Dungloe Weirs, Co. Donegal
Value
€150k
Deadline
23 May
23 May 2025
Value
€150k
Deadline
23 May
Construction of Dungloe Weirs in County Donegal over 2 months
Construction of Dungloe Weirs in County Donegal over 2 months
Bidder profile
Firms with experience in civil engineering projects, particularly in environmental compliance and fishery management.
Risks & flags
- Qualification gate
- Turnover threshold
- Technical ambiguity
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Inland Fisheries Ireland |
| Title | Dungloe Weirs, Co. Donegal |
| CPV / category | works |
| Estimated value | 150000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | N 54.9991, W -8.06727 |
| Contract length | 2 months |
| Submission deadline | 2025-05-23T16:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Inland Fisheries Ireland ran this procurement for “Dungloe Weirs, Co. Donegal” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
- 2000 protected sites without the effective implementation of mitigation measures to
- A site visit and other supporting work for the completion of this AA Screening and NIS
- for a comparative study with other systems which may be impacted by fish farming
- passes. This will maintain a fixed upstream water level allowing for fish migration over a
- wider range of flow conditions. As this system's wetted area is comprised mainly of lakes
- comparative study with other systems which may be impacted by fish farming operation
- This will maintain a fixed upstream water level allowing for fish migration over a wider
- range of flow conditions. As this system's wetted area is comprised mainly of lakes and
- site synopsis reports available from the National Parks and Wildlife Services website www.npws.ie
- b) The specific structure and functions which are necessary for its long-term maintenance Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- town boundary. It is also proposed to replace the remain of existing old manual sluice
- objectives, will adversely affect the integrity of Natura 2000 sites. This Appropriate
- counter and replacement of an existing weir structures with two ‘crump’ weirs and fish
- operation issues. It is also proposed to remove existing manually operated sluices
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 300,000[17] €300,000 for each and every claim with a annual aggregate cover of €400,000 The excess as stated here: ; Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[15] € 500,000 CA SUPPLEMENTARY REQUIREMENTS: Cl
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[15] € 500,000 CA SUPPLEMENTARY REQUIREMENTS: Cl
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 300,000[17] €300,000 for each and every claim with a annual aggregate cover of €400,000 The excess as stated here:
- Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
- Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[20] Entitles issuing
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Maximum permissible excess on Professional Indemnity Insurance in any one clai 2% not stated not stated | |||
| e in any one claim below which the will bear the cost is the greater amount of 2 | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- The Contractor shall submit to the Employer’s Representative, a minimum of 10 working
- [NBMP_0865001.02.01.004_NIS.pdf] irs and fish pass on the Dungloe River just off the N56 within the Dungloe
- required to submit a Natura Impact Statement (NIS).”
- [NBMP_0865001.02.01.004_NIS.pdf] incorporated into works. The
- A site visit and other supporting work for the completion of this AA Screening and NIS
- [NBMP_0865001.02.01.004_NIS.pdf] Dungloe River works AA.
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2025-05-23T16:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2025-05-23T16:00:00+00:00 |
| Date surfaced in documents | 25 April 2023 |
| Date surfaced in documents | 40 Natura 2000 |
| Date surfaced in documents | 18 November 2024 |
8. Contract terms that matter
Contract duration in the extract: 2 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Minimum amount for interim payments, except release of retention, € 0.00 [14]
- Minimum amount for interim payments, except release of retention, €
- Minimum amount for interim payments, except release of retention, € 0
- Within 3 months after receipt of the Contractor’s final statement,
- Within 3 months after receipt of the Contractor’s final statement, the Employer’s
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
- e Tenderer’s current principal banker dated within the past 3 months
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: NBMP_0865001.02.01.004_NIS.pdf, QW2-Part-1-v2.1-18-11-2024-09-01-2025.docx, ITT-W2-v3.0-18-11-24-23-01-25.docx.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Schedule and, Appendix 2 of this report., ITT-W2-v3.0-18-11-24-23-01-25.docx] Not applicable.
This tender has been awarded
- Ward piling ltd · 24 Sep 2025
- ward piling ltd · 01 Jul 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€500,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€300,000
Scoring
Lowest Price
Documents (14)
FTS-4-v2.6-09-01-2025.docx
105.5 KB
ITT-W2-v3.0-18-11-24-23-01-25.docx
74.6 KB
NBMP_0865001.02.01.001_VolA_Part 1a Spec.pdf
1.2 MB
NBMP_0865001.02.01.002_VolA_Part 1b Spec.pdf
619.5 KB
NBMP_0865001.02.01.003_Pricing Document.xlsx
41.0 KB
NBMP_0865001.02.01.004_NIS.pdf
3.1 MB
NBMP_0865001.02.01.005_Tender Response.docx
429.8 KB
PW-CF4-v2.7-01-05-2024.pdf
1.3 MB
QW-Part-2-v1.1-18-11-2024.docx
65.3 KB
QW2-Part-1-v2.1-18-11-2024-09-01-2025.docx
202.3 KB
Site1_D230507_P1_10_Existing Weir Layout, Site Layout, Site Location, Methodology.pdf
467.1 KB
Site1_D230507_P1_11_Proposed Weir Layout, plan, Sections and Images.pdf
882.1 KB
Site2_D230507_P1_12_Site Layout & Site Location Existing & Proposed Layouts.pdf
1.2 MB
Site3_D230507_P1_13_Site Layout & Site Location Existing & Proposed Layouts.pdf
1018.1 KB
Original notice text
This tender involves the construction of new weirs on the Dungloe River, including the replacement of existing sluice structures to facilitate fish migration and maintain upstream water levels.
AI analysis updated 4 months ago
Value
€150k
Deadline
23 May
Buyer
Inland Fisheries IrelandLocation
Dungloe River, Co. Donegal
Procedure
Open
Clarification
19 May 2025
eTenders ID
5521121
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender