← Tenders / Extension and Alterations to St Brendan's National School Rathcoole Mallow Co Cork P51A038
Closed Construction & Civil Engineering Works Open

Extension and Alterations to St Brendan's National School Rathcoole Mallow Co Cork P51A038

Deadline

18 Aug

Extension and alterations project for St. Brendan's National School in Rathcoole, Co. Cork.

SME fit: Medium Bid effort: Medium 📍 Cork

Extension and alterations project for St. Brendan's National School in Rathcoole, Co. Cork.

Bidder profile

Mid-sized to large firms with public sector tender experience and operational capability in construction.

Risks & flags

  • Undisclosed contract value
  • Qualification gate narrowing bidder pool
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer St. Brendan's National School (Rathcoole)
Title Extension and Alterations to St Brendan's National School Rathcoole Mallow Co Cork P51A038
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 18 months
Submission deadline 2025-08-18T16:00:00+00:00
Go-live / start not stated

2. Scope of Work

St. Brendan's National School (Rathcoole) ran this procurement for “Extension and Alterations to St Brendan's National School Rathcoole Mallow Co Cork P51A038” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, but this limit may be on an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.
  • Persons under a contract of service or apprenticeship with the insured
  • Persons under a contract of service or apprenticeship with the insured.
  • Effecting or maintenance of insurance of or in connection with the provision of finance or advice on financial matters
  • See Ancillary Certificate requirements Emergency lighting System — Certificate of Installation
  • Granted Fire Safety Certificate Emergency Lighting System — Commissioning Certificate
  • [FTS-5-v2.7-09-01-2025.docx] Emergency lighting System — Certificate of Installation
  • Cs - Ancillary Certificate of Compliance on Completion: Fire seals/fire stopping/ intumescent paint/ fire doors, alarms, suppression systems, lifts etc
  • Fire Detection and Alarm System — Certificate of Installation
  • Fire Detection and Alarm System — Commissioning Certificate
  • Utilities means conducting media and apparatus for water, sewage, electricity, gas, oil, telecommunications, data, steam, air, or other services, and associated apparatus and structures. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Property of the insured or in the insured’s custody or control other than existing premises and their contents temporarily occupied for the purposes of the Works
  • [FTS-5-v2.7-09-01-2025.docx] insured’s custody or control other than existing premises and their contents temporarily occupied for the purposes of the Works
  • *K Delay Events, Compensation Events, Programme
  • K Delay Events, Compensation Events, Programme Contingency, Delay Costs, Adjustments(Sub-clauses 9.3, 9.4, 10.1, 10.6, 10.7)

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu
  • Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event
  • Maximum excess for Public liability: €10,000~~[10]~~ in respect of p
  • 5% of the Contract Sum Minimum indemnity for Public liability and Employers' liability insurance: Public Liability Insurance: '€6,500,000.00' for any one event, but this limit may
  • Employers' Liability Insurance: '€13,000,000.00' for any one event

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
The Contractor’s tendered percentage addition to costs of labour *(If negative 35% not stated not stated
The Contractor’s tendered percentage addition to costs of labour *(If negative 35% not stated not stated
The Contractor’s tendered percentage addition to costs of materials *(If negat 0% not stated not stated
The Contractor’s tendered percentage addition/deduction to costs of plant *(A 50% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
  • We have examined and understand the Public Works Contract for Minor Building and Civil Engineering Works Designed by the Employer, the Works Requirements, the Pricing Document, all as amended by any supplemental information, for the above contract.
  • We submit with this Tender the completed Pricing Document and Schedule which form part of this Tender. .
  • [CA Note: Please choose from the options in the drop down menus below] A Bill of Quantities measured in accordance with the: as included in Volume C. [Where Agreed Rules of Measurement 4 is selected from the drop down menu above it shall be as amended by Supplement 1, Issue 2. Where Civil Engineering Standard Method of Measurement 4: Revised is selected from the drop down menu above it shall be the 4TH Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5.3 of the Capital Works Management Framework. Where the TII’s Requirements for Measuring and Pricing (RMP) is selected from the drop down menu above, it shall be the latest edition as published by Transport Infrastructure Ireland] [CA Note: Please choose from the options in the drop down menu below for Mechanical & Electrical Works] Mechanical & Electrical Works measured in accordance with: *[Where Civil Engineering Standard Method of Measurement 4:Revised is selected from the drop down
  • [FTS-5-v2.7-09-01-2025.docx] edition as published by Transport Infrastructure Ireland]* [CA Note: Please choose from the options in the drop down menu below for Mechanical & Electrical Works] Mechanical & Electrical Works measured in accordance with: [Where Civil Engineering Standard Method of Measurement 4:Revised is selected from the drop down menu above it shall be the 4th Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5.3 of the Capital Works Management Framework. Where TII’s Requirements for Measuring and Pricing (RMP) is selected from the drop down menu above, it shall be the latest edition as published by Transport Infrastructure Ireland]

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-08-18T16:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-08-18T16:00:00+00:00
Date surfaced in documents 01 February 2019
Date surfaced in documents 09 January 2025
Date surfaced in documents 2 June 2019

8. Contract terms that matter

Contract duration in the extract: 18 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • Title: Extension and Alterations to St Brendan's National School Rathcoole Mallow Co Cork P51A038
  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
  • Minimum amount for interim payments, except release of retention, € 10,000.00 [14]
  • Minimum amount for interim payments, except release of retention, € 10,000
  • Minimum amount for interim payments, except release of retention,
  • Minimum amount for interim payments, except release of retention, €
  • J (a) A daily record of the number and description of tradesmen and labour employed on the

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: FTS-5-v2.7-09-01-2025.docx, Where Civil Engineering Standard Method of Measurement 4:Revised is selected from the drop down

[FTS-5-v2.7-09-01-2025.docx, ITT-W2-v3.0-18-11-24-23-01-25.docx.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: Schedule for Public Works Contract for Building Works Designed by the Employer, Schedule which form part of this Tender. ., scheduled and included in Volume A and Volume C (Preliminaries Only) ,* .

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Comparative Cost

Suitability Assessment

Lots (1)

Lot 1: Public Works Contract for Minor Building and Civil Engineering Works

Execution of minor building and civil engineering works as per the employer's design.

Documents (8)

DOCX

FTS-5-v2.7-09-01-2025.docx

94.9 KB · RFT / Invitation to Tender

DOCX

ITT-W2-v3.0-18-11-24-23-01-25.docx

69.9 KB · RFT / Invitation to Tender

PDF

19011-Vol A - Architectural Preliminaries 1.pdf

331.7 KB · Pricing / BOQ / Schedule of Rates

PDF

Vol A - BQ Preliminaries 2.pdf

224.7 KB · Pricing / BOQ / Schedule of Rates

ZIP

A.4.1 Architectural Drawings and Schedules.zip

2.0 MB · Drawing / Plan / Layout

ZIP

A.4.2 Civil Structural Drawings and Schedules.zip

16.6 KB · Drawing / Plan / Layout

ZIP

A.4.3 Mechanical and Electrical Drawings and Schedules.zip

11.2 KB · Drawing / Plan / Layout

ZIP

Tender Pack (1).zip

342.4 KB · Drawing / Plan / Layout

Original notice text

This tender involves the extension and alterations to St. Brendan's National School in Rathcoole, Co. Cork, focusing on building and integrating specified services with compliance reporting.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

18 Aug

View on eTenders ↗

Location

St. Brendan's National School, Rathcoole, Mallow, Co. Cork, Ireland.

Procedure

Open

Clarification

16 Jul 2025

eTenders ID

5976256

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender