MEATH CO CO–MH–TRA-25-06 – R147 MARTHA’S BRIDGE TO CIRCULAR ROAD CYCLE/PEDESTRIAN SCHEME
Deadline
21 May
21 May 2025
Deadline
21 May
Cycle/pedestrian scheme from Martha's Bridge to Circular Road in Meath.
Cycle/pedestrian scheme from Martha's Bridge to Circular Road in Meath.
Bidder profile
Firms with experience in public sector tenders and operational capabilities in civil engineering projects.
Risks & flags
- Undisclosed contract value
- Ambiguity in eligibility criteria
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Meath County Council |
| Title | MEATH CO CO–MH–TRA-25-06 – R147 MARTHA’S BRIDGE TO CIRCULAR ROAD CYCLE/PEDESTRIAN SCHEME |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 12 months |
| Submission deadline | 2025-05-21T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Meath County Council ran this procurement for “MEATH CO CO–MH–TRA-25-06 – R147 MARTHA’S BRIDGE TO CIRCULAR ROAD CYCLE/PEDESTRIAN SCHEME” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- € 0400 Road Restraint Systems (Vehicle and Pedestrian)
- within the TII Publications system. The Bill of Quantities has
- The supply of materials, goods, storage and costs
- supplying results of tests carried out by the
- Supply and delivery of samples to the Employer’s
- Preparation and supply of detailed working
- existing services and mains is believed to be correct but the
- and prices for locating and taking measures for the support and
- appropriate authority to interrupt the service or supply and for
- services or supplies, Statutory Undertakers and Public
- offered to the client for maintenance stock with rejected
- for maintenance stock with rejected materials to be removed to Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- or down and remove to tip off site existing inspection chamber cover and frame
- Connection to existing chamber as indicated on the 0500 Series Drawings
- TO BE CONNECTED TO PL CHAMBER EXISTING PUBLIC LIGHTING DUCTING
- TO PL CHAMBER EXISTING PUBLIC LIGHTING DUCTING
4. Eligibility & selection criteria
- Turnover requirement — not specified for this tender
- Insurance — not specified for this tender
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- in Appendix 30/1 for this contract during the works and for 12 months post substantial completion of the sche
- [MB2CR Vol C - T1.pdf] R147 Martha's Bridge to Circular
- Atkins 5212234DG0109 rev 4 - MC - Pricing (Vol C)
- [MB2CR Vol C - T1.pdf] 4DG0109 4 April 2025
- Amendments to the Requirements for Measuring and Pricing (RMP)
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2025-05-21T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2025-05-21T11:00:00+00:00 |
| Date surfaced in documents | April 2025 |
| Date surfaced in documents | Feb 2025 |
| Date surfaced in documents | Mar 2025 |
8. Contract terms that matter
Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- € 2700 Watermains, Utilities and Accommodation Works
- or down and remove to tip off site existing inspection chamber cover and frame
- description and shall reflect the quantity set against that item.
- the term "included", or the insertion of a dash in the "rate" column shall result in the Employer’s
- resulting in a disproportionate payment schedule through front loading or otherwise is prohibited. Such
- where an error is made in the extension of the rate and quantity against any item, the following
- Where errors have been made in the extension of the rate and quantity, the rate shall be adjusted to
9. Risks, red flags & unusuals
- Numeric qualification gates were only partially visible, so eligibility certainty required full pack review.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — specialist operator with compliant procurement governance and evidencable experience.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: MB2CR Vol C - T1.pdf, 5212234_HTR_DR_1707_STAT_T_REV_A.pdf, 5212234_HTR_DR_0582_STAT_T_REV_A.pdf.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: 5212234DI0020 - Tree Survey Report.docx, Appendix 30/1 for this contract during the works and for 12 months post substantial comp, schedule through front loading or otherwise is prohibited. Such.
This tender has been awarded
- Glas Civil Engineering Ltd · 26 Nov 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€5,000,000
Scoring
Most Economically Advantageous Tender
Documents (383)
21082-DD-LD-0-01-REV-0-PROPOSED SECTIONS.pdf
436.5 KB
21082-DD-LD-0-03-REV-0-PLINTH DETAIL.pdf
116.4 KB
21082-DD-LN-0-01-REV-0-HARD LANDSCAPE NOTES AND LEGENDS.pdf
159.3 KB
21082-DD-LN-0-02-REV-0-PLANTING PLAN NOTES, LEGENDS AND SCHEDULES.pdf
201.2 KB
21082-DD-LP-0-00-REV-0-KEY PLAN.pdf
751.8 KB
21082-DD-LP-0-01-REV-0-HARD LANDSCAPE PLAN 1 OF 5.pdf
300.1 KB
21082-DD-LP-0-02-REV-0-HARD LANDSCAPE PLAN 2 OF 5.pdf
252.8 KB
21082-DD-LP-0-03-REV-0-HARD LANDSCAPE PLAN 3 OF 5.pdf
169.7 KB
21082-DD-LP-0-04-REV-0-HARD LANDSCAPE PLAN 4 OF 5.pdf
210.7 KB
21082-DD-LP-0-05-REV-0-HARD LANDSCAPE PLAN 5 OF 5.pdf
197.2 KB
21082-DD-LP-1-01-REV-0-DEMOLITION PLAN 1 OF 2.pdf
156.9 KB
21082-DD-LP-1-02-REV-0-DEMOLITION PLAN 2 OF 2.pdf
176.8 KB
21082-DD-LP-2-01-REV-0-INDICATIVE LEVELS 1 OF 2.pdf
166.9 KB
21082-DD-LP-2-02-REV-0-INDICATIVE LEVELS 2 OF 2.pdf
168.6 KB
21082-DD-PP-0-01-REV-0-PLANTING PLAN 1 OF 5.pdf
262.1 KB
21082-DD-PP-0-02-REV-0-PLANTING PLAN 2 OF 5.pdf
274.6 KB
21082-DD-PP-0-03-REV-0-PLANTING PLAN 3 OF 5.pdf
144.7 KB
21082-DD-PP-0-04-REV-0-PLANTING PLAN 4 OF 5.pdf
141.2 KB
21082-DD-PP-0-05-REV-0-PLANTING PLAN 5 OF 5.pdf
228.0 KB
23-1268 R147 Martha's Bridge to Circular Rd A00.pdf
71.4 MB
5212234_HTR_DR_0000_STAT_T_REV_-.pdf
114.5 KB
5212234_HTR_DR_0000_STAT_T_REV_A.pdf
115.2 KB
5212234_HTR_DR_0001_STAT_T_REV_-.pdf
115.0 KB
5212234_HTR_DR_0001_STAT_T_REV_A.pdf
123.2 KB
5212234_HTR_DR_0001_STAT_T_REV_B.pdf
115.4 KB
5212234_HTR_DR_0002_STAT_T_REV_-.pdf
5.7 MB
5212234_HTR_DR_0002_STAT_T_REV_A.pdf
5.7 MB
5212234_HTR_DR_0101_STAT_T_REV_-.pdf
2.3 MB
5212234_HTR_DR_0101_STAT_T_REV_A.pdf
2.3 MB
5212234_HTR_DR_0102_STAT_T_REV_-.pdf
2.3 MB
5212234_HTR_DR_0102_STAT_T_REV_A.pdf
2.3 MB
5212234_HTR_DR_0103_STAT_T_REV_-.pdf
2.5 MB
5212234_HTR_DR_0103_STAT_T_REV_A.pdf
2.5 MB
5212234_HTR_DR_0104_STAT_T_REV_-.pdf
2.5 MB
5212234_HTR_DR_0104_STAT_T_REV_A.pdf
2.5 MB
5212234_HTR_DR_0105_STAT_T_REV_-.pdf
2.3 MB
5212234_HTR_DR_0105_STAT_T_REV_A.pdf
3.2 MB
5212234_HTR_DR_0106_STAT_T_REV_-.pdf
4.5 MB
5212234_HTR_DR_0106_STAT_T_REV_A.pdf
4.4 MB
5212234_HTR_DR_0107_STAT_T_REV_-.pdf
3.8 MB
5212234_HTR_DR_0107_STAT_T_REV_A.pdf
3.9 MB
5212234_HTR_DR_0108_STAT_T_REV_-.pdf
2.7 MB
5212234_HTR_DR_0108_STAT_T_REV_A.pdf
3.6 MB
5212234_HTR_DR_0109_STAT_T_REV_-.pdf
3.9 MB
5212234_HTR_DR_0109_STAT_T_REV_A.pdf
3.9 MB
5212234_HTR_DR_0110_STAT_T_REV_-.pdf
3.4 MB
5212234_HTR_DR_0110_STAT_T_REV_A.pdf
3.4 MB
5212234_HTR_DR_0133_STAT_T_REV_-.pdf
216.9 KB
5212234_HTR_DR_0134_STAT_T_REV_-.pdf
161.3 KB
5212234_HTR_DR_0135_STAT_T_REV_-.pdf
156.5 KB
5212234_HTR_DR_0136_STAT_T_REV_-.pdf
161.1 KB
5212234_HTR_DR_0137_STAT_T_REV_-.pdf
162.7 KB
5212234_HTR_DR_0138_STAT_T_REV_-.pdf
162.7 KB
5212234_HTR_DR_0139_STAT_T_REV_-.pdf
164.9 KB
5212234_HTR_DR_0140_STAT_T_REV_-.pdf
161.0 KB
5212234_HTR_DR_0141_STAT_T_REV_-.pdf
167.2 KB
5212234_HTR_DR_0142_STAT_T_REV_-.pdf
153.2 KB
5212234_HTR_DR_0143_STAT_T_REV_-.pdf
597.6 KB
5212234_HTR_DR_0144_STAT_T_REV_-.pdf
551.1 KB
5212234_HTR_DR_0201_STAT_T_REV_-.pdf
604.7 KB
5212234_HTR_DR_0201_STAT_T_REV_A.pdf
607.9 KB
5212234_HTR_DR_0202_STAT_T_REV_-.pdf
661.3 KB
5212234_HTR_DR_0202_STAT_T_REV_A.pdf
662.7 KB
5212234_HTR_DR_0203_STAT_T_REV_-.pdf
629.5 KB
5212234_HTR_DR_0203_STAT_T_REV_A.pdf
630.8 KB
5212234_HTR_DR_0204_STAT_T_REV_-.pdf
647.0 KB
5212234_HTR_DR_0204_STAT_T_REV_A.pdf
648.3 KB
5212234_HTR_DR_0205_STAT_T_REV_-.pdf
770.1 KB
5212234_HTR_DR_0205_STAT_T_REV_A.pdf
771.4 KB
5212234_HTR_DR_0206_STAT_T_REV_-.pdf
940.7 KB
5212234_HTR_DR_0206_STAT_T_REV_A.pdf
934.4 KB
5212234_HTR_DR_0207_STAT_T_REV_-.pdf
741.8 KB
5212234_HTR_DR_0207_STAT_T_REV_A.pdf
743.0 KB
5212234_HTR_DR_0208_STAT_T_REV_-.pdf
706.1 KB
5212234_HTR_DR_0208_STAT_T_REV_A.pdf
707.4 KB
5212234_HTR_DR_0209_STAT_T_REV_-.pdf
1.3 MB
5212234_HTR_DR_0209_STAT_T_REV_A.pdf
1.3 MB
5212234_HTR_DR_0210_STAT_T_REV_-.pdf
1.0 MB
5212234_HTR_DR_0210_STAT_T_REV_A.pdf
1.0 MB
5212234_HTR_DR_0301_STAT_T_REV_-.pdf
523.8 KB
5212234_HTR_DR_0301_STAT_T_REV_A.pdf
530.4 KB
5212234_HTR_DR_0302_STAT_T_REV_-.pdf
463.2 KB
5212234_HTR_DR_0302_STAT_T_REV_A.pdf
472.4 KB
5212234_HTR_DR_0303_STAT_T_REV_-.pdf
458.5 KB
5212234_HTR_DR_0303_STAT_T_REV_A.pdf
469.0 KB
5212234_HTR_DR_0304_STAT_T_REV_-.pdf
471.8 KB
5212234_HTR_DR_0304_STAT_T_REV_A.pdf
479.5 KB
5212234_HTR_DR_0305_STAT_T_REV_-.pdf
513.5 KB
5212234_HTR_DR_0305_STAT_T_REV_A.pdf
520.0 KB
5212234_HTR_DR_0306_STAT_T_REV_-.pdf
554.3 KB
5212234_HTR_DR_0306_STAT_T_REV_A.pdf
561.4 KB
5212234_HTR_DR_0307_STAT_T_REV_-.pdf
530.9 KB
5212234_HTR_DR_0307_STAT_T_REV_A.pdf
536.7 KB
5212234_HTR_DR_0308_STAT_T_REV_-.pdf
515.7 KB
5212234_HTR_DR_0308_STAT_T_REV_A.pdf
521.2 KB
5212234_HTR_DR_0309_STAT_T_REV_-.pdf
566.3 KB
5212234_HTR_DR_0309_STAT_T_REV_A.pdf
570.8 KB
5212234_HTR_DR_0310_STAT_T_REV_-.pdf
584.2 KB
5212234_HTR_DR_0310_STAT_T_REV_A.pdf
589.2 KB
5212234_HTR_DR_0501_STAT_T_REV_-.pdf
503.2 KB
5212234_HTR_DR_0501_STAT_T_REV_A.pdf
516.4 KB
5212234_HTR_DR_0502_STAT_T_REV_-.pdf
446.3 KB
5212234_HTR_DR_0502_STAT_T_REV_A.pdf
465.2 KB
5212234_HTR_DR_0503_STAT_T_REV_-.pdf
443.0 KB
5212234_HTR_DR_0503_STAT_T_REV_A.pdf
461.3 KB
5212234_HTR_DR_0504_STAT_T_REV_-.pdf
460.2 KB
5212234_HTR_DR_0504_STAT_T_REV_A.pdf
475.9 KB
5212234_HTR_DR_0505_STAT_T_REV_-.pdf
526.8 KB
5212234_HTR_DR_0505_STAT_T_REV_A.pdf
539.6 KB
5212234_HTR_DR_0506_STAT_T_REV_-.pdf
605.7 KB
5212234_HTR_DR_0506_STAT_T_REV_A.pdf
633.3 KB
5212234_HTR_DR_0507_STAT_T_REV_-.pdf
556.8 KB
5212234_HTR_DR_0507_STAT_T_REV_A.pdf
572.8 KB
5212234_HTR_DR_0508_STAT_T_REV_-.pdf
516.5 KB
5212234_HTR_DR_0508_STAT_T_REV_A.pdf
528.4 KB
5212234_HTR_DR_0509_STAT_T_REV_-.pdf
583.7 KB
5212234_HTR_DR_0509_STAT_T_REV_A.pdf
595.0 KB
5212234_HTR_DR_0510_STAT_T_REV_-.pdf
578.0 KB
5212234_HTR_DR_0510_STAT_T_REV_A.pdf
591.0 KB
5212234_HTR_DR_0551_STAT_I_REV_A.pdf
447.0 KB
5212234_HTR_DR_0552_STAT_I_REV_A.pdf
457.0 KB
5212234_HTR_DR_0553_STAT_I_REV_A.pdf
452.6 KB
5212234_HTR_DR_0554_STAT_I_REV_A.pdf
461.4 KB
5212234_HTR_DR_0555_STAT_I_REV_A.pdf
467.8 KB
5212234_HTR_DR_0556_STAT_I_REV_B.pdf
496.2 KB
5212234_HTR_DR_0558_STAT_I_REV_B.pdf
473.7 KB
5212234_HTR_DR_0559_STAT_I_REV_B.pdf
525.8 KB
5212234_HTR_DR_0560_STAT_I_REV_B.pdf
492.7 KB
5212234_HTR_DR_0576_STAT_T_REV_A.pdf
608.8 KB
5212234_HTR_DR_0577_STAT_T_REV_-.pdf
478.4 KB
5212234_HTR_DR_0577_STAT_T_REV_A.pdf
523.6 KB
5212234_HTR_DR_0578_STAT_T_REV_-.pdf
513.6 KB
5212234_HTR_DR_0578_STAT_T_REV_A.pdf
566.3 KB
5212234_HTR_DR_0579_STAT_T_REV_-.pdf
555.9 KB
5212234_HTR_DR_0579_STAT_T_REV_A.pdf
624.1 KB
5212234_HTR_DR_0580_STAT_T_REV_-.pdf
533.7 KB
5212234_HTR_DR_0580_STAT_T_REV_A.pdf
583.2 KB
5212234_HTR_DR_0581_STAT_T_REV_-.pdf
562.1 KB
5212234_HTR_DR_0581_STAT_T_REV_A.pdf
639.3 KB
5212234_HTR_DR_0582_STAT_T_REV_-.pdf
586.2 KB
5212234_HTR_DR_0582_STAT_T_REV_A.pdf
656.9 KB
5212234_HTR_DR_0583_STAT_T_REV_-.pdf
498.1 KB
5212234_HTR_DR_0583_STAT_T_REV_A.pdf
538.5 KB
5212234_HTR_DR_0601_STAT_T_REV_-.pdf
609.1 KB
5212234_HTR_DR_0601_STAT_T_REV_A.pdf
585.6 KB
5212234_HTR_DR_0602_STAT_T_REV_-.pdf
826.6 KB
5212234_HTR_DR_0602_STAT_T_REV_A.pdf
638.9 KB
5212234_HTR_DR_0603_STAT_T_REV_-.pdf
739.1 KB
5212234_HTR_DR_0603_STAT_T_REV_A.pdf
615.5 KB
5212234_HTR_DR_0604_STAT_T_REV_-.pdf
762.2 KB
5212234_HTR_DR_0604_STAT_T_REV_A.pdf
642.4 KB
5212234_HTR_DR_0605_STAT_T_REV_-.pdf
930.0 KB
5212234_HTR_DR_0605_STAT_T_REV_A.pdf
768.5 KB
5212234_HTR_DR_0606_STAT_T_REV_-.pdf
1.1 MB
5212234_HTR_DR_0606_STAT_T_REV_A.pdf
1.0 MB
5212234_HTR_DR_0607_STAT_T_REV_-.pdf
908.4 KB
5212234_HTR_DR_0607_STAT_T_REV_A.pdf
757.8 KB
5212234_HTR_DR_0608_STAT_T_REV_-.pdf
773.5 KB
5212234_HTR_DR_0608_STAT_T_REV_A.pdf
667.0 KB
5212234_HTR_DR_0609_STAT_T_REV_-.pdf
959.1 KB
5212234_HTR_DR_0609_STAT_T_REV_A.pdf
942.9 KB
5212234_HTR_DR_0610_STAT_T_REV_-.pdf
769.4 KB
5212234_HTR_DR_0610_STAT_T_REV_A.pdf
769.2 KB
5212234_HTR_DR_0620_STAT_T_REV_-.pdf
639.0 KB
5212234_HTR_DR_0701_STAT_T_REV_-.pdf
502.9 KB
5212234_HTR_DR_0701_STAT_T_REV_A.pdf
517.2 KB
5212234_HTR_DR_0702_STAT_T_REV_-.pdf
566.1 KB
5212234_HTR_DR_0702_STAT_T_REV_A.pdf
582.9 KB
5212234_HTR_DR_0703_STAT_T_REV_-.pdf
533.9 KB
5212234_HTR_DR_0703_STAT_T_REV_A.pdf
551.4 KB
5212234_HTR_DR_0704_STAT_T_REV_-.pdf
570.0 KB
5212234_HTR_DR_0704_STAT_T_REV_A.pdf
573.1 KB
5212234_HTR_DR_0705_STAT_T_REV_-.pdf
602.9 KB
5212234_HTR_DR_0705_STAT_T_REV_A.pdf
667.7 KB
5212234_HTR_DR_0706_STAT_T_REV_-.pdf
893.8 KB
5212234_HTR_DR_0706_STAT_T_REV_A.pdf
772.6 KB
5212234_HTR_DR_0707_STAT_T_REV_-.pdf
644.7 KB
5212234_HTR_DR_0707_STAT_T_REV_A.pdf
632.7 KB
5212234_HTR_DR_0708_STAT_T_REV_-.pdf
583.3 KB
5212234_HTR_DR_0708_STAT_T_REV_A.pdf
599.7 KB
5212234_HTR_DR_0709_STAT_T_REV_-.pdf
699.5 KB
5212234_HTR_DR_0709_STAT_T_REV_A.pdf
712.0 KB
5212234_HTR_DR_0710_STAT_T_REV_-.pdf
680.0 KB
5212234_HTR_DR_0710_STAT_T_REV_A.pdf
695.3 KB
5212234_HTR_DR_1101_STAT_T_REV_-.pdf
553.4 KB
5212234_HTR_DR_1101_STAT_T_REV_A.pdf
578.6 KB
5212234_HTR_DR_1102_STAT_T_REV_-.pdf
509.3 KB
5212234_HTR_DR_1102_STAT_T_REV_A.pdf
533.7 KB
5212234_HTR_DR_1103_STAT_T_REV_-.pdf
504.7 KB
5212234_HTR_DR_1103_STAT_T_REV_A.pdf
530.0 KB
5212234_HTR_DR_1104_STAT_T_REV_-.pdf
512.0 KB
5212234_HTR_DR_1104_STAT_T_REV_A.pdf
535.4 KB
5212234_HTR_DR_1105_STAT_T_REV_-.pdf
554.4 KB
5212234_HTR_DR_1105_STAT_T_REV_A.pdf
577.4 KB
5212234_HTR_DR_1106_STAT_T_REV_-.pdf
748.0 KB
5212234_HTR_DR_1106_STAT_T_REV_A.pdf
771.7 KB
5212234_HTR_DR_1107_STAT_T_REV_-.pdf
618.7 KB
5212234_HTR_DR_1107_STAT_T_REV_A.pdf
640.7 KB
5212234_HTR_DR_1108_STAT_T_REV_-.pdf
578.0 KB
5212234_HTR_DR_1108_STAT_T_REV_A.pdf
600.4 KB
5212234_HTR_DR_1109_STAT_T_REV_-.pdf
602.7 KB
5212234_HTR_DR_1109_STAT_T_REV_A.pdf
626.0 KB
5212234_HTR_DR_1110_STAT_T_REV_-.pdf
594.7 KB
5212234_HTR_DR_1110_STAT_T_REV_A.pdf
616.4 KB
5212234_HTR_DR_1201_STAT_T_REV_-.pdf
640.6 KB
5212234_HTR_DR_1201_STAT_T_REV_A.pdf
642.5 KB
5212234_HTR_DR_1202_STAT_T_REV_-.pdf
550.3 KB
5212234_HTR_DR_1202_STAT_T_REV_A.pdf
551.3 KB
5212234_HTR_DR_1203_STAT_T_REV_-.pdf
576.8 KB
5212234_HTR_DR_1203_STAT_T_REV_A.pdf
577.8 KB
5212234_HTR_DR_1204_STAT_T_REV_-.pdf
601.5 KB
5212234_HTR_DR_1204_STAT_T_REV_A.pdf
602.5 KB
5212234_HTR_DR_1205_STAT_T_REV_-.pdf
646.0 KB
5212234_HTR_DR_1205_STAT_T_REV_A.pdf
647.0 KB
5212234_HTR_DR_1206_STAT_T_REV_-.pdf
894.9 KB
5212234_HTR_DR_1206_STAT_T_REV_A.pdf
983.3 KB
5212234_HTR_DR_1207_STAT_T_REV_-.pdf
819.1 KB
5212234_HTR_DR_1207_STAT_T_REV_A.pdf
820.0 KB
5212234_HTR_DR_1208_STAT_T_REV_-.pdf
709.4 KB
5212234_HTR_DR_1208_STAT_T_REV_A.pdf
710.4 KB
5212234_HTR_DR_1209_STAT_T_REV_-.pdf
943.0 KB
5212234_HTR_DR_1209_STAT_T_REV_A.pdf
882.3 KB
5212234_HTR_DR_1210_STAT_T_REV_-.pdf
950.4 KB
5212234_HTR_DR_1210_STAT_T_REV_A.pdf
952.3 KB
5212234_HTR_DR_1221_STAT_T_REV_-.pdf
712.4 KB
5212234_HTR_DR_1221_STAT_T_REV_A.pdf
663.0 KB
5212234_HTR_DR_1222_STAT_T_REV_-.pdf
782.7 KB
5212234_HTR_DR_1222_STAT_T_REV_A.pdf
729.7 KB
5212234_HTR_DR_1223_STAT_T_REV_-.pdf
742.1 KB
5212234_HTR_DR_1223_STAT_T_REV_A.pdf
701.8 KB
5212234_HTR_DR_1251_STAT_T_REV_-.pdf
590.8 KB
5212234_HTR_DR_1251_STAT_T_REV_A.pdf
624.6 KB
5212234_HTR_DR_1252_STAT_T_REV_-.pdf
531.3 KB
5212234_HTR_DR_1252_STAT_T_REV_A.pdf
568.4 KB
5212234_HTR_DR_1253_STAT_T_REV_-.pdf
526.5 KB
5212234_HTR_DR_1253_STAT_T_REV_A.pdf
564.8 KB
5212234_HTR_DR_1254_STAT_T_REV_-.pdf
541.2 KB
5212234_HTR_DR_1254_STAT_T_REV_A.pdf
576.3 KB
5212234_HTR_DR_1255_STAT_T_REV_-.pdf
583.2 KB
5212234_HTR_DR_1255_STAT_T_REV_A.pdf
617.3 KB
5212234_HTR_DR_1256_STAT_T_REV_-.pdf
652.3 KB
5212234_HTR_DR_1256_STAT_T_REV_A.pdf
687.0 KB
5212234_HTR_DR_1257_STAT_T_REV_-.pdf
601.5 KB
5212234_HTR_DR_1257_STAT_T_REV_A.pdf
634.4 KB
5212234_HTR_DR_1258_STAT_T_REV_-.pdf
584.2 KB
5212234_HTR_DR_1258_STAT_T_REV_A.pdf
616.4 KB
5212234_HTR_DR_1259_STAT_T_REV_-.pdf
726.2 KB
5212234_HTR_DR_1259_STAT_T_REV_A.pdf
781.1 KB
5212234_HTR_DR_1260_STAT_T_REV_-.pdf
667.0 KB
5212234_HTR_DR_1260_STAT_T_REV_A.pdf
696.7 KB
5212234_HTR_DR_1301_STAT_T_REV_-.pdf
521.4 KB
5212234_HTR_DR_1301_STAT_T_REV_A.pdf
530.1 KB
5212234_HTR_DR_1302_STAT_T_REV_-.pdf
478.3 KB
5212234_HTR_DR_1302_STAT_T_REV_A.pdf
489.3 KB
5212234_HTR_DR_1303_STAT_T_REV_-.pdf
475.1 KB
5212234_HTR_DR_1303_STAT_T_REV_A.pdf
485.6 KB
5212234_HTR_DR_1304_STAT_T_REV_-.pdf
485.4 KB
5212234_HTR_DR_1304_STAT_T_REV_A.pdf
495.9 KB
5212234_HTR_DR_1305_STAT_T_REV_-.pdf
524.5 KB
5212234_HTR_DR_1305_STAT_T_REV_A.pdf
533.2 KB
5212234_HTR_DR_1306_STAT_T_REV_-.pdf
590.2 KB
5212234_HTR_DR_1306_STAT_T_REV_A.pdf
602.6 KB
5212234_HTR_DR_1307_STAT_T_REV_-.pdf
578.3 KB
5212234_HTR_DR_1307_STAT_T_REV_A.pdf
588.8 KB
5212234_HTR_DR_1308_STAT_T_REV_-.pdf
525.3 KB
5212234_HTR_DR_1308_STAT_T_REV_A.pdf
533.3 KB
5212234_HTR_DR_1309_STAT_T_REV_-.pdf
582.0 KB
5212234_HTR_DR_1309_STAT_T_REV_A.pdf
599.2 KB
5212234_HTR_DR_1310_STAT_T_REV_-.pdf
631.4 KB
5212234_HTR_DR_1310_STAT_T_REV_A.pdf
643.8 KB
5212234_HTR_DR_1401_STAT_T_REV_-.pdf
305.3 KB
5212234_HTR_DR_1401_STAT_T_REV_A.pdf
310.3 KB
5212234_HTR_DR_1402_STAT_T_REV_-.pdf
295.1 KB
5212234_HTR_DR_1402_STAT_T_REV_A.pdf
365.3 KB
5212234_HTR_DR_1701_STAT_T_REV_-.pdf
872.2 KB
5212234_HTR_DR_1702_STAT_T_REV_-.pdf
408.3 KB
5212234_HTR_DR_1703_STAT_T_REV_-.pdf
690.2 KB
5212234_HTR_DR_1704_STAT_T_REV_-.pdf
641.4 KB
5212234_HTR_DR_1705_STAT_T_REV_-.pdf
514.6 KB
5212234_HTR_DR_1706_STAT_T_REV_-.pdf
513.0 KB
5212234_HTR_DR_1707_STAT_T_REV_-.pdf
296.7 KB
5212234_HTR_DR_1707_STAT_T_REV_A.pdf
380.9 KB
5212234_HTR_DR_1708_STAT_T_REV_-.pdf
214.4 KB
5212234_HTR_DR_1708_STAT_T_REV_A.pdf
270.5 KB
5212234_HTR_DR_1709_STAT_T_REV_-.pdf
347.1 KB
5212234_HTR_DR_1710_STAT_T_REV_-.pdf
155.3 KB
5212234_HTR_DR_1711_STAT_T_REV_-.pdf
177.8 KB
5212234_HTR_DR_1712_STAT_T_REV_-.pdf
158.8 KB
5212234_HTR_DR_1713_STAT_T_REV_-.pdf
161.2 KB
5212234_HTR_DR_1714_STAT_T_REV_-.pdf
151.5 KB
5212234_HTR_DR_1715_STAT_T_REV_-.pdf
158.1 KB
5212234_HTR_DR_1716_STAT_T_REV_-.pdf
156.9 KB
5212234_HTR_DR_1717_STAT_T_REV_-.pdf
157.2 KB
5212234_HTR_DR_1721_STAT_T_REV_-.pdf
378.5 KB
5212234_HTR_DR_1722_STAT_T_REV_-.pdf
365.5 KB
5212234_HTR_DR_1722_STAT_T_REV_A.pdf
367.2 KB
5212234_HTR_SCD_001_STAT_T_REV_-.pdf
188.8 KB
5212234_HTR_SCD_001_STAT_T_REV_A.pdf
192.2 KB
5212234_HTR_SCD_002_STAT_T_REV_-.pdf
241.4 KB
5212234_HTR_SCD_003_STAT_T_REV_-.pdf
158.9 KB
5212234_HTR_SCD_004_STAT_T_REV_-.pdf
170.2 KB
5212234_HTR_SCD_005_STAT_T_REV_-.pdf
323.7 KB
5212234_HTR_SCD_006_STAT_T_REV_-.pdf
283.7 KB
5212234_HTR_SCD_007_STAT_T_REV_-.pdf
176.2 KB
5212234_HTR_SCD_007_STAT_T_REV_A..pdf
223.1 KB
5212234_HTR_SCD_008_STAT_T_REV_-.pdf
196.5 KB
5212234_HTR_SCD_009_STAT_T_REV_-.pdf
463.9 KB
5212234_HTR_SCD_010_STAT_T_REV_-.pdf
245.3 KB
5212234_HTR_SCD_010_STAT_T_REV_A..pdf
208.4 KB
5212234_HTR_SCD_011_STAT_T_REV_-.pdf
1.4 MB
5212234_HTR_SCD_011_STAT_T_REV_A..pdf
1.7 MB
5212234_HTR_SCD_012_STAT_T_REV_-.pdf
411.7 KB
5212234_HTR_SCD_012_STAT_T_REV_A..pdf
538.9 KB
5212234_HTR_SCD_014_STAT_T_REV_-.pdf
585.3 KB
5212234_HTR_SCD_015_STAT_T_REV_-.pdf
270.2 KB
5212234_HTR_SCD_016_STAT_T_REV_-.pdf
194.8 KB
5212234_HTR_SCD_016_STAT_T_REV_A..pdf
212.2 KB
5212234_HTR_SCD_017_STAT_T_REV_-.pdf
348.0 KB
5212234_HTR_SCD_018_STAT_T_REV_-.pdf
168.9 KB
5212234_HTR_SCD_019_STAT_T_REV_-.pdf
155.2 KB
5212234DG0101 rev 1 - DPTMP.pdf
6.6 MB
5212234DG0111 rev 2 - MC - PHSP (Vol F).pdf
561.3 KB
5212234DI0020 - Tree Survey Report.docx
787.4 KB
5212234DI0021 - Murphys_Utility Survey Report.pdf
1.3 MB
5212234DI0052.pdf
4.4 MB
App-A-Reg-57.docx
39.3 KB
App-B1-List-Prev-Works.docx
33.0 KB
App-B2-Cert-Execution.docx
26.0 KB
App-B3-Cert-Delivery.docx
25.6 KB
App-C-Bankers-Letter.docx
31.0 KB
App-D2-Bond.docx
28.2 KB
AXIA 3 LIGHT CONTROL LOUVRES.pdf
388.6 KB
Eir Distribution Cabinet Plinth.pdf
95.9 KB
Eir FTTC Cabinet Plinth.pdf
974.3 KB
ITTW_Invitation to Tender_MB2CR.pdf
59.8 KB
MB2CR 3.4.1-HS - T0.pdf
231.2 KB
MB2CR 3.4.2-HS - T0.pdf
275.3 KB
MB2CR ITT-W2 v 3.0 - T0.pdf
459.0 KB
MB2CR QW2-P1 - T0.pdf
651.2 KB
MB2CR QW2-P2 - T0.pdf
300.3 KB
MB2CR Tender Bulletin 2.pdf
159.7 KB
MB2CR Vol A P1 - T0.pdf
3.4 MB
MB2CR Vol A P1 - T1.pdf
3.5 MB
MB2CR Vol A P1 - T2.pdf
3.5 MB
MB2CR Vol A P3 - T0.docx
110.5 KB
MB2CR Vol B - T0.pdf
502.3 KB
MB2CR Vol C - T0.pdf
1.3 MB
MB2CR Vol C - T0.xlsx
179.3 KB
MB2CR Vol C - T1.pdf
665.9 KB
MB2CR Vol C - T1.xlsx
182.1 KB
MB2CR Vol C - T2.pdf
770.1 KB
MB2CR Vol C - T2.xlsx
186.2 KB
Meath Co Co - R147 Navan Cycle Scheme - Maps.pdf
4.0 MB
Meath Co Co - R147 Navan Cycle Scheme - WinCan Report.pdf
72.8 MB
MF-1.10-09-04-2020.docx
51.1 KB
MF-1.13-09-04-2020.docx
46.0 KB
MF-1.6-09-04-2020.docx
55.6 KB
MGS51081_T_ITM_Rev0.pdf
5.4 MB
R147 Navan Cycle Scheme Survey Sheets.pdf
89.1 KB
R147 Navan Cycle Scheme Survey Sheets.xlsx
15.8 KB
R147 Navan Cycle Scheme Trees A3-P (2).pdf
273.3 KB
R147 Navan Cycle Scheme Trees A3-P (3).pdf
166.5 KB
R147 Navan Cycle Scheme Trees A3-P (4).pdf
177.8 KB
Schreder-Axia-3-Louvres-Installation-instructions (3).pdf
1.1 MB
TRA-12-99-06_PL SCD Details-PL Sleeve Chamber.pdf
377.4 KB
TRA-99-2.1-Traffic Lights SCD Details-Zebra Crossing_Typical Layout_Rev.A.pdf
502.9 KB
TRA-99-2.11-Traffic Lights SCD Details- 2 & 4 way Traffic Cable Duct.pdf
526.5 KB
TRA-99-2.2-Traffic Lights SCD Details-Pedestrian Crossing_Typical Layout.pdf
520.2 KB
TRA-99-2.3-Traffic Lights SCD Details-Toucan Crossing_Typical Layout.pdf
554.7 KB
TRA-99-4.1-Traffic Lights SCD Details-Type B1 Zebra Crossing Pole 6m.pdf
623.8 KB
TRA-99-4.2-Traffic Lights SCD Details-Type B2 Zebra Crossing Pole 3m.pdf
639.0 KB
TRA-99-4.3-Traffic Lights SCD Details_Traffic Signal Pole 4m.pdf
621.8 KB
TRA-99-4.4-Traffic Lights SCD Details_Traffic Signal Pole 7m.pdf
614.6 KB
TRA-99-5.1-Traffic Lights SCD Details-Verge-Footway Access Chamber.pdf
567.7 KB
TRA-99-6.1-Traffic Lights SCD Details-Unmetered Micro Pillar_Rev.A.pdf
650.4 KB
TRA-99-6.2-Traffic Lights SCD Details-Un-metered 3 Phase Feeder Pillar_Rev.A.pdf
621.2 KB
TRA-99-6.3-Traffic Lights SCD Details-Metered 3Phase Feeder Pillar.pdf
626.7 KB
TRA-99-6.3-Traffic Lights SCD Details-Metered 3Phase Feeder Pillar_Rev.A.pdf
637.2 KB
TRA-99-9.1-Traffic Lights SCD Details-Belisha Beacon Wiring Diagram.pdf
498.8 KB
TRA-99-9.2-Traffic Lights SCD Details-Micro Pillar Wiring Diagram.pdf
582.4 KB
TRA-99-9.3-Public Lights SCD Details-Micro Pillar Wiring Diagram.pdf
386.7 KB
TRA-99.11.1-Traffic Lights SCD Details-Traffic Controller Cabinet.pdf
865.6 KB
TRA-99.15.1-Traffic Lights SCD Details-CCTV Cabinet.pdf
1.0 MB
Original notice text
This tender involves the construction of a cycle and pedestrian scheme connecting Martha's Bridge to Circular Road, including road restraint systems and integration with existing services.
AI analysis updated 4 months ago
Deadline
21 May
Buyer
Meath County CouncilLocation
Ireland
Procedure
Open
Clarification
07 May 2025
eTenders ID
5435734
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender