Pump Station Control Panel Replacement, Blackstone, Co Wexford
Value
€60k
Deadline
27 Jun
27 Jun 2025
Value
€60k
Deadline
27 Jun
Replacement of pump station control panel in Blackstone, Co Wexford.
Replacement of pump station control panel in Blackstone, Co Wexford.
Bidder profile
Firms with experience in public sector tenders and operational capabilities in building services.
Risks & flags
- Qualification gate
- Two-step process
- Compliance evidence required
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Office of Public Works (OPW) |
| Title | Pump Station Control Panel Replacement, Blackstone, Co Wexford |
| CPV / category | supplies |
| Estimated value | 60000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 2 year |
| Submission deadline | 2025-06-27T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Office of Public Works (OPW) ran this procurement for “Pump Station Control Panel Replacement, Blackstone, Co Wexford” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Sector: Building Services & Maintenance
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
- (Additional supporting documentation will be required prior to award or upon request by the Contracting Authority, as
- Aftersales Support - over and above minimum outlined in the Compliance to
- the supply of the goods as described in Appendix 1 to this RFT (the “Goods”).
- the successful implementation of any Goods Contract that may result from this Competition
- services to the Union’s public procurement and concession markets and procedures
- supporting negotiations on access of Union economic operators, goods and services to the
- follow the necessary steps on the eTenders platform to ensure that their tender has been
- the supply of samples for purposes of tendering and their return after evaluation or
- Contract arising out of this Competition, the successful Tenderer shall be required to supply its Tax
- status by the Contracting Authority. By supplying these numbers the successful Tenderer Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Contracting Authority policy seeks to encourage participation on a fair and equal basis by
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The successful Tenderer shall be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €12,700,000 for any one claim or series of claims arising out of a single occurence Public Liability €6,500,000 for any one claim or series of claims a; rising out of a single occurence Product Liability €6,500,000 for any one claim or series of claims a
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- The successful Tenderer shall be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €12,700,000 for any one claim or series of claims arising out of a single occurence Public Liability €6,500,000 for any one claim or series of claims a
- rising out of a single occurence Product Liability €6,500,000 for any one claim or series of claims a
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions (valued between €200,000 and €999,000 in the last three years preceding the declaration)
- 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
- For reporting of foreign financial contributions which are of a value between €200,000 and €999,000 in the last three (3) years preceding the declaration
- Appendix 3A: Schedule D – Declaration of non-notifiable foreign financial contributions (valued between €1,000,000 and €3,999,000 in the last three years preceding the declaration)
- 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration
- For reporting of foreign financial contributions which are of a value between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration, to include all non-notif
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2025-06-27T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2025-06-27T11:00:00+00:00 |
| Date surfaced in documents | 31 July 2014 |
| Date surfaced in documents | Directive 2014 |
| Date surfaced in documents | Directive 2006 |
8. Contract terms that matter
Contract duration in the extract: 2 year. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- The successful Tenderer shall be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €12,700,000 for any one claim or series of claims arising out of a single occurence Public Liability €6,500,000 for any one claim or series of claims a
- 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
- 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration
- NOW IT IS HEREBY AGREED in consideration of the sum of €2.00 (the receipt of which is hereby
- of the sum of €2.00 (the receipt of which is hereby
- etition (the “Goods Contract”) will be issued for a term of 12 months
- ontinues for 14 calendar days either Party may terminate at 14 days notice
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Document_Checklist_Pump_Station.pdf, RFT_Pump_Station_Control_Panel_Replacement_Blackstone.pdf, Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Appendix 3A: Schedule D – Declaration of non-notifiable foreign financial contributions, RFT document., RFT Appendix 2 –.
This tender has been awarded
- Campion Pumps · 03 Oct 2025
- Campion Pumps · 30 Sep 2025
Can you bid?
Required certifications
- EN 61643
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Documents (6)
Compliance_to_Specification_Pump_Station_Control_Panel_Replacement_Blackstone.docx
51.9 KB
Compliance_to_Specification_Pump_Station_Control_Panel_Replacement_Blackstone.pdf
574.8 KB
Document_Checklist_Pump_Station.docx
284.1 KB
Document_Checklist_Pump_Station.pdf
557.2 KB
RFT_Pump_Station_Control_Panel_Replacement_Blackstone.docx
179.5 KB
RFT_Pump_Station_Control_Panel_Replacement_Blackstone.pdf
1.2 MB
Original notice text
This tender involves the replacement of a pump station control panel in Blackstone, Co Wexford, requiring implementation and sustained service execution over a two-year contract period.
AI analysis updated 4 months ago
Value
€60k
Deadline
27 Jun
Location
Blackstone, Co Wexford, Ireland.
Procedure
Open
Clarification
16 Jun 2025
eTenders ID
5775443
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender