Aghafad Pedestrian and Cycle Scheme
Deadline
21 Jul
21 Jul 2025
Deadline
21 Jul
Construction of the Aghafad Pedestrian and Cycle Scheme for Longford County Council
Construction of the Aghafad Pedestrian and Cycle Scheme for Longford County Council
Bidder profile
Firms with experience in public works and compliance with procurement standards will find this tender suitable.
Risks & flags
- Information asymmetry
- Compliance risks
- Timeline compression
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Longford County Council |
| Title | Aghafad Pedestrian and Cycle Scheme |
| CPV / category | works / Construction & Civil Engineering |
| Estimated value | €not disclosed (eTenders placeholder) |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location Applicant Entry | |
| Contract length | not stated |
| Submission deadline | 2025-07-21T15:00:00+00:00 |
| Go-live / start Applicant Entry Date of Substantial Completion of the Works: Applicant Entry |
2. Scope of Work
This procurement covered the supply scope described in the tender pack for Aghafad Pedestrian and Cycle Scheme. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.
- Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Longford County Council.
- Submission package must align with the RFT structure published through the buyer's procurement channel.
- Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
- Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
- Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
- Numerical obligations surfaced in the verified extract: Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Roadworks in the public road[15] € 1,000,000 CA SUPPLEMENTARY REQUIREMENTS: N/; Professional Indemnity Insurance required for € N/A[17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500.000[19] Maximum level o
The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.
3. Background & buyer context
The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.
4. Eligibility & selection criteria
- Turnover requirement — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Roadworks in the public road[15] € 1,000,000
- Insurance
- Public Liability — €6,500.000
- Employer's Liability — €13,000,000
- Professional Indemnity — €5,000.
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
Binding numerical extract used for this section: Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Roadworks in the public road[15] € 1,000,000 CA SUPPLEMENTARY REQUIREMENTS: N/; Professional Indemnity Insurance required for € N/A[17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500.000[19] Maximum level o
5. Award criteria & scoring
The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.
| Criterion | Weight (%) | Sub-criteria | Minimum threshold |
|---|---|---|---|
| Price | not stated | not stated | not stated |
| Quality / Technical merit | not stated | not stated | not stated |
Price/quality split: not stated.
6. Submission requirements
- Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
- CVs — provide role-based CVs where requested; page count not stated.
- Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
- Case studies — number and value bands not stated in the extract.
- Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
- Mandatory site visit — not stated in the extract.
- Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.
7. Key dates & process
| Milestone | Date / timing |
|---|---|
| RFT issued | not stated |
| Clarification deadline | not stated |
| Mandatory site visit | not stated |
| Tender deadline (date + time) | 2025-07-21T15:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.
9. Risks, red flags & unusuals
The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.
10. SME fit assessment
This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.
11. Where to dig deeper
- Source RFT file(s): Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx, A3 Civils Dwg R1 Aghafad Longford.pdf
- eTenders CFT ID: not stated
- Clarification contact / portal: [email protected]
- Priority attachments: Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx, A3 Civils Dwg R1 Aghafad Longford.pdf, 3.4.2-HS-PSCS-v3.0-28-07-2023.docx
This tender has been awarded
- Lakeland Civil Engineering Ltd. · 22 Sep 2025
Can you bid?
Required certifications
- Safe-T-Cert
Minimum turnover
€1,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€5,000
Scoring
Most Economically Advantageous Tender
Documents (34)
122259 Preliminary Health and Safety Plan R0.pdf
583.8 KB
122259 Volume C Pricing Document.xlsx
894.1 KB
17790 Stoneyard Quotation.pdf
20.9 KB
21 - PWS GR36 Driver Feedback Signs.pdf
1.7 MB
3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx
50.6 KB
3.4.2-HS-PSCS-v3.0-28-07-2023.docx
44.8 KB
37769_1_Aghafad Longford Active Travel.pdf
293.3 KB
6364 Aghafad & Granard, Longford (Aghafad) UG Report.pdf
1.1 MB
6364 Aghafad and Granard Longford Survey_Aghafad_UG_ITM15_2D.pdf
962.7 KB
A3 Civils Dwg R1 Aghafad Longford.pdf
2.5 MB
Aghafad Topo Survey Sheet 1 of 2.pdf
447.1 KB
Aghafad Topo Survey Sheet 2 of 2.pdf
419.2 KB
Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx
37.8 KB
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
32.8 KB
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
26.0 KB
Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx
26.8 KB
DFS Sign 50 kmh Do Luas Your Speed PWS.pdf
459.7 KB
Instruction to Tenderers R0.docx
63.8 KB
Invitation to Tender.pdf
85.9 KB
MF-1.21-18-11-2024.docx
67.3 KB
MF-1.21-18-11-2024.pdf
311.7 KB
MF-1.22-09-04-2020.docx
35.9 KB
MF-1.22-09-04-2020.pdf
249.3 KB
MF-1.23-09-04-2020.docx
35.3 KB
MF-1.23-09-04-2020.pdf
181.5 KB
plot.log
177 bytes
PT - Aghafad Longford Active Travel.pdf
187.1 KB
PW-CF6-v1.14-19-07-2023.pdf
274.1 KB
QW-Part-2-v1.1-18-11-2024E.docx
58.3 KB
QW2-Part-1-v2.1-18-11-2024-09-01-2025.docx
196.4 KB
Volume A Works Requirements Part 1 R0.pdf
5.2 MB
Volume A Works Requirements Part 2.pdf
34.2 MB
Volume B Tender and Schedule R0.docx
58.7 KB
Volume C Pricing Document R0.pdf
576.5 KB
Original notice text
This tender involves the construction of the Aghafad Pedestrian and Cycle Scheme, focusing on compliance with public procurement standards and quality specifications.
AI analysis updated 4 months ago
Deadline
21 Jul
Buyer
Longford County CouncilLocation
Aghafad, Longford, Ireland
Procedure
Open
Clarification
16 Jul 2025
eTenders ID
5916714
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender