Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Ballast Building, Crescent Quay, Wexford, A PROTECTED STRUCTURE - Reg. No. WBC0120 - Proposed Alterations and Remedial Works
Awarded Construction & Civil Engineering Works Open

Ballast Building, Crescent Quay, Wexford, A PROTECTED STRUCTURE - Reg. No. WBC0120 - Proposed Alterations and Remedial Works

Deadline

30 Jul

Alterations and remedial works to the protected Ballast Building in Wexford.

SME fit: Medium Bid effort: Medium 📍 Wexford

Alterations and remedial works to the protected Ballast Building in Wexford.

Bidder profile

Mid-sized to large firms with experience in public sector projects and historical building preservation.

Risks & flags

  • Qualification gate
  • Undisclosed contract value
  • Two-step process complexity

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Wexford County Council
Title Ballast Building, Crescent Quay, Wexford, A PROTECTED STRUCTURE - Reg. No. WBC0120 - Proposed Alterations and Remedial Works
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 10 years
Submission deadline 2025-07-30T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Wexford County Council ran this procurement for “Ballast Building, Crescent Quay, Wexford, A PROTECTED STRUCTURE - Reg. No. WBC0120 - Proposed Alterations and Remedial Works” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • plinths with fluted scroll consoles supporting timber canopy below fan-sash overlight all set in a segmental
  • works to suspended timber floors, under no circumstances should props/supports
  • Electricity: Single phase 110 v supply within 25 metres of working areas
  • profile and dimensions to existing to be provided as necessary and supported on wrought iron brackets in a
  • be suitable integrated into fire detection system with override
  • 11.0 Plan for Checking Implementation of Safe Working practices
  • [19.1102 - Preliminary S&H Plan.pdf] 11.0 Plan for Checking Implementation of Safe Working practices
  • Appendix 8 – Existing ESB services in the vicinity
  • Appendix 9 – Existing Irish Water services in the vicinity
  • Appendix 10 – Existing Eircom services in the vicinity
  • Appendix 11 – Existing Gas Networks services in the vicinity Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • A minimum of one project shall predominantly involve works to an existing building in a town centre location
  • PerGFAFormula i:nil="true"/><Description>remove embedded timber beams under roof truss; cut out and dispose of existing
  • es to flat roof finishes to existing main roof including timber decking; disposal off site; all as per Architects drawings and specifications &am
  • <Description>Remove existing timber plywood decking and timber carcass to the roof gutters; reference drawing 10

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Professional Indemnity Insurance required for € n/a[17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
  • Certifications — TEMPORARY WORKS DESIGN CERTIFICATE COMPLETED & SUBMITTED BY CONTRACTOR APPOINTED CHARTERED TEMPORARY WORKS ENGINEER HOLDING A MINIMUM LEVEL OF PI INSURANCE OF €1,500,000. 9
  • Past experience — b) A minimum level of HETAC accredited Level 6 qualification in Engineering, Construction or a related discipline, c) Have worked on a minimum of 2 construction projects of > €0.50m excluding VAT in construction contract
  • Personnel — b) A minimum level of HETAC accredited Level 6 qualification in Engineering, Construction or a related discipline, c) Have worked on a minimum of 2 construction projects of > €0.50m excluding VAT in construction contract; TEMPORARY WORKS DESIGN CERTIFICATE COMPLETED & SUBMITTED BY CONTRACTOR APPOINTED CHARTERED TEMPORARY WORKS ENGINEER HOLDING A MINIMUM LEVEL OF PI INSURANCE OF €1,500,000. 9
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction category[15] € 1,200,000 per financial year for the last 3 financ
  • Professional Indemnity Insurance required for € n/a[17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
  • Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[20] Entitles issuing
  • b) A minimum level of HETAC accredited Level 6 qualification in Engineering, Construction or a related discipline, c) Have worked on a minimum of 2 construction projects of > €0.50m excluding VAT in construction contract

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Professional Indemnity Insurance required for € n/a[17] The 2% not stated not stated
e in any one claim below which the will bear the cost is the greater amount of 2 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • TEMPORARY WORKS DESIGN CERTIFICATE COMPLETED & SUBMITTED BY CONTRACTOR APPOINTED CHARTERED TEMPORARY WORKS ENGINEER HOLDING A MINIMUM LEVEL OF PI INSURANCE OF €1,500,000. 9
  • follows are submitted with the Commencement Notice a min of 2 weeks and max of 4 weeks prior to the commenc
  • llows to be submitted with the Commencement Notice a min of 2 weeks and max of 4 weeks prior to the commenc
  • [Micheal Tierney Report April 2023.pdf] Repairs and Alterations to the former
  • [Micheal Tierney Report April 2023.pdf] roof covering has been replaced with artificial slates.

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-07-30T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-07-30T11:00:00+00:00
Date surfaced in documents May 2025
Date surfaced in documents January 2021
Date surfaced in documents April 2023

8. Contract terms that matter

Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • b) A minimum level of HETAC accredited Level 6 qualification in Engineering, Construction or a related discipline, c) Have worked on a minimum of 2 construction projects of > €0.50m excluding VAT in construction contract
  • "/><Description>The Contractor is required to take photographs of the site at a minimum of twenty five agreed locations on a weekly basis and issue these photos with the progress report
  • b) A minimum level of HETAC accredited Level 6 qualification in Engineering, Construction or a related discipline,
  • Ground floor is a combination of both suspended timber and concrete floors slab
  • PerGFAFormula i:nil="true"/><Description>remove embedded timber beams under roof truss; cut out and dispose of existing
  • <Description>Remove existing timber plywood decking and timber carcass to the roof gutters; reference drawing 10

  • il="true"/><CostPerGFAFormula i:nil="true"/><Description>timber flat roof structure</Description><EstimatingComponents><EstimatingComponent><Esti

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Micheal Tierney Report April 2023.pdf, 19.1102.TD Photo Location Markers.pdf, 19.1102 - Preliminary S&H Plan.pdf.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: Appendix 1 photographic report refers, Appendix 2, SCHEDULE FOR REPOINTING - Appendix 1 + 3 refer.

This tender has been awarded

Can you bid?

Required certifications

  • TEMPORARY WORKS DESIGN CERTIFICATE

Minimum turnover

€1,200,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Alteration and Remedial Works of Ballast Building

Re-roofing, external facade cleaning and restoration, removal of internal drylining systems, and associated siteworks.

Documents (50)

XLSX

91557 BALLAST June 2025 - Pricing Document.xlsx

150.5 KB · Pricing / BOQ / Schedule of Rates

ZIP

BOQ Ballast.zip

1.8 MB · Pricing / BOQ / Schedule of Rates

PDF

19.05.01 - Refurbishment _ Demolition Asbestos Survey.pdf

1.9 MB

PDF

19.1102 - Preliminary INF.pdf

91.2 KB

PDF

19.1102 - Preliminary S&H Plan.pdf

16.6 MB

PDF

19.1102 SCA Drawing Register.pdf

36.5 KB

PDF

19.1102 SCA Project Specificaiton.pdf

436.1 KB

PDF

19.1102.TD Photo Location Markers.pdf

219.6 KB

PDF

19.1102.TD.1.01 Site Location Map.pdf

310.4 KB

PDF

19.1102.TD.1.02 Existing Site Layout Plan.pdf

149.4 KB

PDF

19.1102.TD.1.03 Proposed Site Layout Plan.pdf

153.5 KB

PDF

19.1102.TD.1.04 Site Works Layout.pdf

184.4 KB

PDF

19.1102.TD.10.01 Detail 1 & 2.pdf

224.8 KB

PDF

19.1102.TD.10.02 Detail 3 & 4.pdf

229.2 KB

PDF

19.1102.TD.10.03 Detail 5.pdf

219.5 KB

PDF

19.1102.TD.10.04 Detail 6.pdf

219.8 KB

PDF

19.1102.TD.10.05 Details 7 & 8.pdf

214.7 KB

PDF

19.1102.TD.10.06 Detail 9.pdf

208.0 KB

PDF

19.1102.TD.2.01 Existing Floor Plan Layouts.pdf

324.0 KB

PDF

19.1102.TD.2.02 Proposed Floor Plan Layouts.pdf

341.9 KB

PDF

19.1102.TD.2.03 Proposed Roof Attic Plan.pdf

377.6 KB

PDF

19.1102.TD.2.04 Existing & Proposed Roof Plan.pdf

333.9 KB

PDF

19.1102.TD.3.11 Existing & Proposed North-East Elevation.pdf

547.8 KB

PDF

19.1102.TD.3.12 Existing & Proposed South-East Elevation.pdf

1.1 MB

PDF

19.1102.TD.3.13 Existing & Proposed North-West Elevation.pdf

618.8 KB

PDF

19.1102.TD.3.14 Existing & Proposed South-West Elevation.pdf

695.0 KB

PDF

19.1102.TD.3.21 Existing & Proposed Section A-A.pdf

228.8 KB

PDF

19.1102.TD.3.22 Existing & Proposed Section B-B.pdf

235.3 KB

PDF

19.1102.TD.3.23 Existing & Proposed Section C-C.pdf

332.4 KB

PDF

19.1102.TD.9.01 Roof Light_Hatch Schedule.pdf

216.8 KB

PDF

25013-IS-DRA-SE-0001-Issue Sheet.pdf

181.5 KB

PDF

25013-SP-DRA-SE-0001.pdf

1.6 MB

PDF

25013-X-XXX-DR-DRA-SE-1500.pdf

458.5 KB

PDF

25013-X-XXX-DR-DRA-SE-1501.pdf

391.7 KB

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023 (2).docx

50.6 KB

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023 (2).docx

45.3 KB

PDF

91557 Form of Tender and Schedule BALLAST BUILDING June 2025.pdf

1.1 MB

PDF

91557 Instructions to Tenderers BALLAST BUILDING June 2025.pdf

1.6 MB

PDF

91557 Volume C Pricing Document BALLAST BUILDING June 2025.pdf

1.7 MB

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57 (2).docx

37.8 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE (2).docx

31.3 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution (2).docx

26.0 KB

DOCX

Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond (2).docx

33.2 KB

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond (2).docx

26.8 KB

PDF

Ballast Office Wexford Conservation Report Jan 2021.pdf

4.8 MB

PDF

Glenwood Timber Survey.pdf

5.4 MB

PDF

LAC 2001 - Chief Excutive Order.pdf

748.7 KB

PDF

Micheal Tierney Report April 2023.pdf

3.6 MB

DOCX

QW-Part-2-v1.1-18-11-2024E.docx

58.1 KB

DOCX

QW2-Part-1-v2.1.docx

195.8 KB

Original notice text

Wexford County Council seeks contractors for alterations and remedial works to the Ballast Building, a protected structure, requiring compliance with safety and operational standards over a 10-year contract.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

30 Jul

View on eTenders ↗

Location

Crescent Quay, Wexford, Ireland.

Procedure

Open

Clarification

22 Jul 2025

eTenders ID

5963744

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender