← Tenders / North and South Facades with NB Labs upgrade works (Glazing Reserved Specialist List)
Closed Construction & Civil Engineering Works SME Suitable Open

North and South Facades with NB Labs upgrade works (Glazing Reserved Specialist List)

Value

€3.5m

Deadline

21 Jul

Upgrade works for North and South Facades at Dundalk Institute of Technology

SME fit: High Bid effort: Medium 📍 Louth

Upgrade works for North and South Facades at Dundalk Institute of Technology

Bidder profile

Mid-sized to large specialist firms with experience in glazing works and health and safety compliance.

Risks & flags

  • Turnover threshold
  • Health and safety compliance requirements
  • Two-step qualification process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Dundalk Institute of Technology_1155
Title North and South Facades with NB Labs upgrade works (Glazing Reserved Specialist List)
CPV / category works
Estimated value 3500000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 3 months
Submission deadline 2025-07-21T16:00:00+00:00
Go-live / start not stated

2. Scope of Work

Dundalk Institute of Technology_1155 ran this procurement for “North and South Facades with NB Labs upgrade works (Glazing Reserved Specialist List)” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • Provide a list of completed projects below for which select as appropriate: Works/Works and PSCS Services/Specialist Works/Specialist Works with Design Input were provided by the Applicant over the time period stated in the relevant Qualification Criterion stated above that are similar in nature and complexity to the Works required for this Competition.
  • The evidence required to pass this criterion is details of the relevant technicians or technical bodies upon whom the Applicant can call on in order to carry out the work or whom the Applicant can use in regards to quality control. Applicants must also provide evidence of a safety management system.
  • For Type 3 projects Applicants should supply names of any group, body and organisation that the Applicant is a member of and which promotes and has involvement in Health and Safety matters. It should also provide details of any external resource or expertise relevant to this project that are available to the Applicant's business.
  • Evidence in support of the declarations in Appendix 1 and any requirements set out above must be provided when requested by the Contracting Authority.In place of documentary evidence, Applicants may provide third party certification that their safety management system is in accordance with OHSAS 18001 or equivalent. Certified membership of Safe-T-Cert may be deemed equivalent for the purposes of this criterion.
  • [3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx] that their safety management system is in accordance with OHSAS 18001 or equivalent. Certified membership of Safe-T-Cert may be deemed equivalent for the purposes of this criterion. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

    • Health and Safety Policy and Organisation;
    • a copy of our current general health and safety policy; * a general Health and Safety policy document appropriate to a Health and Safety led Construction Management role;
  • [3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx] general health and safety policy; * a general Health and Safety policy document appropriate to a Health and Safety led Construction Management role;

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; N/A Area of Business/Work: Yearly Turnover arising from the area of work specified: Glazing Works Specialist category € 3,000,000 Minimum level of Professional Indemnity Insurance required for € 1,500,000 Maximum permissible excess on Profe; emnity Insurance required for € 1,500,000 Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Minimum level of Public Liability I
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • N/A Area of Business/Work: Yearly Turnover arising from the area of work specified: Glazing Works Specialist category € 3,000,000 Minimum level of Professional Indemnity Insurance required for € 1,500,000 Maximum permissible excess on Profe
  • emnity Insurance required for € 1,500,000 Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Minimum level of Public Liability I
  • 6,500,000 Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
emnity Insurance required for € 1,500,000 Maximum permissible excess on Pr 2% not stated not stated
claim below which the Contractor will bear the cost is the greater amount of 2% 2% not stated not stated
claim below which the Contractor will bear the cost is the greater amount of 2% 2% not stated not stated
We have bond facilities in place which would enable us to act as sureties on you not stated not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a Certifi
  • This project number must correspond to the project number given in Appendix B1
  • [Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx] [On Surety’s headed paper]
    1. meet any other requirements set out in sub-criterion 3.3h Performance Bond of the Suitability Assessment Questionnaire issued in connection with the above contract.
  • We have bond facilities in place which would enable us to act as sureties on your behalf in relation to the above contract, the amount of the performance bond to be not more than[●] euros and meeting any supplementary requirements set out in criterion 3.3h of the Suitability Assessment Questionnaire as required by the contract.
  • [Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx] receiving an application from you if your tender is successful.

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-07-21T16:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-07-21T16:00:00+00:00
Date surfaced in documents May 2026
Date surfaced in documents Regulations 2013
Date surfaced in documents Act 2005

8. Contract terms that matter

Contract duration in the extract: 3 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • 6,500,000 Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond
  • ory application, we expect that a bond can be issued within 4 weeks of the receipt by us of the relevant ap
  • Applicant’s current principal banker dated within the past 3 months stating the duration of the relationshi
  • cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap
  • [Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx] [On Surety’s headed paper]
    1. meet any other requirements set out in sub-criterion 3.3h Performance Bond of the Suitability Assessment Questionnaire issued in connection with the above contract.
  • We have bond facilities in place which would enable us to act as sureties on your behalf in relation to the above contract, the amount of the performance bond to be not more than[●] euros and meeting any supplementary requirements set out in criterion 3.3h of the Suitability Assessment Questionnaire as required by the contract.

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx, Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx, Name of Surety

[Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix-C-Bankers-Letter.docx, Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx, 3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx.

Can you bid?

Required certifications

  • OHSAS 18001
  • Safe-T-Cert

Minimum turnover

€3,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Technical Merit

Relevant Experience

Price

Lots (1)

Lot 1

Documents (12)

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx

46.9 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

42.4 KB · Form / Declaration / Certificate

DOCX

3.4.3-HS-Works-Specialist-with-Design-v3.0-28-07-2023.docx

44.0 KB · Form / Declaration / Certificate

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

37.8 KB · Form / Declaration / Certificate

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

26.0 KB · Form / Declaration / Certificate

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

25.6 KB · Form / Declaration / Certificate

DOCX

QW-Part-2-v1.1-18-11-2024E.docx

58.4 KB · Form / Declaration / Certificate

DOCX

QW1-DKIT NB and SB Glazing Rev 00 Part-1-v2.2-18-11-2024-09-01-2025.docx

224.5 KB · Form / Declaration / Certificate

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

31.3 KB · Appendix / Annex

DOCX

Appendix-C-Bankers-Letter.docx

29.9 KB · Appendix / Annex

DOCX

Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx

33.2 KB · Appendix / Annex

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx

26.8 KB · Appendix / Annex

Original notice text

This tender involves the upgrade of the North and South facades at Dundalk Institute of Technology, focusing on glazing works and compliance with health and safety standards.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€3.5m

Deadline

21 Jul

View on eTenders ↗

Location

Dundalk Institute of Technology, Ireland

Procedure

Open

Clarification

07 Jul 2025

eTenders ID

5946860

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender