Offshore Engineering Design Services for MaREI at University College Cork
Value
€350k
Deadline
13 Aug
13 Aug 2025
Value
€350k
Deadline
13 Aug
Offshore engineering design services for MaREI at University College Cork over 55 months
Offshore engineering design services for MaREI at University College Cork over 55 months
Bidder profile
Mid-sized to large firms with public-sector tender experience and operational capability in offshore engineering.
Risks & flags
- Qualification gate for turnover
- Two-step process may limit bidders
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | University College Cork |
| Title | Offshore Engineering Design Services for MaREI at University College Cork. |
| CPV / category | services |
| Estimated value | 350000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 55 months |
| Submission deadline | 2025-08-13T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
University College Cork ran this procurement for “Offshore Engineering Design Services for MaREI at University College Cork.” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: Offshore Engineering Design Services for MaREI at University College Cork.
- (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[11] € 1,500,000[12] Maximum level o
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[13] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec
- 0% of gross fee turnover, or €5,000 whichever is greater From start to completion of the Services; and six years
- of gross fee turnover, or €5,000 whichever is greater From start to completion of the Services; and six years
- eath, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Services
- Employers’ Liability for death, injury, to employees € 13,000,000 None From start to completion of the Services
- dy (INAB) or United Kingdom Accreditation Service (UKAS) to ISO 17025 (EN
- contract being executed by and on behalf of UCC; procuring the services by alternative
- spread of community, education, health service, industry, arts and heritage
- enabling platform for economic development. With aggregate research spend of over
- experience in conducting fundamental and applied research supported by competitively Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- partners and has research funding of approximately €60m
- Background to the FLOWT EOB Project
- [250627 Design and Consent FLOWT-EOB Tender Memo V.4.pdf] Project Objectives
- offers programmes across all disciplines and professions including the arts, humanities,
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Public Liability for death, personal injury [except EL of gross fee turnover, or €5,000 whichever is greater From start to com; Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Se
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Public Liability for death, personal injury [except EL of gross fee turnover, or €5,000 whichever is greater From start to com
- Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Se
- Employers’ Liability for death, injury, to employees € 13,000,000 None From start to completion of the
- (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[11] € 1,500,000[12] Maximum level o
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[13] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| At the end of this stage indicative costs (+/- 25%) to achieve the project will | 25% | not stated | not stated |
| overall cost of the project (+/- 10%) which will inform a decision by UCC on pro | 10% | not stated | not stated |
| Proposed Cost -30% | 30% | not stated | not stated |
| Criterion A1 -20% | 20% | not stated | not stated |
| Criterion A2- Project Specific Resource Matrix – 10% | 10% | not stated | not stated |
| Criterion B1 -20% | 20% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- 2 it was determined that the total value of all payments due under the contract (the Final Account) was €0.00 (excluding VAT) based upon the final statement submitted by the Contractor
- [250627 Design and Consent FLOWT-EOB Tender Memo V.4.pdf] TENDER
- [250627 Design and Consent FLOWT-EOB Tender Memo V.4.pdf] Project Objectives
- [250627 Design and Consent FLOWT-EOB Tender Memo V.4.pdf] .10 General
- this competition are the sole responsibility of the entity submitting a response (a
- [250627 Design and Consent FLOWT-EOB Tender Memo V.4.pdf] this Competition.
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2025-08-13T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2025-08-13T11:00:00+00:00 |
| Date surfaced in documents | November 2018 |
| Date surfaced in documents | July 2025 |
| Date surfaced in documents | October 2018 |
8. Contract terms that matter
Contract duration in the extract: 55 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Se
- (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[11] € 1,500,000[12] Maximum level o
- The Anticipated Final Account Sum is €0.00 [ ]
- 2 it was determined that the total value of all payments due under the contract (the Final Account) was €0.00 (excluding VAT) based upon the final statement submitted by the Contractor
- Both an amount or amounts of money less than €10 million in total and an extension of
- eath, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Services
- • The stripping of the cable sheath will be limited to the minimum amount required for a successful
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: 250627 Design and Consent FLOWT-EOB Tender Memo V.4.pdf, (B –
[250620 FTS9-v1.10-16-09-2024 Tender & Schedule.docx, RFT.
- eTenders CFT / notice reference: Contract Notice”) will be dispatched by.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ITT”) subject to compliance with all relevant pre, Schedule included with this, ITT and the evaluation against the quality criteria.
This tender has been awarded
- Gavin and Doherty Geosolutions · 28 Nov 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€500,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,250,000
Scoring
Most Economically Advantageous Tender
Proposed Cost
Team Qualifications and Experience
Design Approach and Understanding of Requirements
Lots (1)
Comprehensive design, planning, and consenting services for a floating offshore wind turbine platform.
Documents (55)
250627 Design and Consent FLOWT-EOB Tender Memo V.4.pdf
1.2 MB · RFT / Invitation to Tender
250620 Design & Consent FLOWT-EOB Tender Memo_v.3.pdf
681.9 KB
250620 Appendix-A.docx
34.8 KB
250620 Appendix-B1.docx
16.6 KB
250620 Appendix-B3-.docx
16.7 KB
250620 COE-1-v2.j-30-09-2024.docx
87.9 KB
250620 Document Register DT Tender.pdf
226.8 KB
250620 FTS9-v1.10-16-09-2024 Tender & Schedule.docx
193.4 KB
250620 ITT-S2b-v2.0-04-11-2024.docx
89.8 KB
250620 QC2-Part-1-v3.1-04-11-2024 SAQ.docx
146.4 KB
250620 QC2-Part-2-v3.1-04-11-2024 SAQ part2.docx
66.4 KB
250627 Resource Matrix Combined.xlsx
73.8 KB · Appendix / Annex
250702 Document Register DT Tender Rev 1.pdf
1.3 MB · Appendix / Annex
250702 Offshore Engineering TC 2.pdf
97.0 KB · Clarification / Addendum
250708 Offshore Engineering TC 3.pdf
113.4 KB · Clarification / Addendum
250708 Project Deliverables List_FLOWT-EOB_.pdf
98.1 KB · Appendix / Annex
250708 Resource Matrix Combined_Rev 1.xlsx
82.7 KB · Appendix / Annex
250718 Offshore Engineering TC 5.pdf
172.5 KB · Clarification / Addendum
250724 Offshore Engineering TC 6.pdf
137.1 KB · Clarification / Addendum
Arbitration-Rules-AR1-v1.3-14-10-2024.docx
481.8 KB
Arbitration-Rules-AR1-v1.3-14-10-2024.pdf
395.3 KB
CN Form Template.docx
76.6 KB
CN-Claims and Compensation Events Register.xls
273.0 KB
CPO Guidance on Permit To Work for Contractors.pdf
328.3 KB
CSA Maintenance Guidelines for New Projects.pdf
1.9 MB
Information-Note-GDPR-05-06-2019.pdf
265.7 KB
M&E Design Guidance - Appendix A Checklist.pdf
210.3 KB
ME Design Guidance.pdf
7.1 MB
MIni-SKA Template.xlsx
40.3 KB
OWC-042257-001-REP002-D-Site-Evaluation_plus appendices.pdf
6.8 MB
OWC-042257-004-REP001-B-Concept-design-evaluation.pdf
708.4 KB
Progress Report Template.xlsx
27.5 KB
Project Contact List Template.docx
67.6 KB
Safety Review Checklist - Finished Building Product.pdf
168.4 KB
SOP 06 MV Safe System of Work Rev B.pdf
1.4 MB
SOP 07 Electrical Safe System of Work Rev B.pdf
1.6 MB
SOP 08 Electrical Installations Rev B.pdf
349.8 KB
SOP 14 Mechanical Safe System of Work-Rev B.pdf
601.8 KB
SOP 18 Movement of Vehicles Rev A.pdf
6.5 MB
SOP 20 Asbestos Rev A.pdf
549.7 KB
Stage 1 Completion Certificate.docx
72.5 KB
Stage 2a Completion Certificate.docx
72.7 KB
Stage 2b Completion Certificate.docx
73.0 KB
Stage 3 Completion Certificate.docx
73.5 KB
Stage 4 Completion Certificate.docx
73.8 KB
Stage 5 Completion Certificate.docx
73.2 KB
UCC BEMS Specification.pdf
542.9 KB
UCC CCTV & ACCESS Project Specification.pdf
187.7 KB
UCC Guidelines for Designing for Autism.pdf
721.1 KB
UCC Index for Digital Project Manual (DPM).pdf
812.4 KB
UCC PTW Template.pdf
146.6 KB
UCC Signage Guide 2020.pdf
2.5 MB
UCC Structured Cabling Specification.pdf
269.8 KB
ucc_securing_our_future_strategic_plan_23_28.pdf
26.3 MB
~$1027 FTS9-v1.7-30-06-2016 (1).docx
162 bytes
Original notice text
Provision of offshore engineering design services for the MaREI project at University College Cork, focusing on building, integrating, and operating specified service stacks with compliance reporting.
AI analysis updated 4 months ago
Value
€350k
Deadline
13 Aug
Buyer
University College CorkLocation
Cork Harbour, with electricity supplied to the UCC Beaufort Building
Procedure
Open
Clarification
25 Jul 2025
eTenders ID
5956530
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender