Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / An Grianán Theatre, new studio space and box office
Closed Construction & Civil Engineering Works Open

An Grianán Theatre, new studio space and box office

Deadline

25 Jul

Construction of new studio space and box office at An Grianán Theatre

SME fit: High Bid effort: Medium 📍 Donegal

Construction of new studio space and box office at An Grianán Theatre

Bidder profile

Ideal for firms experienced in public sector construction projects with strong compliance and quality control capabilities.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer An Grianán Theatre
Title An Grianán Theatre, new studio space and box office
CPV / category works / Construction & Civil Engineering
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Port Road, Letterkenny, Co
Contract length not stated
Submission deadline 2025-07-25T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for An Grianán Theatre, new studio space and box office. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in An Grianán Theatre.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction[15] € 1,000,000 *; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 1,000,000[17] *; * The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction[15] € 1,000,000
  • Insurance
  • Public Liability — €6,500,000
  • Employer's Liability — €13,000,000
  • Professional Indemnity — €1,000,000
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction[15] € 1,000,000 *; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 1,000,000[17] *; * The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2025-07-25T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): 24069-ZZ-CHH-SD-ZZ-SP-SE-DC-00.pdf, 01.SAQ_QW2-Part-1-v2.1-18-11-2024-20-05-2025.docx
  • eTenders CFT ID: not stated
  • Clarification contact / portal: eTenders clarification portal
  • Priority attachments: 24069-ZZ-CHH-SD-ZZ-SP-SE-DC-00.pdf, 01.SAQ_QW2-Part-1-v2.1-18-11-2024-20-05-2025.docx

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€1,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,000,000

Scoring

Most Economically Advantageous Tender

Documents (117)

PDF

01.2409-VolumeC_Pricing_Document-19.06.25.pdf

2.6 MB

XLSX

01.2409-VolumeC_Pricing_Document-19.06.25.xlsx

393.1 KB

PDF

01.AnGT- Existing Building plans for Information.pdf

7.3 MB

DOC

01.ITTW4_Invitation_to_Tender.doc

46.0 KB

PDF

01.ITTW4_Invitation_to_Tender.pdf

100.0 KB

PDF

01.List_of_Tender_Documents.pdf

274.9 KB

DOCX

01.SAQ_QW2-Part-1-v2.1-18-11-2024-20-05-2025.docx

208.7 KB

PDF

01.SAQ_QW2-Part-1-v2.1-18-11-2024-20-05-2025.pdf

630.0 KB

PDF

01.Volume_A-Works_Requirements.pdf

1.4 MB

DOCX

02.SAQ_QW-Part-2-v1.1-18-11-2024E-TENDERER_TO_COMPLETE.docx

67.8 KB

PDF

20250617 - Document Issue Register - IP15.pdf

196.1 KB

PDF

20250617 - Drawing Issue Register - IP14.pdf

200.5 KB

PDF

24-069 Issue Sheet.pdf

674.8 KB

PDF

24069-ZZ-CHH-SD-L00-DR-SE-SP-20001-00.pdf

333.4 KB

PDF

24069-ZZ-CHH-SD-L01-DR-SE-SP-20101-00.pdf

345.6 KB

PDF

24069-ZZ-CHH-SD-ZZ-DR-SE-GS-40001-00.pdf

315.9 KB

PDF

24069-ZZ-CHH-SD-ZZ-DR-SE-GS-40002-00.pdf

368.2 KB

PDF

24069-ZZ-CHH-SD-ZZ-DR-SE-GS-40003-00.pdf

378.8 KB

PDF

24069-ZZ-CHH-SD-ZZ-NE-SE-DC-00.pdf

548.6 KB

PDF

24069-ZZ-CHH-SD-ZZ-SP-SE-DC-00.pdf

1.1 MB

PDF

2408_01_ExistingGroundFloorPlan_RevC.pdf

89.7 KB

PDF

2408_02_ExistingFirstFloorPlan_RevC.pdf

83.7 KB

PDF

2408_03_ExistingSectionAA_RevC.pdf

54.0 KB

PDF

2408_04_ExistingSectionBB_RevC.pdf

52.3 KB

PDF

2408_05_GroundFloorPlan_RevC.pdf

117.2 KB

PDF

2408_06_FirstFloorPlan_RevC.pdf

117.6 KB

PDF

2408_07_SectionBB_RevC.pdf

106.7 KB

PDF

2408_08_SectionHH_RevC.pdf

162.3 KB

PDF

2408_09_SectionII_RevC.pdf

91.3 KB

PDF

2408_10_SectionJJ_RevC.pdf

87.6 KB

PDF

2408_11_BoxOffice_FittedFurniture_RevC.pdf

103.2 KB

PDF

2408_12_SectionAA_RevC.pdf

71.7 KB

PDF

2408_13_SectionBB_RevC.pdf

80.3 KB

PDF

2408_14_SectionCC_RevC.pdf

73.8 KB

PDF

2408_15_SectionDD_RevC.pdf

63.5 KB

PDF

2408_16_SectionEE_RevC.pdf

62.6 KB

PDF

2408_17_SectionFF_RevC.pdf

65.3 KB

PDF

2408_18_SectionGG_RevC.pdf

60.4 KB

PDF

2408_19_ElevationA&C_BoxOffice_RevC.pdf

148.6 KB

PDF

2408_20_ElevationB_BoxOffice_RevC.pdf

129.1 KB

PDF

2408_21_BoxOffice_WallDetail_RevC.pdf

222.9 KB

PDF

2408_22_SlidingDoorDetail_RevC.pdf

342.7 KB

PDF

2408_23_Door Schedule_RevC.pdf

210.0 KB

PDF

2408_24_3DView_BoxOffice_RevC.pdf

373.8 KB

PDF

2408_25_3DView_BoxOffice_RevC.pdf

300.9 KB

PDF

2408_26_3DView_BoxOffice_RevC.pdf

779.6 KB

PDF

2408_An Grianan Theatre_Inspection_Plan_May 2025.pdf

66.9 KB

PDF

2408_Cover Page.pdf

263.7 KB

PDF

2408_DAC_Report_250321.pdf

25.4 KB

PDF

2408_Existing_FF_75.pdf

91.2 KB

PDF

2408_Existing_GF_75.pdf

162.1 KB

PDF

2408_Existing_Section AA_75.pdf

63.5 KB

PDF

2408_Existing_Section BB_75.pdf

63.8 KB

PDF

2408_Existing_SP_200_A2.pdf

365.7 KB

PDF

2408_Preliminary SH Plan_June 25.pdf

3.4 MB

PDF

2408_Proposed_FF_75.pdf

137.2 KB

PDF

2408_Proposed_GF_75.pdf

171.6 KB

PDF

2408_Proposed_SectionBB_50.pdf

153.6 KB

PDF

2408_Proposed_SectionHH_50.pdf

142.1 KB

PDF

2409 Instruction to Tenderers W4-v2.0-20-05-25.pdf

1.3 MB

PDF

2409 Tender & Schedule FTS-6-v1.6-18-04-2025.pdf

923.1 KB

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx

50.0 KB

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

45.5 KB

PDF

6378 - E_Front Cover.pdf

264.9 KB

PDF

6378 - E_Section 1 - Introduction.pdf

109.9 KB

PDF

6378 - E_Section 2 - Scope of Works.pdf

158.2 KB

PDF

6378 - E_Section 3 - Particular Specification.pdf

581.2 KB

PDF

6378 - E_Section 4 - General Specification.pdf

900.7 KB

PDF

6378 - E_Section 5 - Equipment Schedules.pdf

318.6 KB

PDF

6378 - E_Section_6 - Pricing Schedule.pdf

554.0 KB

PDF

6378 - M_Front Cover.pdf

669.3 KB

PDF

6378 - M_Section 1 - Introduction.pdf

307.6 KB

PDF

6378 - M_Section 2 - Scope of Works.pdf

361.1 KB

PDF

6378 - M_Section 3 - Particular Specification.pdf

373.9 KB

PDF

6378 - M_Section 4 - General Specification.pdf

1008.9 KB

PDF

6378 - M_Section 5 - Equipment Schedule.pdf

529.8 KB

PDF

6378 - M_Section 6 - Pricing Schedule.pdf

673.5 KB

PDF

6378 PL-E60-001 T0.pdf

2.6 MB

PDF

6378 PL-E60-101 T0.pdf

1.4 MB

PDF

6378 PL-E61-001 T0.pdf

501.1 KB

PDF

6378 PL-E61-101 T0.pdf

445.6 KB

PDF

6378 PL-E62-001 T2.pdf

269.0 KB

PDF

6378 PL-E62-101 T1.pdf

521.4 KB

PDF

6378 PL-E63-001 T2.pdf

288.9 KB

PDF

6378 PL-E63-101 T2.pdf

455.6 KB

PDF

6378 PL-E67-001 T1.pdf

588.5 KB

PDF

6378 PL-E67-001 T2.pdf

588.9 KB

PDF

6378 PL-E67-101 T2.pdf

576.3 KB

PDF

6378 PL-E68-001 T1.pdf

596.3 KB

PDF

6378 PL-E68-101 T1.pdf

403.8 KB

PDF

6378 PL-M56-001 T1.pdf

512.6 KB

PDF

6378 PL-M56-101 T1.pdf

464.1 KB

PDF

6378 PL-M57-001 T1.pdf

610.1 KB

PDF

6378 PL-M57-101 T1.pdf

363.0 KB

PDF

6705-BB7-XX-00-DR-Y-1003.pdf

316.8 KB

PDF

6705-BB7-XX-01-DR-Y-1004.pdf

346.3 KB

PDF

6705-BB7-XX-XX-DR-Y-1001.pdf

478.1 KB

PDF

6705-BB7-XX-XX-DR-Y-1002.pdf

486.6 KB

PDF

6705-BB7-XX-ZZ-DR-Y-1005.pdf

278.2 KB

PDF

6705-BB7-XX-ZZ-DR-Y-1006.pdf

315.3 KB

PDF

6705-BB7-XX-ZZ-DR-Y-1007.pdf

271.8 KB

PDF

6705-BB7-XX-ZZ-DR-Y-1008.pdf

262.8 KB

PDF

6705-BB7-XX-ZZ-DR-Y-1009.pdf

278.0 KB

PDF

6705-BB7-ZZ-ZZ-RP-Y-1000.pdf

5.9 MB

PDF

A-00262 - Port Road - Management Survey.pdf

1.9 MB

PDF

A-00262B - Port Road - Refurbishment.pdf

1.0 MB

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

40.8 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

33.8 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

29.1 KB

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

28.7 KB

DOCX

Appendix-C-Bankers-Letter.docx

32.9 KB

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx

29.8 KB

PDF

DAC 2512436DL - Cert.pdf

381.6 KB

PDF

Form_of_Application_for_a_Fire_Safety_Certificate.pdf

287.5 KB

DOCX

MF-1.21-18-11-2024-Performance_Bond.docx

69.9 KB

DOCX

MF-1.22-09-04-2020-Project_Supervisor.docx

35.9 KB

DOCX

MF-1.23-09-04-2020-Rates_of_Pay.docx

35.3 KB

Original notice text

This tender involves the construction of a new studio space and box office for An Grianán Theatre, ensuring compliance with public procurement standards and quality specifications.

AI analysis updated 4 months, 1 week ago

Bid ↗
Details

Deadline

25 Jul

View on eTenders ↗

Location

Port Road, Letterkenny, Co Donegal

Procedure

Open

Clarification

16 Jul 2025

eTenders ID

5943634

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender