Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / St Michaels Unit Refurbishment, Mercy University Hospital
Closed Construction & Civil Engineering Works SME Suitable Open

St Michaels Unit Refurbishment, Mercy University Hospital

Deadline

27 Jun

Refurbishment of St Michaels Unit at Mercy University Hospital

SME fit: Medium Bid effort: Medium 📍 Cork

Refurbishment of St Michaels Unit at Mercy University Hospital

Bidder profile

Firms with experience in healthcare refurbishment projects and strong compliance with public procurement standards.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Mercy University Hospital
Title St Michaels Unit Refurbishment, Mercy University Hospital
CPV / category works / Construction & Civil Engineering
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location As per finishes schedule
Contract length not stated
Submission deadline 2025-06-27T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for St Michaels Unit Refurbishment, Mercy University Hospital. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Mercy University Hospital.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract:  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be;  Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event;  Maximum excess for Public liability: €10,00010 in respect of property damage only

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance
  • Public Liability — €6,500,0007
  • Professional Indemnity — €0.75m
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section:  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be;  Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event;  Maximum excess for Public liability: €10,00010 in respect of property damage only

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2025-06-27T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx, 4141-SMU-SP-OCM-AR-M50.pdf
  • eTenders CFT ID: not stated
  • Clarification contact / portal: eTenders clarification portal
  • Priority attachments: Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx, 4141-SMU-SP-OCM-AR-M50.pdf, 23613-VCE-ZZ-01-DR-E-01000.pdf

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€6,500,000

Professional indemnity insurance

€750,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (92)

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

37.8 KB · Form / Declaration / Certificate

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

26.0 KB · Form / Declaration / Certificate

DOCX

QW-Part-2-v1.1-18-11-2024.docx

58.6 KB · Form / Declaration / Certificate

PDF

23020 MAU St Michaels ITT 15.04.25.pdf

1.2 MB

PDF

23613-A3 Cover Sheet.pdf

239.6 KB

PDF

23613-VCE-XX-XX-RG-E-00001.pdf

261.1 KB

PDF

23613-VCE-XX-XX-RG-M-00001.pdf

345.2 KB

PDF

23613-VCE-XX-XX-SH-E-00001.pdf

397.0 KB

PDF

23613-VCE-XX-XX-SH-EBW-00001.pdf

557.8 KB

PDF

23613-VCE-ZZ-01-DR-E-01000.pdf

1.6 MB

PDF

23613-VCE-ZZ-01-DR-E-01001.pdf

1.3 MB

PDF

23613-VCE-ZZ-01-DR-E-01002.pdf

1.1 MB

PDF

23613-VCE-ZZ-01-DR-E-01003.pdf

1.4 MB

PDF

23613-VCE-ZZ-01-DR-M-01000.pdf

716.8 KB

PDF

23613-VCE-ZZ-01-DR-M-01001.pdf

534.6 KB

PDF

23613-VCE-ZZ-01-DR-M-01002.pdf

677.3 KB

PDF

23613-VCE-ZZ-01-DR-M-01003.pdf

864.8 KB

PDF

23613-VCE-ZZ-01-DR-M-01004.pdf

877.0 KB

PDF

23613-VCE-ZZ-01-DR-M-02000.pdf

582.5 KB

PDF

23613-VCE-ZZ-01-DR-M-02001.pdf

650.2 KB

PDF

23613-VCE-ZZ-01-DR-M-02002.pdf

664.7 KB

PDF

23613-VCE-ZZ-01-DR-M-02003.pdf

735.9 KB

PDF

23613-VCE-ZZ-01-DR-M-02004.pdf

918.3 KB

PDF

23613-VCE-ZZ-01-DR-M-02005.pdf

945.0 KB

PDF

23613-VCE-ZZ-01-DR-MEBW-01000.pdf

726.0 KB

PDF

23613-VCE-ZZ-01-DR-MEBW-01001.pdf

916.8 KB

PDF

23613-VCE-ZZ-06-DR-E-01004.pdf

539.8 KB

PDF

23613-VCE-ZZ-06-DR-M-02006.pdf

595.0 KB

PDF

23613-VCE-ZZ-ZZ-DR-E-01050.pdf

465.7 KB

PDF

4141-SMU-SP-OCM-AR-K10.pdf

126.9 KB

PDF

4141-SMU-SP-OCM-AR-K13.pdf

76.2 KB

PDF

4141-SMU-SP-OCM-AR-L10.pdf

66.0 KB

PDF

4141-SMU-SP-OCM-AR-L20.pdf

96.1 KB

PDF

4141-SMU-SP-OCM-AR-L40.pdf

77.8 KB

PDF

4141-SMU-SP-OCM-AR-M10.pdf

76.7 KB

PDF

4141-SMU-SP-OCM-AR-M50.pdf

98.2 KB

PDF

4141-SMU-SP-OCM-AR-M60.pdf

90.2 KB

PDF

4141-SMU-SP-OCM-AR-N10.pdf

101.0 KB

PDF

4141-SMU-SP-OCM-AR-N13.pdf

101.5 KB

PDF

4141-SMU-SP-OCM-AR-P20.pdf

72.0 KB

PDF

4141-SMU-SP-OCM-AR-P21.pdf

91.1 KB

PDF

4141-SMU-SP-OCM-AR-R11.pdf

67.9 KB

PDF

4141-SMU-SP-OCM-AR-Z22.pdf

60.0 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

31.3 KB · Appendix / Annex

PDF

DMC Volume A.1 General Requirements.pdf

1.0 MB

PDF

H1159-DR-GAR-SE-0106.pdf

598.0 KB

PDF

H1159-DR-GAR-SE-0107.pdf

1.6 MB

PDF

H1159-DR-GAR-SE-0301.pdf

307.8 KB

PDF

H1159-DR-GAR-SE-0500.pdf

415.2 KB

PDF

H1159-DR-GAR-SE-0510.pdf

332.4 KB

PDF

H1159-RG-GAR-SE-001.pdf

205.3 KB

PDF

H1159-SP-GAR-SE-0001.pdf

1.6 MB

PDF

MUH-RP-AR-OCM-1001-P1-S-0.pdf

26.0 MB

PDF

PR 2079 PSHP St Michaels Psychiatric Unit Refurb MUH.pdf

6.8 MB

PDF

SMU-IS-OCM-AR-2000-P8-S-0 - DOCUMENT REGISTER.pdf

81.4 KB

PDF

SMU-SH-OCM-AR-2000-P8-S-00 OUTLINE WORKS SCHEDULE.pdf

333.0 KB

PDF

SMU-SP-OCM-AR-0001-P8-S-0 Preliminary Specification.pdf

5.6 MB

PDF

SMU-Z-17-L01-DR-OCM-AR-1926-P8-S-0-LEVEL 01 - DEMOLITION PLAN.pdf

274.8 KB

PDF

SMU-Z-21-L01-DR-OCM-AR-1901-P8-S-0-LEVEL 01 - EXISTING BUILDING PLAN.pdf

429.8 KB

PDF

SMU-Z-30-L00-DR-OCM-AR-0430-P8-S-0-SITE PLAN.pdf

1.5 MB

PDF

SMU-Z-31-ZZZ-DR-OCM-AR-2400-P8-S-0-EXTERNAL ELEVATIONS - GENERAL ARRANGEMENT PLAN.pdf

635.6 KB

PDF

SMU-Z-31-ZZZ-DR-OCM-AR-2425-P8-S-0-EXTERNAL ELEVATION.pdf

389.2 KB

PDF

SMU-Z-32-L01-SH-OCM-AR-4590-P8-S-0 - IRONMONGERY SET SCHEDULE.pdf

140.7 KB

PDF

SMU-Z-32-ZZZ-DR-OCM-AR-5010-P8-S-0-INTERNAL DETAILS - PARTITION.pdf

192.4 KB

PDF

SMU-Z-32-ZZZ-DR-OCM-AR-5011-P8-S-0-INTERNAL DETAILS - PARTITION.pdf

143.6 KB

PDF

SMU-Z-32-ZZZ-DR-OCM-AR-5075-P8-S-0-INTERNAL DETAILS - PARTITION - SPECIAL BUFFER RAIL DETAIL.pdf

123.8 KB

PDF

SMU-Z-32-ZZZ-DR-OCM-AR-5300-P8-S-0-INTERNAL DETAILS - DOORS - JAMB-HEAD TIMBER FRAME DETAILS.pdf

185.6 KB

PDF

SMU-Z-32-ZZZ-SH-OCM-AR-4525-P8-S-0-SCHEDULES - INTERNAL DOOR.pdf

256.9 KB

PDF

SMU-Z-33-L01-DR-OCM-AR-1401-P8-S-0-LEVEL 01 - GENERAL ARRANGEMENT PLAN.pdf

346.6 KB

PDF

SMU-Z-33-L01-DR-OCM-AR-1426-P8-S-0-LEVEL 01 - GENERAL ARRANGEMENT PLAN - ZONE 1.pdf

448.6 KB

PDF

SMU-Z-33-L01-DR-OCM-AR-1427-P8-S-0-LEVEL 01 - GENERAL ARRANGEMENT PLAN - ZONE 2.pdf

443.7 KB

PDF

SMU-Z-33-L01-DR-OCM-AR-1428-P8-S-0-LEVEL 01 - GENERAL ARRANGEMENT PLAN - ZONE 3.pdf

257.7 KB

PDF

SMU-Z-33-L01-DR-OCM-AR-1930-P8-S-0-LEVEL 01 - PHASING PLAN.pdf

268.1 KB

PDF

SMU-Z-35-L01-DR-OCM-AR-7000-P8-S-0-EXISTING REFLECTED CEILING PLAN.pdf

167.7 KB

PDF

SMU-Z-35-L01-DR-OCM-AR-7001-P8-S-0-PROPOSED REFLECTED CEILING PLAN - ZONE 1.pdf

125.1 KB

PDF

SMU-Z-35-L01-DR-OCM-AR-7002-P8-S-0-PROPOSED REFLECTED CEILING PLAN - ZONE 2.pdf

143.6 KB

PDF

SMU-Z-35-L01-DR-OCM-AR-7003-P8-S-0-PROPOSED REFLECTED CEILING PLAN - ZONE 3.pdf

137.2 KB

PDF

SMU-Z-35-ZZZ-DR-OCM-AR-5201-P8-S-0-INTERNAL DETAILS - CEILING - TYPICAL DETAILS - INTERFACES.pdf

163.1 KB

PDF

SMU-Z-42-ZZZ-SH-OCM-AR-4100-P8-S-0-SCHEDULES - DOOR ELEVATION LEGEND (1).pdf

127.4 KB

PDF

SMU-Z-42-ZZZ-SH-OCM-AR-4101-P8-S-0-SCHEDULES - DOOR ELEVATION LEGEND (2).pdf

123.4 KB

PDF

SMU-Z-42-ZZZ-SH-OCM-AR-4200-P8-S-0-SCHEDULES - IPS ELEVATION LEGEND (1).pdf

127.4 KB

PDF

SMU-Z-42-ZZZ-SH-OCM-AR-4201-P8-S-0-SCHEDULES - IPS ELEVATION LEGEND (2).pdf

125.3 KB

PDF

SMU-Z-42-ZZZ-SH-OCM-AR-4600-P8-S-0-SCHEDULES - IPS.pdf

306.6 KB

PDF

SMU-Z-43-L01-DR-OCM-AR-1626-P8-S-0-LEVEL 01 - FLOOR FINISH LAYOUT.pdf

283.8 KB

PDF

SMU-Z-43-ZZZ-DR-OCM-AR-5520-P8-S-0-INTERNAL DETAILS - FLOOR - OUTLET DETAILS.pdf

150.5 KB

PDF

SMU-Z-74-ZZZ-SH-OCM-AR-4675-P8-S-0-SCHEDULES - SANITARYWARE.pdf

267.5 KB

PDF

SMU-Z-74-ZZZ-SH-OCM-AR-4676-P8-S-0-SCHEDULES - SANITARYWARE TOTALS.pdf

1.8 MB

PDF

SMU-Z-76-ZZZ-SH-OCM-AR-4625-P8-S-0-SCHEDULES - FITTED FURNITURE.pdf

261.5 KB

PDF

SMU-Z-Z-L01-RL-OCM-AR-6000-P8-S-0-ROOM LAYOUT SHEET - F1.13 OT ROOM.pdf

533.0 KB

PDF

SMU-Z-Z-ZZZ-DR-OCM-AR-2101-P1-S-1-EXISTING G.A. L00 AND L01.pdf

718.5 KB

PDF

Volume B FOT Tender & Schedule.pdf

1.4 MB

PDF

Volume C Pricing Document.pdf

2.1 MB

Original notice text

This tender involves the refurbishment of the St Michaels Unit at Mercy University Hospital, focusing on compliance with specifications and quality requirements.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

27 Jun

View on eTenders ↗

Location

As per finishes schedule

Procedure

Open

Clarification

18 Jun 2025

eTenders ID

5744677

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender