Construction of 2 No Semi-Detached Units at Lisroyne Strokestown
Value
€250k
Deadline
13 Jun
13 Jun 2025
Value
€250k
Deadline
13 Jun
Construction of two semi-detached units in Strokestown, Roscommon.
Construction of two semi-detached units in Strokestown, Roscommon.
Bidder profile
Mid-sized to large construction firms with experience in public sector projects and compliance with quality assurance standards.
Risks & flags
- Turnover threshold
- Two-step tender process
- Compliance documentation requirements
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Roscommon County Council_424 |
| Title | CONSTRUCTION OF 2 NO SEMI-DETACHED UNITS AT LISROYNE STROKESTOWN |
| CPV / category | works |
| Estimated value | 250000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 12 month |
| Submission deadline | 2025-06-13T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Roscommon County Council_424 ran this procurement for “CONSTRUCTION OF 2 NO SEMI-DETACHED UNITS AT LISROYNE STROKESTOWN” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- [Instructions to Tenderers.docx] It will be a condition of the award of the Contract that the successful Tenderer shall, for the term of the Contract, comply with all applicable EU and domestic tax laws. Prior to the award of the Contract arising out of this Competition the successful Tenderer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by the Contracting Authority. By supplying these numbers the successful Tenderer acknowledges and agrees that the Contracting Authority has the permission of the successful Tenderer to verify its tax cleared position online.
- Tenderers must not make any assumptions that the Contracting Authority has prior knowledge of their organisation or service provision. Tenderers will only be evaluated on the information contained in their Tender (as may be clarified in accordance with these Instructions).
- 2 These documents may include (but are not limited to) any of the following: drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or working hours, statutory consents and conditions attached thereto.
- [Instructions to Tenderers.docx] * the Contracting Authority’s third party service providers, such as financial, legal and technical advisors; and
- [Instructions to Tenderers.docx] Where the Particulars state that the required means of tender delivery is electronic submission to the eTenders platform, Tenderers are advised to ensure that they give sufficient time to allow for the successful upload of all Tender documents and that they have a reliable, continual connection speed available for this purpose. Tenderers should ensure that their operating system has sufficient capacity to execute the upload of all the documents included in the Tender submission before the deadline stated in the Particulars. The timely and complete upload of documents is the responsibility of each Tenderer. All files submitted electronically must be capable of being readily viewed in their entirety by the means stated in the Particulars. It is the responsibility of the Tenderer to ensure that electronic documents submitted are not corrupt. Tenderers are advised to consult etenders.gov.ie for information on uploading electronic submissions.
- drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or working hours, statutory consents and conditions attached thereto.
- Where the Particulars state that the required means of tender delivery is electronic submission (including to the eTenders platform), Candidates must submit a read only PDF copy of the pricing document with their Tender. In accordance with section 9.2 of these Instructions, the Contracting Authority may request that Tenderers provide a copy of the submitted pricing document (as appropriate) in its native file and/or .csv file format. Where requested, Tenders must provide the pricing document in the requested file formats promptly and within the stated timeframe. In the event of inconsistencies between the submitted read only PDF pricing document and either the native file format and/or csv file format, the read only PDF pricing document shall take precedence.
- If the pricing document (where provided) includes a schedule of items that are not construction operations subject to Relevant Contracts Tax (and therefore to reverse-charge VAT), and, in the Contracting Authority’s opinion, the categorisation of an item, the VAT rate stated, or the value stated is not correct, the Contracting Authority may invoke Section 6.2 of these Instructions.. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- ll combined programme for the completion of this project is 11 Months in a single phase
- 2 These documents may include (but are not limited to) any of the following: drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or working hours, statutory consents and conditions attached thereto.
- If the Tenderer is unsuccessful as part of the Tender process, such personal data will be retained until three years after the conclusion of the Tender process or the award of the Contract to the successful Tenderer, whichever is later. If the Tenderer is successful, and a Contract is awarded to the Tenderer at the end of the Tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Contracting Authority upon request.
- drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or working hours, statutory consents and conditions attached thereto.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m); * The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
- Certifications — not specified for this tender
- Past experience — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Refurbishment and New Build Projects[17] € 1,000,000 Combined total turnover for all membe; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Refurbishment and New Build Projects[17] € 1,000,000 Combined total turnover for all membe
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
-
- The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[21] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
- Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[22] Entitles issuing
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|
- The excess as stated here: Maximum permissible excess on Profess 2% not stated not stated | e in any one claim below which the will bear the cost is the greater amount of 2 | 2% | not stated | not stated | | If any Bill of Quantities includes an item described as an 'adjustment item', th | 5% | not stated | not stated | The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- procedure may be used for all values of works contracts but must be used for works contracts with a value of less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
- This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a Certifi
- or shall submit to the ER a progress report, not later than 7 days before the end of each
- The Contracting Authority has sent a contract notice for the Works to eTenders.1
- These documents set out the suitability assessment criteria, the award criterion and the evaluation and award process which will be followed by the Contracting Authority in making the assessment of which Tender is the lowest price. The documents also set out the information which must be supplied by Tenderers. Tenders must be submitted in accordance with these Instructions. Any Tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
-
- the completed pricing document3 (Volume C) [where required]
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2025-06-13T15:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2025-06-13T15:00:00+00:00 |
| Date surfaced in documents | 01 August 2023 |
| Date surfaced in documents | 25 May 2018 |
| Date surfaced in documents | Natura 2000 |
8. Contract terms that matter
Contract duration in the extract: 12 month. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- must produce a tax reference number where payments exceed €650. Records of tax reference numbers
- Where payments exceed €2,500 in any 12 month period the Sub-Contractor will be required
- CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
- The liability of the Surety under this Bond will not exceed € . This amount will be reduced by half on issue of the Certificate of Substantial
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
- the same terms as the insurances the Contractor is required to have under clause 10
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Instructions to Tenderers.docx, Appendix B1 List of Previous Works projects for which there is a Certifi, ITT).
- eTenders CFT / notice reference: contract notice for the Works to eTenders.1.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ITT**, ITT-W4 v1.5**, ITT-W4 V1.5 01 August 2023.
This tender has been awarded
- Axe Forestry ltd T/A AF Contracts · 03 Sep 2025
- Axe Forestry ltd T/A AF Contracts · 02 Sep 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€1,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,500,000
Scoring
Lowest Price
Lowest Price
Lots (1)
Construction of two residential units and associated site works in Lisroyne, Strokestown.
Documents (38)
Instructions to Tenderers.docx
363.8 KB · RFT / Invitation to Tender
3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx
51.8 KB · Contract / Agreement / Terms
2375-QW-Part-2-v1.0-28-07-2023-2.docx
66.3 KB · Form / Declaration / Certificate
2375-QW2-Part-1-v2.0-28-07-2023-1.docx
190.2 KB · Form / Declaration / Certificate
3.4.2-HS-PSCS-v3.0-28-07-2023.docx
47.7 KB · Form / Declaration / Certificate
AA Screening report mc Rev 01.pdf
6.4 MB
Appendix-A-.docx
28.9 KB · Appendix / Annex
Appendix-B1.docx
33.2 KB · Appendix / Annex
Appendix-B3.docx
36.6 KB · Appendix / Annex
Appendix-C-.docx
30.1 KB · Appendix / Annex
Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx
36.6 KB · Appendix / Annex
Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx
29.1 KB · Appendix / Annex
BER Summary Report -Lisroyne.pdf
473.8 KB
Drawing-Issue-Sheet.pdf
131.4 KB
Ground Investigation Report.pdf
13.9 MB
L00-DR-TA-CE-0001.pdf
13.2 MB
L00-DR-TAG-AR-0001.pdf
1.1 MB
L00-DR-TAG-AR-0002.pdf
2.8 MB
L00-DR-TAG-AR-0003.pdf
2.2 MB
L00-DR-TAG-AR-1001.pdf
3.2 MB
L00-DR-TAG-AR-1002.pdf
1.3 MB
L00-DR-TAG-AR-1003.pdf
1.4 MB
L00-DR-TAG-AR-1007.pdf
2.1 MB
L00-DR-TAG-AR-1009.pdf
2.2 MB
L00-DR-TAG-AR-1010.pdf
3.0 MB
L00-DR-TAG-AR-2001.pdf
3.6 MB
L00-DR-TAG-AR-2005.pdf
2.0 MB
L00-DR-TAG-AR-3001.pdf
2.3 MB
L00-DR-TAG-AR-4001.pdf
1.5 MB
L00-DR-TAG-AR-5001.pdf
1.5 MB
L00-DR-TAG-AR-6001.pdf
1.4 MB
L00-DR-TAG-AR-6003.pdf
1.4 MB
MF-1.21-Performance Bond (PW-CF6).docx
70.2 KB
MF-1.22-PSCS.docx
38.7 KB
MF-1.23-Rates of Pay.docx
38.1 KB
PW-CF6-v1.14-19-07-2023.pdf
612.0 KB
Volume A - Works Requirements.pdf
425.1 KB
XXX-SP-TAG-AR-9700.pdf
305.3 KB
Original notice text
This tender involves the construction of two semi-detached residential units at Lisroyne, Strokestown, with a contract duration of 12 months.
AI analysis updated 4 months ago
Value
€250k
Deadline
13 Jun
Buyer
Roscommon County CouncilLocation
Construction site located at Lisroyne, Strokestown, Ireland.
Procedure
Open
Clarification
23 May 2025
eTenders ID
5649621
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender