-live / start not stated

2. Scope of Work

Mayo County Council_1127 ran this procurement for “MCC Ballinrobe Housing Bundle” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Sector: Building Services & Maintenance
  • HAVE A WATER SUPPLY CAPABLE OF DELIVERING A MINIMUM OF 8 l/s
  • SUPPLY CAPABLE OF DELIVERING A MINIMUM OF 8 l/s
  • HAVE A WATER SUPPLY CAPABLE OF DELIVERING A MINIMUM OF 20
  • A sanitary pipework system shall be installed to contain the minimum amount of pipework
  • power supply system shall be provided in accordance with IS EN 62305-1, IEC 61643-12 and IEC 60364-5-53
  • power supply system shall be provided in accordance with IS EN 62305, IEC 61643-12 and IEC 60364-5-53
  • (r) IS/EN 50171 “Central Power Supply Systems”
  • ELECTRICAL SERVICES’ INSTALLATION June 2025
  • ELECTRICAL SERVICES INSTALLATION June 2025
  • MECHANICAL SERVICES’ INSTALLATION June 2025
  • 123C Supply and fit 3 channel 7 day heating programmer 3 Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • properly vibrated and taken up to the underside of existing foundation, allow a minimum of 2 days for curing, no bays will be excavated until adjacent bays are cured, pouring sequence as per the Engineers drawing nr 10001 NaN NaN NaN NaN
  • will be in accordance with IS EN 50131-1:2006 & Garda document: An Garda Siochana Policy
  • WITHIN 50mm OF UNDERSIDE OF EXISTING WALL OR FOUNDATION
  • ght under existing foundations; minimum curing period to be 2 days

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 0 10D The Client require that the minimum limit of Public Liability Indemnity should be €6,500,000.00 in relation to all contracts built for t; 0 10E The Client require that the minimum limit of Employers Liability Insurance should be €13,000,000.00 1
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • 0 10D The Client require that the minimum limit of Public Liability Indemnity should be €6,500,000.00 in relation to all contracts built for t
  • 0 10E The Client require that the minimum limit of Employers Liability Insurance should be €13,000,000.00 1
  • 0 10F Liability Insurance on which the Employer is required to 10E The Client require that the minimum limit of Employers Liability Insurance should be €13,000,000.00 1

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • [24061-ZZ-CHH-S3-ZZ-DR-CE-SW-76001.00.pdf] 300
  • [24061-ZZ-CHH-S3-ZZ-DR-CE-SW-76001.00.pdf] INTS TO BE FILLED
  • [24061-ZZ-CHH-S3-ZZ-DR-CE-SW-76001.00.pdf] ERS
  • [24061-ZZ-CHH-S3-ZZ-DR-CE-SW-76001.00.pdf] ASTEWATER WORKS.
  • [24061-ZZ-CHH-S3-ZZ-DR-CE-SW-76001.00.pdf] ILE IRON GRATINGS TO I.S.261 GRADE A. OUTLETS TO BE

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-08-11T16:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-08-11T16:00:00+00:00
Date surfaced in documents 1 September 2020
Date surfaced in documents June 2025
Date surfaced in documents September 2020

8. Contract terms that matter

Contract duration in the extract: 15 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • PIPES SHALL HAVE A MINIMUM PRESSURE CLASSIFICATION
  • Equipment must be supplied from companies that meet the following Minimum Requirements:
  • A sanitary pipework system shall be installed to contain the minimum amount of pipework
  • accumulate on floor, extend to 40mm Sleeves shall be a minimum of two pipe sizes larger
  • Pipes shall have a minimum depth of cover of 900 mm measured from the top of the pipe to
  • MCBs shall be to ISEN 60898 with Instantaneous Trip Current of 10 x IN, with B tripping
  • re parts Lists for all equipment with Contractor’s order number and manufacturers

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: M2072_56_009_(T).pdf, 24061-ZZ-CHH-S3-ZZ-DR-CE-SW-76001.00.pdf, 24062-ZZ-CHH-S3-ZZ-DR-CE-DP-70001.00.pdf.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: M2072_Electrical Specification & Schedule - Main Street (T1).pdf, M2072_61_005_(T).pdf, Schedule - Main Street (T1).pdf] HOUSING SCHEME.

This tender has been awarded

Can you bid?

Required certifications

  • EN 1090
  • EN 12620
  • EN 13139
  • EN 13242
  • EN 14081

Public liability insurance

€6,500,000

Named standards / methodologies

IS EN 50131-1:2006IS EN 62305IEC 61643-12IEC 60364-5-53

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Housing Developments in Ballinrobe

Construction and renovation of 14 housing units across four sites in Ballinrobe, Co. Mayo.

Documents (48)

ZIP

Castlebar Road.zip

683.6 KB · Pricing / BOQ / Schedule of Rates

ZIP

Convent Road.zip

604.9 KB · Pricing / BOQ / Schedule of Rates

ZIP

Creagh Road.zip

491.3 KB · Pricing / BOQ / Schedule of Rates

ZIP

Main Street.zip

493.0 KB · Pricing / BOQ / Schedule of Rates

PDF

24061-ZZ-CHH-S3-ZZ-DR-CE-SW-76001.00.pdf

307.5 KB

PDF

24062-CHH 'BIM' Issue Sheet.pdf

724.9 KB

PDF

24062-ZZ-CHH-S3-FL01-DR-SE-FD-10000.00.pdf

195.5 KB

PDF

24062-ZZ-CHH-S3-FL01-DR-SE-FD-10001.00.pdf

355.7 KB

PDF

24062-ZZ-CHH-S3-L00-DR-SE-SP-20001.00.pdf

266.6 KB

PDF

24062-ZZ-CHH-S3-L01-DR-SE-SP-20101.00.pdf

337.0 KB

PDF

24062-ZZ-CHH-S3-L02-DR-SE-SP-20201.00.pdf

369.6 KB

PDF

24062-ZZ-CHH-S3-R01-DR-SE-RP-30001.00.pdf

277.8 KB

PDF

24062-ZZ-CHH-S3-R01-DR-SE-RP-30002.00.pdf

161.1 KB

PDF

24062-ZZ-CHH-S3-ZZ-DR-CE-CD-72000.00.pdf

666.8 KB

PDF

24062-ZZ-CHH-S3-ZZ-DR-CE-CD-72001.00.pdf

1.9 MB

PDF

24062-ZZ-CHH-S3-ZZ-DR-CE-DP-70000.00.pdf

535.2 KB

PDF

24062-ZZ-CHH-S3-ZZ-DR-CE-DP-70001.00.pdf

613.3 KB

PDF

24062-ZZ-CHH-S3-ZZ-DR-CE-SW-76000.00.pdf

355.1 KB

PDF

24062-ZZ-CHH-S3-ZZ-DR-SE-GS-40001.00.pdf

194.6 KB

PDF

24062-ZZ-CHH-S3-ZZ-DR-SE-GS-40002.00.pdf

219.9 KB

PDF

24062-ZZ-CHH-S3-ZZ-DR-SE-GS-40003.00.pdf

233.6 KB

PDF

M2072 - Mechanical Document Transmittal Sheet 17-06-25.pdf

178.4 KB

PDF

M2072-Mechanical Specification (T) Main Street.pdf

2.7 MB

PDF

M2072_52_008_(T).pdf

718.0 KB

PDF

M2072_52_009_(T).pdf

710.4 KB

PDF

M2072_52_010_(T).pdf

709.7 KB

PDF

M2072_53_008_(T).pdf

732.6 KB

PDF

M2072_53_009_(T).pdf

735.0 KB

PDF

M2072_53_010_(T).pdf

736.2 KB

PDF

M2072_56_008_(T).pdf

729.6 KB

PDF

M2072_56_009_(T).pdf

719.9 KB

PDF

M2072_56_010_(T).pdf

720.6 KB

PDF

M2072_57_008_(T).pdf

691.4 KB

PDF

M2072_57_009_(T).pdf

684.4 KB

PDF

M2072_57_010_(T).pdf

692.8 KB

PDF

M2072_60_007_(T).pdf

855.0 KB

PDF

M2072_60_008_(T1).pdf

811.6 KB

PDF

M2072_62_008_(T1).pdf

474.0 KB

PDF

M2072_62_009_(T).pdf

672.8 KB

PDF

M2072_62_010_(T).pdf

703.3 KB

PDF

M2072_63_003_(T1).pdf

421.2 KB

PDF

M2072_63_009_(T1).pdf

463.7 KB

PDF

M2072_63_010_(T1).pdf

464.8 KB

PDF

M2072_68_008_(T1).pdf

504.1 KB

PDF

M2072_68_009_(T).pdf

652.4 KB

PDF

M2072_68_010_(T).pdf

648.6 KB

PDF

M2072_Electrical Document Transmittal Sheet 25-06.25.pdf

227.2 KB

PDF

M2072_Electrical Specification & Schedule - Main Street (T1).pdf

2.6 MB

Original notice text

This tender involves the construction and operational management of the MCC Ballinrobe Housing Bundle, focusing on building services, water supply, and electrical installations over a 15-month period.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

11 Aug

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

25 Jul 2025

eTenders ID

6021437

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender