← Tenders / Invitation to Tender for the Development of 1 No. Five Bedroom, Two Storey Detached Housing Unit including all associated Siteworks at No.5 Bridge Road, Abbeydorney, Co. Kerry for Kerry County Council
Awarded Construction & Civil Engineering Works SME Suitable Open

Invitation to Tender for the Development of 1 No. Five Bedroom, Two Storey Detached Housing Unit including all associated Siteworks at No.5 Bridge Road, Abbeydorney, Co. Kerry for Kerry County Council

Deadline

23 Jul

Tender for a five-bedroom detached housing unit development in Abbeydorney, Co. Kerry

SME fit: Medium Bid effort: Medium 📍 Kerry

Tender for a five-bedroom detached housing unit development in Abbeydorney, Co. Kerry

Bidder profile

Ideal for mid-sized to large construction firms with experience in public sector projects and a strong compliance framework.

Risks & flags

  • Undisclosed contract value
  • Qualification gate for turnover
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Kerry County Council_1204
Title Invitation to Tender for the Development of 1 No. Five Bedroom, Two Storey Detached Housing Unit including all associated Siteworks at No.5 Bridge Road, Abbeydorney, Co. Kerry for Kerry County Council
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 3 years
Submission deadline 2025-07-23T14:00:00+00:00
Go-live / start not stated

2. Scope of Work

Kerry County Council_1204 ran this procurement for “Invitation to Tender for the Development of 1 No. Five Bedroom, Two Storey Detached Housing Unit including all associated Siteworks at No.5 Bridge Road, Abbeydorney, Co. Kerry for Kerry County Council” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • • Additional supports: Locate within 150 mm of connections, junctions and changes of
  • Standards for Electrical Services Revision 5 January 2014
  • · Mechanical services contractors is to coordinate will all other trades on site
  • · Heating system to incorporate isolation valves, expansion vessel, stainless steel
  • · Contractor to supply full method statement for installation of UFH system to be
  • · Final Underfloor Heating Heating (UFH) system is to be designed and installed by an
  • Schedule of all pipe sizes and supporting calculations to be provided to the
  • [H-22-004-T-413 Heating.pdf] system is to be designed and installed by an
  • System to incorporate sleeve pipe to allow movement at rise to manifolds and
  • expansion joints, edge insulation, rapid rail or equivalent fixing system and clips
  • Apply screed water migration barrier equal to a 500μm polythene protection sheet Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The extract showed a structured PQQ-to-ITT sequence intended to shortlist capable bidders before full award-stage submission. Programme and policy framing was only partially visible, but continuity and modernisation drivers were evident in the procurement design.

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Professional Indemnity Insurance required for € n/a[17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
  • Certifications — The minimum average turnover must meet or exceed the value stated above If the Applicant provides evidence of certified turnover having a total combined turnover of €1.5 million (excluding VAT) over the three previous
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction[15] € 500,000 CA SUPPLEMENTARY REQUIREMENTS: Th
  • The minimum average turnover must meet or exceed the value stated above If the Applicant provides evidence of certified turnover having a total combined turnover of €1.5 million (excluding VAT) over the three previous
  • Professional Indemnity Insurance required for € n/a[17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
  • Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13000000[20] Entitles issuing

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Professional Indemnity Insurance required for € n/a[17] The 2% not stated not stated
e in any one claim below which the will bear the cost is the greater amount of 2 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
  • [H-22-004-T-413 Heating.pdf] KITCHEN
  • [H-22-004-T-413 Heating.pdf] BE READ IN CONJUNCTION WITH
  • [H-22-004-T-413 Heating.pdf] Layout
  • [H-22-004-T-413 Heating.pdf] system is to be designed and installed by an

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-07-23T14:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-07-23T14:00:00+00:00
Date surfaced in documents 5 January 2014
Date surfaced in documents October 2019
Date surfaced in documents November 2020

8. Contract terms that matter

Contract duration in the extract: 3 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • Ensure that the free area of the terminal opening is a minimum of 90% of
  • air terminals are separated by a minimum of
  • Ensure that the free area of the terminal/grille opening is a minimum of
  • CA SUPPLEMENTARY REQUIREMENTS: The minimum average turnover will be determined by calculating the combined construction turnover for the previous 3 years and then dividing by 3
  • cluded on each B2 form (a combination of smaller works contracts to satisfy the minimum requirements in terms of value, nature and complexity cannot be used as evidence and will not be acceptable)
  • r working as a subcontractor on a project will not be acceptable to satisfy the minimum requirements in terms of value, nature and complexity cannot be used as evidence under this criteria or any other criteria inluding supplments 3
  • • Provision of additional ties: Within 225 mm of reveals of unbonded openings

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: H-22-004-T-413 Heating.pdf, H-22-004-T-310-Internal Joinery.pdf, H-22-004-T-220 Section AA.pdf.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: H-22-004-T-410 Water.pdf, H-22-004-T-500 Site Investigation.pdf, H-22-004-T-301 Wall-Floor-Threshold Details.pdf.

This tender has been awarded

Can you bid?

Minimum turnover

€1,500,000

Public liability insurance

€6,500,000

Scoring

Lowest Price

Lots (1)

Lot 1: Development of a Five-Bedroom Detached Housing Unit

Construction of a five-bedroom, two-storey detached housing unit including all associated siteworks at No. 5 Bridge Road, Abbeydorney, Co. Kerry.

Documents (56)

DOCX

3.4.1-HS-Works-Contractor.docx

50.0 KB

DOCX

3.4.2-HS-PSCS.docx

45.0 KB

PDF

_KCC Note Electronic Tender Submissions.pdf

145.7 KB · Tender Response Template

PDF

Achieving Compliance with Part F 2019.pdf

1.1 MB

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

41.1 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

28.6 KB

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

29.0 KB

DOCX

Appendix-C-Bankers-Letter.docx

32.5 KB

PDF

Electrical Specification_No 5 Abbeydorney_R1.pdf

529.2 KB

PDF

H-22-004-T-001_Site Location Map-2500.pdf

238.7 KB

PDF

H-22-004-T-010 Existing & Demolitions Plan.pdf

327.0 KB

PDF

H-22-004-T-1 Civil&Struc Spec.pdf

728.3 KB

PDF

H-22-004-T-100_Site Layout Plan.pdf

530.0 KB

PDF

H-22-004-T-200_House Plan.pdf

392.4 KB

PDF

H-22-004-T-201 Elevations.pdf

291.5 KB

PDF

H-22-004-T-202 Window & Door Schedules.pdf

322.6 KB

PDF

H-22-004-T-220 Section AA.pdf

826.8 KB

PDF

H-22-004-T-221 Section BB.pdf

610.6 KB

PDF

H-22-004-T-301 Wall-Floor-Threshold Details.pdf

700.6 KB

PDF

H-22-004-T-302-Window Details-Head-Cill.pdf

358.6 KB

PDF

H-22-004-T-303-Eaves Details.pdf

435.5 KB

PDF

H-22-004-T-310-Internal Joinery.pdf

315.2 KB

PDF

H-22-004-T-311 Tank & Trap Door Details.pdf

492.0 KB

PDF

H-22-004-T-312 Bed Reinforcement.pdf

196.6 KB

PDF

H-22-004-T-313 Fitted Furniture.pdf

282.0 KB

PDF

H-22-004-T-314 Wet Room - Bathroom.pdf

565.7 KB

PDF

H-22-004-T-315 Heat Pump-Bin Compound and Side Access Gates.pdf

217.6 KB

PDF

H-22-004-T-316_Boundary, Garden and Divisional walls.pdf

244.1 KB

PDF

H-22-004-T-317_Soakway.pdf

432.3 KB

PDF

H-22-004-T-319 ESB Meter Cabinet Details.pdf

351.4 KB

PDF

H-22-004-T-410 Water.pdf

934.1 KB

PDF

H-22-004-T-411 Soil & Waste Water.pdf

695.3 KB

PDF

H-22-004-T-412 Ventilation.pdf

946.5 KB

PDF

H-22-004-T-413 Heating.pdf

742.1 KB

PDF

H-22-004-T-414 Electrical & Fire Detection.pdf

703.4 KB

PDF

H-22-004-T-415 General Electrical.pdf

1.5 MB

PDF

H-22-004-T-416 ESB Ducting.pdf

473.2 KB

PDF

H-22-004-T-417_ESB + EIR Site Services.pdf

221.5 KB

PDF

H-22-004-T-418_Water Mains Connection.pdf

219.1 KB

PDF

H-22-004-T-500 Site Investigation.pdf

320.8 KB

PDF

H-22-004-T-501 Foundation Layout Plan & Details.pdf

332.0 KB

PDF

H-22-004-T-502 Structural Floor Plans.pdf

264.4 KB

PDF

H-22-004-T-503 Structural Roof Plan.pdf

383.3 KB

PDF

H-22-004-T-504 Elevations Showing MCJs.pdf

216.8 KB

PDF

H-22-004-T-505 Structural Notes.pdf

207.0 KB

PDF

H-22-004-T-506 Driveway.pdf

202.3 KB

PDF

H-22-004-T-Architectural Specification-June 2025.pdf

565.0 KB

PDF

Irish Water_Wastewater-Code-of-Practice.pdf

1.7 MB

PDF

ITT No. 5 Bridge Rd_Abbeydorney.pdf

457.4 KB

PDF

Mechanical Specification_No 5 Abbeydorney_R1.pdf

786.4 KB

DOCX

QW-Part-2 No. 5 Bridge Rd_Abbeydorney.docx

58.3 KB

DOCX

QW2-Part-1 No. 5 Bridge Rd_Abbeydorney.docx

198.9 KB

PDF

TGD L - ACDs Cavity Wall Insulation.pdf

2.0 MB

PDF

TGD L - ACDs Timber Frame Insulation.pdf

2.0 MB

PDF

TGD L - Thermal Bridging Air Infiltration ACDs.pdf

2.2 MB

PDF

TGD_F_2019.pdf

1.0 MB

Original notice text

Kerry County Council seeks tenders for the construction of a five-bedroom, two-storey detached house at No.5 Bridge Road, Abbeydorney, including all associated site works over a 3-year period.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

23 Jul

View on eTenders ↗

Location

No.5 Bridge Road, Abbeydorney, Co. Kerry, Ireland

Procedure

Open

Clarification

09 Jul 2025

eTenders ID

5934075

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender