Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Minor Construction and Civil Works 2025 - Dundalk Institute of Technology
Closed Construction & Civil Engineering Works Open

Minor Construction and Civil Works 2025 - Dundalk Institute of Technology

Value

€800k

Deadline

13 May

Tender for minor construction and civil works at Dundalk Institute of Technology.

SME fit: Medium Bid effort: Medium 📍 Louth

Tender for minor construction and civil works at Dundalk Institute of Technology.

Bidder profile

Ideal bidders are firms with experience in public procurement and the ability to meet specified insurance and turnover requirements.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Dundalk Institute of Technology_1155
Title Minor Construction and Civil Works 2025 - Dundalk Institute of Technology
CPV / category works / Construction & Civil Engineering
Estimated value €800000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2025-05-13T16:00:00+00:00
Go-live / start up

2. Scope of Work

This procurement covered the supply scope described in the tender pack for Minor Construction and Civil Works 2025 - Dundalk Institute of Technology. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Dundalk Institute of Technology_1155.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event -; 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works € * public liability €6,500[9] * employer’s liability €6,500[10] * insurance of the Works and goods and materials for the Works € * public liability €6,500[9] * employer’s l; Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[15] € 4,000,000 CA SUPPLEMENTARY REQUIREMENTS: Cl

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[15] € 4,000,000
  • Insurance
  • Public Liability — €6,500
  • Employer's Liability — €13,000,000
  • Professional Indemnity — €1,500,000
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event -; 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works € * public liability €6,500[9] * employer’s liability €6,500[10] * insurance of the Works and goods and materials for the Works € * public liability €6,500[9] * employer’s l; Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[15] € 4,000,000 CA SUPPLEMENTARY REQUIREMENTS: Cl

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline CF6) • The documents describing the Works (Volume A) • The completed Form of Tender and Schedule (Volume B) • The completed pricing document (Volume C) [where required]
Mandatory site visit not stated
Tender deadline (date + time) 2025-05-13T16:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): DKITSW-Z5-02-L00-DR-STW-AR-020602.pdf, FTS-6-v1.6-19-07-2023-1.docx
  • eTenders CFT ID: not stated
  • Clarification contact / portal: [email protected]
  • Priority attachments: DKITSW-Z5-02-L00-DR-STW-AR-020602.pdf, FTS-6-v1.6-19-07-2023-1.docx, DKITSW-Z4-02-ZZZ-DR-STW-AR-020501.pdf

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€4,000,000

Public liability insurance

€6,500

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1

Documents (106)

DOCX

QW-Part-2-v1.0-28-07-2023.docx

72.8 KB · Form / Declaration / Certificate

PDF

5191499DG0017 PSHP DKIT Summer Works 2025 Rev 0.0.pdf

698.7 KB · Other

PDF

1627-ADV-NC106-ESI-00_T02.pdf

741.1 KB

PDF

1627-ADV-NC106-MSI-ZZ_T02.pdf

1.3 MB

PDF

1627-ADV-NE153-ESI-00_T01.pdf

758.7 KB

PDF

24058-PFD-PR-00-DR-F-002(A0).pdf

1.3 MB

PDF

24058-PFD-PR-01-DR-F-003(A0).pdf

549.1 KB

PDF

24058-PFD-PR-01-DR-F-004(A0).pdf

995.8 KB

PDF

250325 - 1627 - ADV - Elec Schedule of Drawings_T01.pdf

159.6 KB

PDF

250325 - 1627 - ADV - Mech Schedule of Drawings_T01.pdf

160.1 KB

PDF

250325 - 1627 - ADV - NC106 Elec Builders Work_T01.pdf

236.1 KB

PDF

250325 - 1627 - ADV - NE153 Elec Builders Work_T01.pdf

232.5 KB

PDF

250401 - 1627 - ADV - NC106 Mech Builders Work_T02.pdf

55.5 KB

PDF

250408 - 1627 - ADV - NC106 Elec Summary of Tender_T02.pdf

241.5 KB

PDF

250408 - 1627 - ADV - NC106 Mech Summary of Tender_T03.pdf

238.0 KB

PDF

250408 - 1627 - ADV - NE153 Elec Summary of Tender_T02.pdf

238.1 KB

PDF

Design Risk Assessment.pdf

689.1 KB

PDF

DKIT_North Block Lecture Theatre_RDAS_140325.pdf

460.0 KB

PDF

DKITSW-STW-XX-XX-RP-AR-0000095-Description document.pdf

2.2 MB

PDF

DKITSW-Z1-01-ZZZ-DR-STW-AR-010010.pdf

625.0 KB

PDF

DKITSW-Z1-02-ZZZ-DR-STW-AR-020105.pdf

305.2 KB

PDF

DKITSW-Z1-02-ZZZ-DR-STW-AR-020300.pdf

232.2 KB

PDF

DKITSW-Z1-XX-XXX-RG-STW-AR-Z10000 - Register.pdf

157.9 KB

PDF

DKITSW-Z1-XX-XXX-RP-STW-AR-000091.pdf

1.8 MB

PDF

DKITSW-Z1Z2-XX-XXX-SP-STW-AR-000002.pdf

278.9 KB

PDF

DKITSW-Z2-01-ZZZ-DR-STW-AR-010020.pdf

624.5 KB

PDF

DKITSW-Z2-02-ZZZ-DR-STW-AR-020106.pdf

452.1 KB

PDF

DKITSW-Z2-02-ZZZ-DR-STW-AR-020301.pdf

158.1 KB

PDF

DKITSW-Z2-XX-XXX-RG-STW-AR-Z20000 - Register.pdf

157.9 KB

PDF

DKITSW-Z2-XX-XXX-RP-STW-AR-000092.pdf

1.7 MB

PDF

DKITSW-Z3-01-ZZZ-DR-STW-AR-010030.pdf

342.7 KB

PDF

DKITSW-Z3-02-L00-DR-STW-AR-020100.pdf

455.6 KB

PDF

DKITSW-Z3-02-L00-DR-STW-AR-020101.pdf

627.9 KB

PDF

DKITSW-Z3-02-L00-DR-STW-AR-020102.pdf

106.3 KB

PDF

DKITSW-Z3-02-L00-DR-STW-AR-020103.pdf

88.7 KB

PDF

DKITSW-Z3-02-L00-DR-STW-AR-020310.pdf

221.3 KB

PDF

DKITSW-Z3-02-L00-DR-STW-AR-020311.pdf

161.3 KB

PDF

DKITSW-Z3-02-L00-DR-STW-AR-020312.pdf

161.4 KB

PDF

DKITSW-Z3-02-L00-DR-STW-AR-020313.pdf

152.6 KB

PDF

DKITSW-Z3-02-R01-DR-STW-AR-020110.pdf

179.5 KB

PDF

DKITSW-Z3-02-R01-DR-STW-AR-020111.pdf

124.1 KB

PDF

DKITSW-Z3-02-ZZZ-DR-STW-AR-020201.pdf

352.2 KB

PDF

DKITSW-Z3-08-L00-DR-STW-AR-080100.pdf

437.0 KB

PDF

DKITSW-Z3-08-L00-DR-STW-AR-080101.pdf

148.1 KB

PDF

DKITSW-Z3-08-L00-DR-STW-AR-080102.pdf

175.4 KB

PDF

DKITSW-Z3-08-L00-DR-STW-AR-080103.pdf

78.6 KB

PDF

DKITSW-Z3-08-L00-DR-STW-AR-080104.pdf

85.4 KB

PDF

DKITSW-Z3-09-ZZZ-DR-STW-AR-090001.pdf

243.0 KB

PDF

DKITSW-Z3-09-ZZZ-DR-STW-AR-090002.pdf

244.0 KB

PDF

DKITSW-Z3-09-ZZZ-DR-STW-AR-090003.pdf

244.6 KB

PDF

DKITSW-Z3-09-ZZZ-DR-STW-AR-090004.pdf

241.8 KB

PDF

DKITSW-Z3-09-ZZZ-DR-STW-AR-090005.pdf

242.6 KB

PDF

DKITSW-Z3-22-L00-DR-STW-AR-220100.pdf

274.2 KB

PDF

DKITSW-Z3-23-L00-DR-STW-AR-230001.pdf

81.1 KB

PDF

DKITSW-Z3-23-L00-DR-STW-AR-230002.pdf

460.5 KB

PDF

DKITSW-Z3-23-L00-DR-STW-AR-230003.pdf

464.5 KB

PDF

DKITSW-Z3-32-ZZZ-DR-STW-AR-320001.pdf

121.6 KB

PDF

DKITSW-Z3-32-ZZZ-DR-STW-AR-320010.pdf

964.7 KB

PDF

DKITSW-Z3-35-L00-DR-STW-AR-350101.pdf

162.9 KB

PDF

DKITSW-Z3-35-L00-DR-STW-AR-350102.pdf

72.9 KB

PDF

DKITSW-Z3-35-ZZZ-DR-STW-AR-350100.pdf

966.5 KB

PDF

DKITSW-Z3-43-L00-DR-STW-AR-430100.pdf

511.6 KB

PDF

DKITSW-Z3-43-L00-DR-STW-AR-430103.pdf

91.1 KB

PDF

DKITSW-Z3-43-L00-DR-STW-AR-430104.pdf

138.3 KB

PDF

DKITSW-Z3-43-L00-DR-STW-AR-430105.pdf

128.6 KB

PDF

DKITSW-Z3-43-ZZZ-DR-STW-AR-430102.pdf

205.6 KB

PDF

DKITSW-Z3-72-L00-DR-STW-AR-720001.pdf

572.6 KB

PDF

DKITSW-Z3-72-L00-DR-STW-AR-720002-.pdf

681.2 KB

PDF

DKITSW-Z3-72-L00-DR-STW-AR-720003.pdf

779.8 KB

PDF

DKITSW-Z3-72-L00-DR-STW-AR-720004.pdf

547.3 KB

PDF

DKITSW-Z3-77-ZZZ-DR-STW-AR-770001.pdf

140.1 KB

PDF

DKITSW-Z3-XX-XXX-RG-STW-AR-Z30000 - Register-.pdf

174.4 KB

PDF

DKITSW-Z3-XX-XXX-RP-STW-AR-000093.pdf

3.1 MB

PDF

DKITSW-Z4-01-ZZZ-DR-STW-AR-010040.pdf

624.1 KB

PDF

DKITSW-Z4-02-ZZZ-DR-STW-AR-020500.pdf

1.2 MB

PDF

DKITSW-Z4-02-ZZZ-DR-STW-AR-020501.pdf

190.3 KB

PDF

DKITSW-Z4-XX-XXX-RG-STW-AR-Z40001 - Register.pdf

158.2 KB

PDF

DKITSW-Z4-XX-XXX-RP-STW-AR-000094.pdf

1.1 MB

PDF

DKITSW-Z5-01-ZZZ-DR-STW-AR-010050.pdf

727.8 KB

PDF

DKITSW-Z5-02-L00-DR-STW-AR-020600.pdf

1.1 MB

PDF

DKITSW-Z5-02-L00-DR-STW-AR-020601.pdf

366.1 KB

PDF

DKITSW-Z5-02-L00-DR-STW-AR-020602.pdf

331.6 KB

PDF

DKITSW-Z5-02-L00-DR-STW-AR-020603.pdf

105.4 KB

PDF

DKITSW-Z5-02-L00-DR-STW-AR-020605.pdf

89.7 KB

PDF

DKITSW-Z5-23-L00-DR-STW-AR-230600.pdf

179.3 KB

PDF

DKITSW-Z5-43-L00-DR-STW-AR-430600.pdf

552.8 KB

PDF

DKITSW-Z5-77-L00-DR-STW-AR-770600.pdf

282.1 KB

PDF

DKITSW-Z5-XX-XXX-RG-STW-AR-010000 - Register.pdf

160.8 KB

PDF

DKITSW-Z5-XX-XXX-RP-STW-AR-00080-Sports.pdf

757.3 KB

PDF

DKITSW-Z5-XX-XXX-RP-STW-AR-00081-Main Campus.pdf

762.1 KB

PDF

DKITSW-Z5-XX-XXX-SP-STW-AR-000003.pdf

660.1 KB

PDF

DKITSW-ZZ-01-ZZZ-DR-STW-AR-010080.pdf

368.9 KB

PDF

DKITSW-ZZ-XX-XXX-RG-STW-AR-Z10001 - Register.pdf

155.6 KB

PDF

DKT2205-ATK-01-XX-DR-CE-011002.pdf

326.2 KB

PDF

DKT2205-ATK-02-00-DR-CE-011001.pdf

727.1 KB

PDF

DKT2205-ATK-XX-XX-DR-CE-570001.pdf

401.7 KB

PDF

DKT2205-ATK-XX-XX-DR-CE-90100.pdf

1.6 MB

PDF

DKT2205-ATK-XX-XX-DR-CE-901101.pdf

586.0 KB

ZIP

EOX CITE and Excel Files.zip

388.8 KB

DOCX

FTS-6-v1.6-19-07-2023-1.docx (2025 Rev 2).docx

61.4 KB

DOCX

ITT-W4-v2.0-18-11-24.docx (2025 Rev 3).docx

69.6 KB

DOCX

QW2-Part-1-v2.1-18-11-2024-09-01-2025.docx (2025 Rev 1).docx

196.2 KB

PDF

Summer Works Specification.pdf

1.2 MB

PDF

TGD-B Reprint 2020 FSCA Compliance Report.pdf

604.8 KB

PDF

Vol C Pricing Doc Tender Issue.pdf

2.4 MB

PDF

Volume C - Pricing Document Notes.pdf

532.3 KB

Original notice text

This tender seeks contractors for minor construction and civil works at Dundalk Institute of Technology, ensuring compliance with public procurement standards and quality specifications.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€800k

Deadline

13 May

View on eTenders ↗

Location

Dundalk Institute of Technology campus

Procedure

Open

Clarification

28 Apr 2025

eTenders ID

5443831

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender