Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Proposed New Metabolism Building at Teagasc Moorepark, Fermoy, Co.Cork
Awarded Construction & Civil Engineering Works SME Suitable Open

Proposed New Metabolism Building at Teagasc Moorepark, Fermoy, Co.Cork

Deadline

19 May

Construction of a new metabolism building at Teagasc Moorepark over 12 months

SME fit: Medium Bid effort: Medium 📍 Cork

Construction of a new metabolism building at Teagasc Moorepark over 12 months

Bidder profile

Mid-sized to large specialist firms with public-sector tender experience and compliance capabilities.

Risks & flags

  • Undisclosed contract value
  • Qualification gate turnover threshold
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Teagasc - the Agriculture and Food Development Authority
Title Proposed New Metabolism Building at Teagasc Moorepark, Fermoy, Co.Cork
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Adjacent to
Contract length 12 months
Submission deadline 2025-05-19T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

Teagasc - the Agriculture and Food Development Authority ran this procurement for “Proposed New Metabolism Building at Teagasc Moorepark, Fermoy, Co.Cork” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Each system shall comprise a minimum of 2 no
  • A minimum of one serviceable internal vibrator shall be provided for each 3
  • RETRIEVAL SYSTEM OF ANY NATURE WITHOUT THE
  • [CSAGR-MOR-X3-L00-DR-SE-2400 - Proposed ESB Building.pdf] RETRIEVAL SYSTEM OF ANY NATURE WITHOUT THE
  • 2x25A Powersupply to Condenser unit
    1. The contractor shall confirm the final location of all services with
  • preparation of coordinated services drawings for the ceiling mounted
    1. All Services not on wall mounted Dado trunking shall be recessed
  • 7.The contractor shall refer to tender supporting documents for the
  • installed to be handed over to Teagasc maintenance department for
  • location and type of supply required(i.e, plug in or Isolator) before final
  • No part of this document may be re-produced or transmitted in any form or stored in any retrieval system of any nature without the written Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Maintaining measurement history for a minimum of 12 months
  • Electrical Contractor to Liaise with Incumbent Specialist
  • Existing Fire Alarm Panel located at
    1. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The Contractor IS to be appointed project supervisor for the construction stage for the Works A/13D D Insurance A/13E Minimum indemnity limit for Public liability insurance: €6,500,000 A/13F Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event;  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be
  • Certifications — The Contractor IS to be appointed project supervisor for the construction stage for the Works A/13D D Insurance A/13E Minimum indemnity limit for Public liability insurance: €6,500,000 A/13F Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event; d project supervisor for the construction stage for the Works 1 Item F DInsurance 1 Item G Minimum indemnity limit for Public liability insurance: €6,500,000 1 Item H Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event
  • Past experience — The Contractor IS to be appointed project supervisor for the construction stage for the Works A/13D D Insurance A/13E Minimum indemnity limit for Public liability insurance: €6,500,000 A/13F Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event; d project supervisor for the construction stage for the Works 1 Item F DInsurance 1 Item G Minimum indemnity limit for Public liability insurance: €6,500,000 1 Item H Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • The Contractor IS to be appointed project supervisor for the construction stage for the Works A/13D D Insurance A/13E Minimum indemnity limit for Public liability insurance: €6,500,000 A/13F Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event
  •  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be
  •  Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event
  •  Maximum excess for Public liability: €10,00010 in respect of property damage only
  • If required, the minimum indemnity limit for professional indemnity insurance shall be €2,500,000 annual aggregate limit

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • athered during a site visit carried out on 22nd January 2024
  • [Letter to Tendering Contractors.pdf] Our ref. EP/3842
  • You are invited to submit a competitive tender for the above works as
  • Questionnaire) and sign and return the declaration accordingly.
  • Your tenders should be returned through the e-tender portal on or before

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-05-19T12:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-05-19T12:00:00+00:00
Date surfaced in documents 00 Sep 2024
Date surfaced in documents August 2024
Date surfaced in documents Sep 2024

8. Contract terms that matter

Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • Minimum amount for interim payments, except release of retention, € 10,000.00 14
  • PMD installed in distribution board door shall have a minimum rating of IP40
  • The CCTV equipment shall have a minimum 5 year warranty
  • The units shall have a minimum ingress rating of IP55
  • DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 545
  • PE PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 12201:2011
  • terms and conditions of the Public Works Contract for Building Works

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Letter to Tendering Contractors.pdf, CSAGR-CJFA-X1-00-DR-A-0240.pdf, CSAGR-MOR-X3-L00-DR-SE-2400 - Proposed ESB Building.pdf.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: CSAGR CJFA ZZ 00 DR A 0652.pdf, CSAGR-XX-62-XX-L01-DR-DCCE-EE-12002.pdf, CSAGR-XX-61-XX-XXX-DR-DCCE-EE-70003.pdf.

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001

Public liability insurance

€6,500,000

Professional indemnity insurance

€2,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Construction of Metabolism Building

Construction of a metabolism building at Teagasc Moorepark facility, adhering to DAFM standards.

Documents (285)

DOCX

Incorporation of Low-Carbon Construction Materials and Practices.docx

15.4 KB · Specification

PDF

Letter to Tendering Contractors.pdf

85.6 KB · Contract / Agreement / Terms

PDF

01. TENDER QUERY RESPONSE.pdf

59.2 KB

XLSX

05. Meta Unit - Pricing Document.xlsx

72.0 KB

DOC

2. pbu_suitability_small_works.doc

79.0 KB

PDF

2. pbu_suitability_small_works.pdf

167.7 KB

PDF

2023010 Design Risk Assessment - Tender.pdf

756.8 KB

PDF

2023010 Drawing Issue Register - Animal Nutrition Tender.pdf

286.8 KB

PDF

2023010 Drawing Issue Register - Tender.pdf

492.7 KB

PDF

2023010 Prelim H and S Plan.pdf

2.6 MB

PDF

20241116_Decision to GRANT.pdf

358.4 KB

PDF

2025_01_29 - CS Specification (Animal Metabolism Building).pdf

407.6 KB

PDF

AF1 - CR110255.pdf

35.7 KB

DOCX

C4245 - Clarifications.docx

47.9 KB · Clarification / Addendum

PDF

CSAGR CJFA X2 00 DR A 0210.pdf

835.7 KB

PDF

CSAGR CJFA X2 00 DR A 0211.pdf

675.0 KB

PDF

CSAGR CJFA X2 00 DR A 0310.pdf

479.3 KB

PDF

CSAGR CJFA X2 00 DR A 0410.pdf

256.7 KB

PDF

CSAGR CJFA X2 00 DR A 0510.pdf

239.7 KB

PDF

CSAGR CJFA X3 00 DR A 0220.pdf

385.8 KB

PDF

CSAGR CJFA ZZ 00 DR A 0600.pdf

351.4 KB

PDF

CSAGR CJFA ZZ 00 DR A 0601.pdf

283.8 KB

PDF

CSAGR CJFA ZZ 00 DR A 0602.pdf

383.4 KB

PDF

CSAGR CJFA ZZ 00 DR A 0603.pdf

287.4 KB

PDF

CSAGR CJFA ZZ 00 DR A 0604.pdf

344.4 KB

PDF

CSAGR CJFA ZZ 00 DR A 0605.pdf

315.5 KB

PDF

CSAGR CJFA ZZ 00 DR A 0606.pdf

309.6 KB

PDF

CSAGR CJFA ZZ 00 DR A 0607.pdf

221.3 KB

PDF

CSAGR CJFA ZZ 00 DR A 0608.pdf

239.7 KB

PDF

CSAGR CJFA ZZ 00 DR A 0609.pdf

281.9 KB

PDF

CSAGR CJFA ZZ 00 DR A 0610.pdf

262.9 KB

PDF

CSAGR CJFA ZZ 00 DR A 0611.pdf

248.1 KB

PDF

CSAGR CJFA ZZ 00 DR A 0612.pdf

171.2 KB

PDF

CSAGR CJFA ZZ 00 DR A 0613.pdf

265.9 KB

PDF

CSAGR CJFA ZZ 00 DR A 0614.pdf

198.0 KB

PDF

CSAGR CJFA ZZ 00 DR A 0615.pdf

191.6 KB

PDF

CSAGR CJFA ZZ 00 DR A 0616.pdf

172.1 KB

PDF

CSAGR CJFA ZZ 00 DR A 0617.pdf

215.6 KB

PDF

CSAGR CJFA ZZ 00 DR A 0618.pdf

181.4 KB

PDF

CSAGR CJFA ZZ 00 DR A 0619.pdf

246.2 KB

PDF

CSAGR CJFA ZZ 00 DR A 0620.pdf

261.8 KB

PDF

CSAGR CJFA ZZ 00 DR A 0621.pdf

198.6 KB

PDF

CSAGR CJFA ZZ 00 DR A 0622.pdf

181.5 KB

PDF

CSAGR CJFA ZZ 00 DR A 0623.pdf

176.3 KB

PDF

CSAGR CJFA ZZ 00 DR A 0625.pdf

393.8 KB

PDF

CSAGR CJFA ZZ 00 DR A 0626.pdf

298.5 KB

PDF

CSAGR CJFA ZZ 00 DR A 0627.pdf

1.2 MB

PDF

CSAGR CJFA ZZ 00 DR A 0628.pdf

240.9 KB

PDF

CSAGR CJFA ZZ 00 DR A 0629.pdf

195.0 KB

PDF

CSAGR CJFA ZZ 00 DR A 0630.pdf

169.1 KB

PDF

CSAGR CJFA ZZ 00 DR A 0631.pdf

172.3 KB

PDF

CSAGR CJFA ZZ 00 DR A 0632.pdf

171.2 KB

PDF

CSAGR CJFA ZZ 00 DR A 0633.pdf

180.4 KB

PDF

CSAGR CJFA ZZ 00 DR A 0634.pdf

175.0 KB

PDF

CSAGR CJFA ZZ 00 DR A 0635.pdf

174.5 KB

PDF

CSAGR CJFA ZZ 00 DR A 0636.pdf

175.1 KB

PDF

CSAGR CJFA ZZ 00 DR A 0637.pdf

239.0 KB

PDF

CSAGR CJFA ZZ 00 DR A 0638.pdf

161.2 KB

PDF

CSAGR CJFA ZZ 00 DR A 0639.pdf

194.8 KB

PDF

CSAGR CJFA ZZ 00 DR A 0640.pdf

247.7 KB

PDF

CSAGR CJFA ZZ 00 DR A 0641.pdf

160.1 KB

PDF

CSAGR CJFA ZZ 00 DR A 0642.pdf

655.6 KB

PDF

CSAGR CJFA ZZ 00 DR A 0643.pdf

382.6 KB

PDF

CSAGR CJFA ZZ 00 DR A 0650.pdf

229.1 KB

PDF

CSAGR CJFA ZZ 00 DR A 0651.pdf

199.2 KB

PDF

CSAGR CJFA ZZ 00 DR A 0652.pdf

193.5 KB

PDF

CSAGR CJFA ZZ 00 DR A 0653.pdf

207.1 KB

PDF

CSAGR CJFA ZZ 00 DR A 0654.pdf

152.6 KB

PDF

CSAGR CJFA ZZ 00 DR A 0655.pdf

198.7 KB

PDF

CSAGR CJFA ZZ 00 DR A 0660.pdf

156.1 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0200.pdf

2.0 MB

PDF

CSAGR-CJFA-X1-00-DR-A-0220.pdf

1.9 MB

PDF

CSAGR-CJFA-X1-00-DR-A-0230.pdf

701.4 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0240.pdf

3.2 MB

PDF

CSAGR-CJFA-X1-00-DR-A-0800.pdf

564.2 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0801.pdf

706.8 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0802.pdf

536.7 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0803.pdf

739.9 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0804.pdf

659.1 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0805.pdf

677.1 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0806.pdf

688.5 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0807.pdf

668.8 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0808.pdf

783.7 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0809.pdf

657.8 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0810.pdf

574.8 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0811.pdf

636.6 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0812.pdf

531.7 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0813.pdf

447.8 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0814.pdf

850.6 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0815.pdf

683.9 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0816.pdf

607.0 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0817.pdf

903.2 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0818.pdf

766.6 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0819.pdf

595.9 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0820.pdf

447.4 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0821.pdf

479.3 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0822.pdf

483.7 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0823.pdf

1.1 MB

PDF

CSAGR-CJFA-X1-00-DR-A-0824A.pdf

396.5 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0824B.pdf

792.4 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0825A.pdf

409.0 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0825B.pdf

765.3 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0826.pdf

509.0 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0827A.pdf

355.5 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0827B.pdf

458.0 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0828.pdf

1.0 MB

PDF

CSAGR-CJFA-X1-00-DR-A-0829.pdf

716.7 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0830.pdf

750.5 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0850.pdf

385.5 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0851.pdf

389.5 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0852A.pdf

450.8 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0852B.pdf

542.0 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0853.pdf

465.5 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0854A.pdf

380.3 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0854B.pdf

577.8 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0855A.pdf

310.2 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0855B.pdf

549.8 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0856A.pdf

357.6 KB

PDF

CSAGR-CJFA-X1-00-DR-A-0856B.pdf

594.5 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0201.pdf

1.7 MB

PDF

CSAGR-CJFA-X1-01-DR-A-0831.pdf

580.0 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0832.pdf

533.9 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0833.pdf

432.4 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0834.pdf

452.2 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0835.pdf

759.7 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0836.pdf

784.9 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0837.pdf

557.3 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0838.pdf

639.0 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0839.pdf

611.3 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0840.pdf

1.1 MB

PDF

CSAGR-CJFA-X1-01-DR-A-0841.pdf

487.5 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0842.pdf

1.1 MB

PDF

CSAGR-CJFA-X1-01-DR-A-0843.pdf

917.0 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0844.pdf

1.0 MB

PDF

CSAGR-CJFA-X1-01-DR-A-0845.pdf

508.8 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0857.pdf

551.8 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0858A.pdf

374.3 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0858B.pdf

460.7 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0859.pdf

585.5 KB

PDF

CSAGR-CJFA-X1-01-DR-A-0860.pdf

628.3 KB

PDF

CSAGR-CJFA-X1-02-DR-A-0202.pdf

1017.2 KB

PDF

CSAGR-CJFA-X1-02-DR-A-0846.pdf

380.7 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0203.pdf

1.0 MB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0231.pdf

414.1 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0241.pdf

2.8 MB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0300.pdf

1.2 MB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0301.pdf

1.5 MB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0302.pdf

1.3 MB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0400.pdf

1.7 MB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0401.pdf

819.3 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0500.pdf

193.0 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0501.pdf

192.6 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0502.pdf

131.1 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0505.pdf

223.2 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0506.pdf

143.0 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0509.pdf

113.3 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0510.pdf

502.7 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0511.pdf

421.0 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0514.pdf

127.9 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0550.pdf

328.3 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0551.pdf

327.5 KB

PDF

CSAGR-CJFA-X1-ZZ-DR-A-0552.pdf

361.4 KB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0101.pdf

4.5 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0102.pdf

1.2 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0106.pdf

6.3 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0107.pdf

3.9 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0108.pdf

2.2 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0109.pdf

2.2 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0110.pdf

2.2 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0111.pdf

2.2 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0115.pdf

6.3 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0116.pdf

2.1 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0117.pdf

2.1 MB

PDF

CSAGR-CJFA-ZZ-00-DR-A-0120.pdf

3.3 MB

PDF

CSAGR-MOR-X1-01-DR-SE-2002 - G.A. - Proposed First Floor Layout.pdf

638.6 KB

PDF

CSAGR-MOR-X1-F0-DR-SE-2000 - G.A. - Proposed Foundation Layout.pdf

236.6 KB

PDF

CSAGR-MOR-X1-R0-DR-SE-2003 - G.A. - Proposed Roof Layout.pdf

387.5 KB

PDF

CSAGR-MOR-X1-ZZ-DR-SE-3000 - Typical Cross Sections - Sheet 1.pdf

282.0 KB

PDF

CSAGR-MOR-X1-ZZ-DR-SE-3001 - Typical Cross Sections - Sheet 2.pdf

278.7 KB

PDF

CSAGR-MOR-X1-ZZ-DR-SE-3002 - Typical Cross Sections - Sheet 3.pdf

106.3 KB

PDF

CSAGR-MOR-X1-ZZ-DR-SE-4000 - G.A. - Elevations Grid Line E & H.pdf

141.0 KB

PDF

CSAGR-MOR-X1-ZZ-IS-SE-00000_Metabolism Building Tender Drawing Register.pdf

173.3 KB

PDF

CSAGR-MOR-X2-F00-DR-SE-2350 - Proposed Foundation Layout .pdf

461.2 KB

PDF

CSAGR-MOR-X2-L00-DR-SE-2351 - Proposed Ground Floor Layout.pdf

622.7 KB

PDF

CSAGR-MOR-X2-L00-DR-SE-2352 - Proposed Sump Floor Slab Layout.pdf

774.2 KB

PDF

CSAGR-MOR-X2-L00-DR-SE-5350 - Ground Floor Sections Sheet 1.pdf

570.9 KB

PDF

CSAGR-MOR-X2-L00-DR-SE-5351 - Ground Floor Sections Sheet 2.pdf

540.5 KB

PDF

CSAGR-MOR-X2-L00-DR-SE-5352 - Ground Floor Sections Sheet 3.pdf

406.3 KB

PDF

CSAGR-MOR-X2-L00-DR-SE-5353 - Ground Floor Sections Sheet 4.pdf

548.9 KB

PDF

CSAGR-MOR-X2-R00-DR-SE-2353 - Proposed Roof Layout.pdf

398.3 KB

PDF

CSAGR-MOR-X2-ZZZ-DR-SE-4350 - Proposed Elevations.pdf

1.1 MB

PDF

CSAGR-MOR-X3-L00-DR-SE-2400 - Proposed ESB Building.pdf

1.1 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1005- Existing Site Survey.pdf

827.0 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1006- Existing Drainage Layout.pdf

614.9 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1007A- Proposed Site Clearance Layout.pdf

1.1 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1007B- Proposed Site Clearance Layout.pdf

1.1 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1008A- Drainage Layout - Proposed Drainage Diversions.pdf

984.1 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1010A- Proposed Site Layout.pdf

1.2 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1010B- Proposed Site Layout.pdf

1.1 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1011A- Proposed Yard Slab Layout.pdf

1.1 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1011B- Proposed Yard Slab Layout.pdf

1007.2 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1015A- Proposed Services - Surface Water Drainage Layout.pdf

1.1 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1016- Proposed Services -Foul Drainage Layout.pdf

653.1 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1016A- Proposed Services -Foul Drainage Layout.pdf

1.0 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1017A- Proposed Services -Watermains Layout.pdf

809.3 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1017B- Proposed Services -Watermains Layout.pdf

784.2 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1200 -Existing Site Sections.pdf

237.7 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1500 - Site Development Details Sheet 1.pdf

1.2 MB

PDF

CSAGR-MOR-XX-XX-DR-CE-1501 - Site Development Details Sheet 2.pdf

606.7 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1502 - Site Development Details Sheet 3.pdf

458.5 KB

PDF

CSAGR-MOR-XX-XX-DR-CE-1503 - Site Development Details Sheet 4.pdf

596.1 KB

PDF

CSAGR-XX-56-XX-L01-DR-DCCE-ME-11002.pdf

170.0 KB

PDF

CSAGR-XX-56-XX-L02-DR-DCCE-ME-11003.pdf

174.6 KB

PDF

CSAGR-XX-58-XX-L02-DR-DCCE-ME-10003.pdf

323.7 KB

PDF

CSAGR-XX-61-XX-L00-DR-DCCE-EE-15001.pdf

190.2 KB

PDF

CSAGR-XX-61-XX-L00-DR-DCCE-EE-15004.pdf

448.6 KB

PDF

CSAGR-XX-61-XX-L01-DR-DCCE-EE-15002.pdf

178.3 KB

PDF

CSAGR-XX-61-XX-L02-DR-DCCE-EE-15003.pdf

148.3 KB

PDF

CSAGR-XX-61-XX-XXX-DR-DCCE-EE-70001.pdf

237.0 KB

PDF

CSAGR-XX-61-XX-XXX-DR-DCCE-EE-70002.pdf

229.3 KB

PDF

CSAGR-XX-61-XX-XXX-DR-DCCE-EE-70003.pdf

264.7 KB

PDF

CSAGR-XX-61-XX-XXX-DR-DCCE-EE-70004.pdf

88.5 KB

PDF

CSAGR-XX-62-XX-L00-DR-DCCE-EE-12001.pdf

458.4 KB

PDF

CSAGR-XX-62-XX-L00-DR-DCCE-EE-12004.pdf

581.3 KB

PDF

CSAGR-XX-62-XX-L00-DR-DCCE-EE-16011.pdf

461.2 KB

PDF

CSAGR-XX-62-XX-L01-DR-DCCE-EE-12002.pdf

355.3 KB

PDF

CSAGR-XX-62-XX-L01-DR-DCCE-EE-16012.pdf

394.9 KB

PDF

CSAGR-XX-62-XX-L02-DR-DCCE-EE-12003.pdf

101.9 KB

PDF

CSAGR-XX-62-XX-L02-DR-DCCE-EE-16013.pdf

130.5 KB

PDF

CSAGR-XX-62-XX-ZZ-DR-DCCE-EE-90000.pdf

883.6 KB

PDF

CSAGR-XX-62-XX-ZZ-DR-DCCE-EE-90001.pdf

454.4 KB

PDF

CSAGR-XX-62-XX-ZZ-DR-DCCE-EE-90002.pdf

830.7 KB

PDF

CSAGR-XX-63-XX-B01-DR-DCCE-EE-11005.pdf

565.7 KB

PDF

CSAGR-XX-63-XX-L00-DR-DCCE-EE-11001.pdf

490.7 KB

PDF

CSAGR-XX-63-XX-L00-DR-DCCE-EE-11004.pdf

585.1 KB

PDF

CSAGR-XX-63-XX-L01-DR-DCCE-EE-11002.pdf

360.6 KB

PDF

CSAGR-XX-63-XX-L02-DR-DCCE-EE-11003.pdf

80.2 KB

PDF

CSAGR-XX-65-XX-L00-DR-DCCE-EE-13001.pdf

139.7 KB

PDF

CSAGR-XX-65-XX-L00-DR-DCCE-EE-13004.pdf

591.2 KB

PDF

CSAGR-XX-65-XX-L00-DR-DCCE-EE-14001.pdf

421.6 KB

PDF

CSAGR-XX-65-XX-L01-DR-DCCE-EE-13002.pdf

130.2 KB

PDF

CSAGR-XX-65-XX-L01-DR-DCCE-EE-14002.pdf

140.6 KB

PDF

CSAGR-XX-65-XX-L02-DR-DCCE-EE-13003.pdf

106.2 KB

PDF

CSAGR-XX-68-XX-L00-DR-DCCE-EE-16002.pdf

623.8 KB

PDF

CSAGR-XX-68-XX-L05-DR-DCCE-EE-16001.pdf

368.5 KB

PDF

CSAGR-XX-XX-IS-DCCE-00001 Grasslands.pdf

280.3 KB

PDF

CSAGR-XX-XX-IS-DCCE-EM-00002.pdf

274.4 KB

PDF

CSAGR-XX-XX-SH-DCCE-EE-00002.pdf

893.7 KB

PDF

CSAGR-XX-XX-SP-DCCE-EE-00004.pdf

856.5 KB

PDF

CSAGR-XX-XX-SP-DCCE-EE-00005.pdf

979.3 KB

PDF

CSAGR-XXX-52-XX-L00-DR-DCCE-ME-14001.pdf

428.6 KB

PDF

CSAGR-XXX-52-XX-L01-DR-DCCE-ME-14002.pdf

358.3 KB

PDF

CSAGR-XXX-52-XX-L02-DR-DCCE-ME-14003.pdf

112.0 KB

PDF

CSAGR-XXX-53-XX-L00-DR-DCCE-ME-13001.pdf

729.8 KB

PDF

CSAGR-XXX-53-XX-L01-DR-DCCE-ME-13002.pdf

974.9 KB

PDF

CSAGR-XXX-53-XX-L02-DR-DCCE-ME-13003.pdf

287.5 KB

PDF

CSAGR-XXX-53-ZZ-ZZ-SC-DCCE-ME -03001.pdf

209.6 KB

PDF

CSAGR-XXX-54-XX-L00-DR-DCCE-ME-15001.pdf

528.4 KB

PDF

CSAGR-XXX-54-XX-L01-DR-DCCE-ME-15002.pdf

160.1 KB

PDF

CSAGR-XXX-54-ZZ-ZZ-SC-DCCE-ME-05001.pdf

192.3 KB

PDF

CSAGR-XXX-55-XX-L00-DR-DCCE-ME-17001.pdf

204.0 KB

PDF

CSAGR-XXX-55-XX-L01-DR-DCCE-ME-17002.pdf

132.7 KB

PDF

CSAGR-XXX-55-XX-L02-DR-DCCE-ME-17003.pdf

143.6 KB

PDF

CSAGR-XXX-55-ZZ-ZZ-SC-DCCE-ME-07001.pdf

217.9 KB

PDF

CSAGR-XXX-56-XX-L00-DR-DCCE-ME-11001.pdf

454.3 KB

PDF

CSAGR-XXX-56-ZZ-ZZ-SC-DCCE-ME -01001.pdf

267.1 KB

PDF

CSAGR-XXX-57-XX-L00-DR-DCCE-ME-12001.pdf

667.4 KB

PDF

CSAGR-XXX-57-XX-L01-DR-DCCE-ME-12002.pdf

572.3 KB

PDF

CSAGR-XXX-57-XX-L02-DR-DCCE-ME-12003.pdf

133.2 KB

PDF

CSAGR-XXX-57-XX-XXX-DR-DCCE-ME-02001.pdf

183.2 KB

PDF

CSAGR-XXX-57-XX-XXX-DR-DCCE-ME-02002.pdf

173.3 KB

PDF

DOAF&M S.100.pdf

404.9 KB

PDF

DOAF&M S.101.pdf

645.3 KB

PDF

DOAF&M S.101A.pdf

113.1 KB

PDF

DOAF&M S.101C.pdf

103.9 KB

PDF

DOAF&M S.101D.pdf

485.1 KB

PDF

DOAF&M S.102.pdf

245.2 KB

PDF

DOAF&M S.124.pdf

208.0 KB

PDF

DOAF&M S.124A.pdf

82.4 KB

PDF

FTS-2-v2.6-09-01-2025.pdf

486.2 KB

PDF

ITT-W2-v3.0-18-11-24-23-01-25.pdf

437.5 KB

PDF

Notes on Drawings.pdf

125.7 KB

OTHER

plot.log

1.5 KB

PDF

Preliminary Requirements.pdf

332.9 KB

PDF

Volume C - Pricing Schedule.pdf

384.0 KB

Original notice text

This tender involves the construction of a new metabolism building at Teagasc Moorepark, including the integration and operation of specified service systems with compliance reporting and handover obligations.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

19 May

View on eTenders ↗

Location

Teagasc Moorepark facility

Procedure

Open

Clarification

22 Apr 2025

eTenders ID

5422927

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender