Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Army Equitation School, Stable Refurbishment, Blocks 1, 2 and 3, McKee Barracks, Dublin 7
Awarded Construction & Civil Engineering Works Open

Army Equitation School, Stable Refurbishment, Blocks 1, 2 and 3, McKee Barracks, Dublin 7

Value

€1

Deadline

13 Jun

Refurbishment of stables at Army Equitation School in Dublin over 10 years

SME fit: Medium Bid effort: Medium 📍 Dublin

Refurbishment of stables at Army Equitation School in Dublin over 10 years

Bidder profile

Mid-sized to large construction firms with experience in public sector projects and compliance with safety standards.

Risks & flags

  • Qualification gate
  • Undisclosed contract value
  • Two-step process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Department of Defence
Title Army Equitation School, Stable Refurbishment, Blocks 1, 2 and 3, McKee Barracks, Dublin 7
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 10 years
Submission deadline 2025-06-13T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Department of Defence ran this procurement for “Army Equitation School, Stable Refurbishment, Blocks 1, 2 and 3, McKee Barracks, Dublin 7” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • CA SUPPLEMENTARY REQUIREMENTS: The minimum requirement is that the tenderer has had at least 5 persons employed in a full time capacity delivering construction services on-site in each of the 3 years preceding the closing date for tender receipt
  • Steel Supports to timber double Doors
  • Provide for supply and replacement of all rotted
  • Supply and fit new galvanised steel door trim.
  • Allow for shall supply and fix new 175mm larch
  • matting). Supply and fit 35mm wall capping strip
  • Supply and install internal timber stable,
  • Supply and install rubber wall matting, (to inside
  • Supply and install new floor resin covering, (to
  • Tenderer Specialist (Applicable to PW-CF2 or PW-CF4 where the Tenderer is required to propose Specialists to be named in the Contract). An entity proposed by the Tenderer to undertake specialist areas of works or services described in Section 2.6.1 of the Project Particulars. Note: a Tenderer Specialist may be the Tenderer itself (or an any member of an Tenderer), or a subcontractor to the Tenderer. Tenderer Specialists must always complete the relevant Specialist Questionnaires issued by the Contracting Authority with this Questionnaire.
  • International Procurement Instrument (IPI) Regulation (EU) 2022/1031 of the European Parliament and of the Council of 23 June 2022 on the access of third-country economic operators, goods and services to the Union’s public procurement and concession markets and procedures supporting negotiations on access of Union economic operators, goods and services to the public procurement and concession markets of third countries (International Procurement Instrument – “IPI”). Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Carefully remove existing external windows in
  • bolted in a similar manner to the existing quarter
  • steel, in similar style and shape to existing.
  • Splicing new timber into existing door and

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ofessional Indemnity Insurance required for € [17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Construction Work [15] € 1.5 million CA SUPPLEMENTARY REQUIREMENTS: W
  • ofessional Indemnity Insurance required for € [17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
  • CA SUPPLEMENTARY REQUIREMENTS The minimum standard is proof that the contractor has public liability insurance cover for €6,500,000 in place for any one event
  • Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[20] Entitles issuing

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
ofessional Indemnity Insurance required for € [17] The exces 2% not stated not stated
e in any one claim below which the will bear the cost is the greater amount of 2 2% not stated not stated
cover providing an indemnity of not less than the total contract amount plus a m 30% not stated not stated
VAT at 13.5% on € _____________ {Price at ‘X’ less amount liable at 23% VAT and 13.5% not stated not stated
VAT at 13.5% on € _____________ {Price at ‘X’ less amount liable at 23% VAT and 13.5% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
  • [Volume C - Pricing Doc.pdf] VOLUME C
  • [Volume C - Pricing Doc.pdf] Total Tender Amount)
  • [Volume C - Pricing Doc.pdf] CONTRACTOR.
  • [Volume C - Pricing Doc.pdf] = 05 number.

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-06-13T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-06-13T11:00:00+00:00
Date surfaced in documents 18 November 2024
Date surfaced in documents 1 January 2025
Date surfaced in documents 14 December 2022

8. Contract terms that matter

Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • The minimum standard is the person proposed to fulfil this role must have at least 5 years' experience in the Building Trade and must have either a Degree/Diploma or other equivalent H&S training or must have at least 3 years acting in the capacity of Health and Safety Manager on b
  • The minimum standard is that the person proposed to fulfil this role must have at least 5 years’ experience in the Building Trade and must have either a Degree/diploma or other equivalent H&S training or must have at least 3 years acting in the capacity of Site Safety Officer on buildin
  • Trade and must have either a Degree/diploma or other equivalent H&S training or must have at least 3 years acting in the capacity of Site Safety Officer on building construction projects
  • CA SUPPLEMENTARY REQUIREMENTS: The minimum requirement is that the tenderer has had at least 5 persons employed in a full time capacity delivering construction services on-site in each of the 3 years preceding the closing date for tender receipt
  • e Tenderer’s current principal banker dated within the past 3 months stating the duration of the relationshi
  • cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap
  • below, payment of the excess amount shall be the responsibility of the Contractor.

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Volume C - Pricing Doc.pdf, QW 2 Part 1_Eq Sch Stables.docx, Public Works Contract for Building Works

[QW 2 Part 1_Eq Sch Stables.docx.

  • eTenders CFT / notice reference: OJEU Official Journal of the European Union. .
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: SCHEDULE OF TENDER ITEMS CARRYING 23% VAT LIABILITY, schedule (PDE, schedule and drawings)..

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€1,500,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (13)

DOCX

3.4.1-HS-Works-Contractor.docx

46.5 KB

DOCX

3.4.2-HS-PSCS.docx

42.6 KB

PDF

42731 Equitation School McKee Bks Compiled Report.pdf

5.3 MB

OTHER

downloadzip.log

81 bytes

PDF

Information Pack.pdf

716.0 KB

PDF

ITT Stable Refurb McKee.pdf

930.2 KB

PDF

ITTW4 Invitation to Tender Letter.pdf

193.9 KB

DOCX

QW 2 Part 1_Eq Sch Stables.docx

189.8 KB

DOCX

QW2-Part 2_Eq Sch Stables.docx

73.0 KB

PDF

Schedule of Insurance Requirements.pdf

121.0 KB

PDF

Vol A Works Requirements.pdf

767.9 KB

PDF

Volume B - Form of Tender.pdf

1.2 MB

PDF

Volume C - Pricing Doc.pdf

533.5 KB

Original notice text

This tender involves the refurbishment of stables at the Army Equitation School, including structural repairs, installation of new materials, and compliance with operational standards over a 10-year contract.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€1

Deadline

13 Jun

View on eTenders ↗

Location

McKee Barracks, Dublin 7, Ireland

Procedure

Open

Clarification

03 Jun 2025

eTenders ID

5655361

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender