← Tenders / Architectural Design Services including Energy Efficient Design, PSDP and Assigned Certification for the Burns Unit Refurbishment and Upgrade Works – Phases 2 and 3 at St James’s Hospital
Awarded Building Services & Maintenance Services SME Suitable Open

Architectural Design Services including Energy Efficient Design, PSDP and Assigned Certification for the Burns Unit Refurbishment and Upgrade Works – Phases 2 and 3 at St James’s Hospital

Value

€200k

Deadline

11 Jul

Architectural design services for Burns Unit refurbishment at St James's Hospital.

SME fit: Medium Bid effort: Medium 📍 Dublin

Architectural design services for Burns Unit refurbishment at St James's Hospital.

Bidder profile

Firms with experience in public sector architectural services and energy-efficient design.

Risks & flags

  • Eligibility criteria ambiguity
  • Two-step tender process
  • Compliance evidence requirements

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer St James's Hospital
Title Architectural Design Services including Energy Efficient Design, PSDP and Assigned Certification for the Burns Unit Refurbishment and Upgrade Works – Phases 2 and 3 at St James’s Hospital
CPV / category services
Estimated value 200000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 3 months
Submission deadline 2025-07-11T13:00:00+00:00
Go-live / start not stated

2. Scope of Work

St James's Hospital ran this procurement for “Architectural Design Services including Energy Efficient Design, PSDP and Assigned Certification for the Burns Unit Refurbishment and Upgrade Works – Phases 2 and 3 at St James’s Hospital” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Title: Architectural Design Services including Energy Efficient Design, PSDP and Assigned Certification for the Burns Unit Refurbishment and Upgrade Works – Phases 2 and 3 at St James’s Hospital
  • Sector: Building Services & Maintenance
  • N Note5:\nThe Tenderer shall note that their commitment in this document is a minimum level of service and that at all times the Tenderer shall provide their professional service in a timely manner and in line with the Technical Requirements document which forms part of this tender package
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • ted Date for Commencement of Service: Within 3 months of tender close subject to HSE approvals Within 3 months of tender close subject to HSE appr
  • Anticipated Date for Commencement of Service: Within 3 months of tender close subject to HSE approval
  • Open Procedure for CONSULTANCY SERVICES
  • FOR USE WITH THE CONDITIONS OF ENGAGEMENT FOR CONSULTANCY SERVICES
  • for Consultancy Services for the use with the Conditions of Engagement
  • for Consultancy Services using a Formula to Calculate Hourly Rates
  • The Contracting Authority is making these documents available to Applicants for the Services Contract identified in the Particulars, for tendering purposes only. These documents must not be used for any other purpose.
  • In no circumstances shall the Contracting Authority, its advisers, consultants, servants and/or agents incur any liability or responsibility for the legality, validity, effectiveness, adequacy or enforceability of any documentation executed, or which may be executed, in relation to the Services. Any costs associated with the submission of a tender are the sole responsibility of the Applicant and will not be reimbursed. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Nothing contained in these Instructions is, or shall be relied upon as, a representation of fact or promise as to the future. Any summaries or descriptions of documents or contractual arrangements contained in any part of these Instructions cannot be and are not intended to be comprehensive, nor any substitute for the underlying documentation (whether existing or to be concluded in the future), and are in all respects qualified in their entirety by reference to them.
  • If the Applicant is unsuccessful as part of the tender process, such personal data will be retained until three years after the conclusion of the tender process or the award of the contract to the successful Tenderer, whichever is later. If the Applicant is successful, and a contract is awarded to the Applicant at the end of the tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Employer upon request.

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance — not specified for this tender
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Number and type of Electronic Copies of Tender: One - PDF
  • to the eTenders web portal for the specific project (within 14 days)
  • The Contracting Authority has sent a contract notice and tender documents for the Services to etenders and where appropriate a similar notice has been simultaneously sent to the Office for Official Publications of the EC for publication in the OJEU. The notice and tender documents are addressed to all those who wish to participate in a tender competition for the Services described in the “Particulars”.
  • These documents set out the award criteria and the award process which will be followed by the Contracting Authority in making the assessment of whether Applicants are suitable to provide the Services and, from those Applicants deemed to be suitable, which tender is the most economically advantageous. These documents also set out the information which must be supplied by Applicants. Tenders must be submitted in accordance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
  • Suitability assessment questionnaires
  • Any information submitted with tenders and not called for in these Instructions or in post-tender clarifications

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-07-11T13:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-07-11T13:00:00+00:00
Date surfaced in documents 4 November 2024
Date surfaced in documents 25 May 2018
Date surfaced in documents November 2024

8. Contract terms that matter

Contract duration in the extract: 3 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • NOW IT IS HEREBY AGREED, in consideration of the payment of €5 (five Euro) from the Client to the Sub-Consultant, receipt and sufficiency of w
  • Anticipated Date for Commencement of Service: Within 3 months of tender close subject to HSE approval
  • rights of termination (and the like) will cease if, within 28 days from receipt of the Discontinuance Noti
  • These documents are being made available by the Contracting Authority to Applicants on the terms set out in these Instructions. These documents are not being distributed to the public and have not been filed, registered or approved in any jurisdiction. Possession or use of these documents in any manner contrary to any applicable law is expressly prohibited. Applicants shall inform themselves concerning and shall observe any applicable legal requirements.
  • Nothing contained in these Instructions is, or shall be relied upon as, a representation of fact or promise as to the future. Any summaries or descriptions of documents or contractual arrangements contained in any part of these Instructions cannot be and are not intended to be comprehensive, nor any substitute for the underlying documentation (whether existing or to be concluded in the future), and are in all respects qualified in their entirety by reference to them.
  • No legal relationship or other obligation shall arise between any Tenderer and the Contracting Authority including in respect of the Competition (except for the Tenderer’s irrevocable offer to be bound by its tender for the period stated) unless and until the Contract has been entered into by issue of the Letter of Acceptance and the successful Tenderer and any conditions precedent to its effectiveness have been fulfilled. The Contracting Authority shall not be obliged to appoint any of the Tenderers to undertake the Services and the Contracting Authority reserves the right not to proceed with the award process and to withdraw from the process at any time. No contract to be entered into with the successful Tenderer will contain any representation or warranty in respect of these Instructions.
  • Applicants must treat these Instructions, their tenders, and their participation in this competition as confidential. Applicants must not disclose any information about this competition to anyone other than to those who have a legitimate need to know or whom they need to consult for the purpose of tendering, and then only on a confidential basis, or as required by law. Applicants shall promptly return these Instructions to the Contracting Authority upon request.

9. Risks, red flags & unusuals

  • Numeric qualification gates were only partially visible, so eligibility certainty required full pack review.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — specialist operator with compliant procurement governance and evidencable experience.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: ITT-S2a-v2.0-04-11-2024E.docx, 4.14_BurnsPh2+3_RAS_Arch_C.12.03.2021.xlsx, ITT-S2a-v2.0-04-11-2024E.docx] Instruction to Tenderers.
  • eTenders CFT / notice reference: contract notice and tender documents for the Services to etenders and where.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: ITT-S2(a) v2.0, ITT-S2a-v2.0-04-11-2024E.docx] any applicable law is expressly prohibited. Applica, ITT-S2a-v2.0-04-11-2024E.docx] to take such steps as it considers appropriate, incl.

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€2,000,000

Professional indemnity insurance

€1,000,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (9)

PDF

Final_Outline_Design_Brief_National_Burns_Centre_Phase_2 3.pdf

615.7 KB · Specification

DOCX

ITT-S2a-v2.0-04-11-2024E.docx

85.3 KB · RFT / Invitation to Tender

DOCX

MF-2.3-v1.2-14-10-2024.docx

45.3 KB · Contract / Agreement / Terms

DOCX

MF-2.7-09-02-2022.docx

28.6 KB · Form / Declaration / Certificate

DOCX

MF-2.9-09-02-2022.docx

55.1 KB · Form / Declaration / Certificate

DOCX

MF_2.4 (1).docx

21.5 KB · Form / Declaration / Certificate

DOCX

MF_2.5.docx

21.3 KB · Form / Declaration / Certificate

XLSX

4.14_BurnsPh2+3_RAS_Arch_C.12.03.2021.xlsx

43.3 KB · Other

DOCX

MF-2.1-09-02-2022 (1).docx

40.5 KB · Insurance / Indemnity

Original notice text

Provision of architectural design services, including energy-efficient design and assigned certification for the refurbishment and upgrade of the Burns Unit at St James's Hospital over a 3-month period.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€200k

Deadline

11 Jul

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

29 Jun 2025

eTenders ID

5842725

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender