← Tenders / Car Park Upgrade Works at GRETB Loughrea FET Training Centre
Awarded Construction & Civil Engineering Works Open

Car Park Upgrade Works at GRETB Loughrea FET Training Centre

Deadline

01 Jul

Upgrade works for the car park at GRETB Loughrea FET Training Centre.

SME fit: Medium Bid effort: Medium 📍 Galway

Upgrade works for the car park at GRETB Loughrea FET Training Centre.

Bidder profile

Ideal for mid-sized to large firms with experience in public sector projects and compliance processes.

Risks & flags

  • Undisclosed contract value
  • Qualification gate for turnover
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Galway Roscommon Education and Training Board_92189
Title Car Park Upgrade Works at GRETB Loughrea FET Training Centre, Mount Carmel Road, Loughrea, Co. Galway. H62 T262
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 6 months
Submission deadline 2025-07-01T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Galway Roscommon Education and Training Board_92189 ran this procurement for “Car Park Upgrade Works at GRETB Loughrea FET Training Centre, Mount Carmel Road, Loughrea, Co. Galway. H62 T262” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • One examination at 3 months’ operations and 6 months’ operations and at the end of the Def
  • LIGHTING BOLLARDS SHOULD BE A GROUND ROOT MOUNT SYSTEM APPROX.
  • •Provide support for research and development into markets
  • •Develop guidelines to facilitate the adoption of a systematic
  • •Support legislation and resources to facilitate the closure of
  • not being captured in the official data collection system and
  • This network will be supported by mobile crushers
  • system for waste management facilities is
  • a. A history of unsatisfactory quality or service from a previous recoverer Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • paid into an Environmental Fund, initially at a rate of €15
  • Insurer, Policy Number and Renewal Date
  • REMOVE EXISTING GATES & INSTALL NEW AUTOMATED GATES TO MATCH EXISTING
  • costs are rising steeply. Government policy and waste management

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event ; 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works €10,000 * public liability €6,500[9] * employer’s liability €6,500[10]
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event
  • 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works €10,000 * public liability €6,500[9] * employer’s liability €6,500[10]

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
  • [25.110-010.pdf] 150mm POROUS DISTRIBUTOR
  • [25.110-010.pdf] @collinsboydeng.com
  • [FAS_CIFHandbookonConstructionandDemolitionWasteManagement.pdf] construction and
  • [FAS_CIFHandbookonConstructionandDemolitionWasteManagement.pdf] INTRODUCTION

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-07-01T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-07-01T11:00:00+00:00
Date surfaced in documents 1 June 2002
Date surfaced in documents June 2002
Date surfaced in documents December 2001

8. Contract terms that matter

Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
  • it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
  • the same terms as the insurances the Contractor is required to have under clause 10
  • until the pipe has a minimum of 150mm compacted cover
  • pipes, fittings and accessories, to the requirements of IS EN 545
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
  • the Works within 12 months after the termination, the Contractor’s payment under this clause

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 25.110-010.pdf, FAS_CIFHandbookonConstructionandDemolitionWasteManagement.pdf, Waste Management Guidelines 2006.pdf.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: 25.110-003.pdf, FTS-6-v1.6-19-07-2023-1_Tender & Schedule.docx, Schedule says that a performance bond is required, within 7 days after the Employer send.

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€6,500

Scoring

Lowest Price

Documents (26)

PDF

25.109 Civils Works Specification.pdf

404.5 KB

PDF

25.110 Invitation to Tender AMENDED.pdf

108.4 KB

PDF

25.110 Loughrea Survey Map.pdf

172.1 KB

OTHER

25.110 PSCS Competancy Questionaire.rtf

728.7 KB

PDF

25.110 Volume A1 Works Requirements.pdf

366.8 KB

PDF

25.110- Preliminary H&S Plan.pdf

302.9 KB

PDF

25.110-001.pdf

1.1 MB

PDF

25.110-002.pdf

1.1 MB

PDF

25.110-003.pdf

565.0 KB

PDF

25.110-010.pdf

1.2 MB

PDF

25_233_01_Collins_Boyd_Loughrea_FET_Centre_Loughrea_Co_Galway.pdf

741.1 KB

PDF

A) ETB's INSURANCE CHECKLIST of Required Docs.pdf

288.7 KB

DOC

Appendix C1 - H&S.doc

66.0 KB

DOC

Declaration of Suitability Doc.doc

111.0 KB

PDF

DEHLG-Guidelines of WasteManagement.pdf

277.9 KB

PDF

Eircode.pdf

153.3 KB

PDF

FAS_CIFHandbookonConstructionandDemolitionWasteManagement.pdf

2.8 MB

DOCX

FTS-6-v1.6-19-07-2023-1_Tender & Schedule.docx

64.7 KB

PDF

GRETB Brief - Loughrea FET.pdf

1.5 MB

PDF

ITT-W4-v2.0-18-11-24.pdf

427.9 KB

DOCX

MF-1.13-09-04-2020.docx

49.5 KB

DOCX

MF-1.22-09-04-2020.docx

35.5 KB

OTHER

plot.log

568 bytes

PDF

PW-CF6-v1.14-19-07-2023.pdf

612.0 KB

XLS

Volume C - Pricing Document.xls

73.5 KB

PDF

Waste Management Guidelines 2006.pdf

365.4 KB

Original notice text

This tender involves upgrading the car park at GRETB Loughrea FET Training Centre, including installation of new automated gates and lighting bollards, with a contract duration of 6 months.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

01 Jul

View on eTenders ↗

Location

Installation of a carpark to the rear of Loughrea Further Education Centre, Mt Carmel Rd, Loughrea, Co. Galway

Procedure

Open

Clarification

19 Jun 2025

eTenders ID

5880249

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender