Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / SCC2025/0021 N4 Inner Relief Road - Pavement Resurfacing Contract 2025
Awarded Construction & Civil Engineering Works Open

SCC2025/0021 N4 Inner Relief Road - Pavement Resurfacing Contract 2025

Deadline

04 Apr

Pavement resurfacing contract for N4 Inner Relief Road by Sligo County Council

SME fit: Medium Bid effort: Medium 📍 Sligo

Pavement resurfacing contract for N4 Inner Relief Road by Sligo County Council

Bidder profile

Ideal for firms experienced in public works and pavement projects with strong compliance and documentation capabilities.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Sligo County Council
Title SCC2025/0021 N4 Inner Relief Road - Pavement Resurfacing Contract 2025
CPV / category works / Construction & Civil Engineering
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2025-04-04T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for SCC2025/0021 N4 Inner Relief Road - Pavement Resurfacing Contract 2025. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Sligo County Council.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: 1 18-11-2024 Turnover Requirement Area of Business/Work: Minimum Average Yearly Turnover arising from the area of work specified: Directly related to Pavement Sufacing and Associated Minor works15 € 3 million (excluding VAT) The Tenderer shall hav; e a minimum average yearly turnover, directly related to pavment surfacing and associated minor works, of not less than €3.0 million (excluding VAT) for the 3 most recently; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € 17

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — Turnover Requirement Area of Business/Work: Minimum Average Yearly Turnover arising from the area of work specified: Directly related to Pavement Sufacing and Associated Minor works15 € 3 m

  • Insurance

  • Public Liability — €6,500,00019M

  • Employer's Liability — €13,000,00020

  • Professional Indemnity — €17

  • Certifications — not specified for this tender

  • Past experience — not specified for this tender

  • Personnel — not specified for this tender

  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: 1 18-11-2024 Turnover Requirement Area of Business/Work: Minimum Average Yearly Turnover arising from the area of work specified: Directly related to Pavement Sufacing and Associated Minor works15 € 3 million (excluding VAT) The Tenderer shall hav; e a minimum average yearly turnover, directly related to pavment surfacing and associated minor works, of not less than €3.0 million (excluding VAT) for the 3 most recently; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € 17

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2025-04-04T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): Instructions to Tenderers.pdf, l A Work Requirements 2023.docx
  • eTenders CFT ID: not stated
  • Clarification contact / portal: eTenders clarification portal
  • Priority attachments: Instructions to Tenderers.pdf, l A Work Requirements 2023.docx

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€3,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€17

Scoring

Most Economically Advantageous Tender

Documents (84)

PDF

01_N4 Inner Relief Road Sligo.pdf

31.1 KB

PDF

02_N4 Inner Relief Road Sligo.pdf

40.8 KB

PDF

03_N4 Inner Relief Road Sligo.pdf

111.8 KB

PDF

05_N4 Inner Relief Road Sligo.pdf

105.2 KB

PDF

06_N4 Inner Relief Road Sligo.pdf

70.8 KB

PDF

20230822-023_A0.pdf

2.6 MB

PDF

23.076 TII N4 Inner Relief Road Co. Sligo Corelog Report October 2023 v1.1.pdf

855.1 KB

PDF

2618_21082023105718.pdf

1.9 MB

PDF

2618_21082023110434.pdf

2.1 MB

PDF

3.4.1-HS-Works-Contractor-v3.0-28-07-2023 pdf.pdf

855.0 KB

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx

47.3 KB

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

44.1 KB

PDF

3.4.2-HS-PSCS-v3.0-28-07-2023.pdf

978.5 KB

PDF

_ags_3ccd2e784265412b91302bd07c350677.pdf

1.8 MB

PDF

_ags_ce1edbe05f274b4a8819585ea3bede0b.pdf

1.7 MB

PDF

AF1.pdf

36.1 KB

DOCX

Appendix 1 Forms of Letters of Undertaking_Declarations.docx

36.0 KB

PDF

Appendix 3(b)(ii) Preliminary TTMP Templates pdf.pdf

1.4 MB

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

38.8 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

32.2 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

27.1 KB

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

26.3 KB

DOCX

Appendix-C-Bankers-Letter.docx

30.9 KB

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond (1).docx

27.7 KB

DOCX

Appendix-F-Declaration-in-relation-to-Russian-Sanctions.docx

24.9 KB

DOCX

Appendix-G-Declaration-re-International-Procurement-Instrument (1).docx

23.3 KB

XLSX

BOQ N4 IRR Information Pack.xlsx

701.8 KB

PDF

emap (1).pdf

329.0 KB

PDF

emap (2).pdf

741.6 KB

PDF

emap (3).pdf

741.6 KB

PDF

emap (5).pdf

388.6 KB

PDF

emap.pdf

221.3 KB

DOCX

Enet.docx

2.0 MB

PDF

enet_network_report_45980.pdf

2.5 MB

PDF

enet_network_report_45981.pdf

2.8 MB

PDF

enet_network_report_45982.pdf

2.4 MB

PDF

ESB Construction Safety 28th 11.40.pdf

803.2 KB

DOC

Form No.3(d) Appointment Acceptance PSCS (4).doc

77.0 KB

PDF

Further Information Drawings.pdf

12.9 MB

PDF

Instructions to Tenderers.pdf

1.7 MB

PDF

Invitation to Tender.pdf

786.3 KB

DOCX

MF-1.10-09-04-2020.docx

53.9 KB

DOCX

MF-1.13-09-04-2020.docx

48.9 KB

DOCX

MF-1.14-09-04-2020.docx

57.8 KB

DOCX

MF-1.15-09-04-2020.docx

50.3 KB

DOCX

MF-1.16-21-03-2016-REV.docx

56.9 KB

DOCX

MF-1.17-09-12-2019-REV.docx

36.7 KB

DOCX

MF-1.4-03-08-2010-rev.docx

53.1 KB

DOCX

MF-1.6-09-04-2020.docx

58.4 KB

PDF

N4 Inner Relief Resurfacing Contract Drawings 2025.pdf

32.6 MB

PDF

N4 IRR Management of Invasive Species pdf.pdf

776.7 KB

OTHER

plot.log

1.9 KB

PDF

PO 1032 N4 IRR Pavement Resurfacing Contract 2025 Preliminary Traffic Management Plan.pdf

3.7 MB

PDF

PO 1032 N4-PRE-TTM-01 Inner relief road Traffic Management Maps.pdf

3.5 MB

PDF

PO 1032 N4-PRE-TTM-02 Inner relief road Traffic Management Maps.pdf

4.6 MB

PDF

PO 1032 N4-PRE-TTM-03 Inner Relief Road Traffic Management Maps.pdf

726.6 KB

PDF

PO 1032 N4-PRE-TTM-04 Inner Relief Road Traffic Management Maps.pdf

627.4 KB

PDF

PO 1032 N4-PRE-TTM-05 Inner Relief Road Traffic Management Maps.pdf

657.6 KB

PDF

PO 1032 N4-PRE-TTM-06 Inner Relief Road Traffic Management Maps.pdf

839.5 KB

PDF

PO 1032 N4-T-00-07-01 N4 Inner Relief Rd.Topo.pdf

312.6 KB

PDF

PO 1032 N4-T-00-07-02 N4 Inner Relief Rd.Topo.pdf

320.2 KB

PDF

PO 1032 N4-T-00-07-03 - N4 Inner Relief Rd.Topo.pdf

1.0 MB

PDF

PO 1032 N4-T-00-07-04 N4 Inner Relief Rd.Topo.pdf

831.5 KB

PDF

PO 1032 N4-T-00-07-05 N4 Inner Relief Rd.Topo.pdf

327.5 KB

PDF

PO 1032 N4-T-00-07-06 N4 Inner Relief Rd.Topo.pdf

343.2 KB

PDF

PO 1032 N4-T-00-07-07 N4 Inner Relief Rd.Topo.pdf

321.9 KB

PDF

PO 1032 N4-T-00-07-08 N4 Inner Relief Rd.Topo.pdf

315.2 KB

PDF

PO 1032 N4-T-00-07-09 N4 Inner Relief Rd.Topo.pdf

365.0 KB

PDF

PO 1032 N4-T-00-07-10 N4 Inner Relief Rd.Topo.pdf

352.4 KB

PDF

PW-CF5-v2.7-17-07-2023-1.pdf

1.2 MB

DOCX

QW-Part-2-v1.1-18-11-2024.docx

58.3 KB

PDF

QW-Part-2-v1.1-18-11-2024.pdf

947.9 KB

PDF

QW2-Part-1-v2.1-18-11-2024 (1) pdf.pdf

1.4 MB

DOCX

QW2-Part-1-v2.1-18-11-2024 (1).docx

197.8 KB

PDF

Rev 10 Form No.4(a) Design Risk Assessment N4 Inner Relief Road Pavement Resurfacing Contract 2025.pdf

403.4 KB

PDF

REV 10 SMS Appendix 3(a) (Preliminary Health and Safety Plan Template) N4 IRR Pavement Resurfacing Contract 2025.pdf

641.8 KB

PDF

Supplementary Information.pdf

80.9 KB

PDF

TI23F159-160 TII N4 Inner Relief Road Sligo FWD Level 1 Analysis Report June 2023 v1.1.pdf

8.3 MB

PDF

TI23F159-160 TII N4 Inner Relief Road Sligo FWD Level 2 Analysis Report June 2023.pdf

823.4 KB

PDF

TI23GB106 TII N4 Inner Relief Road Sligo GPR Analysis Report.pdf

2.1 MB

PDF

Vol A Work Requirements.pdf

2.2 MB

PDF

Volume B Tender and Schedule.pdf

1.2 MB

PDF

Volume C Pricing Document.pdf

1.4 MB

DOCX

~$l A Work Requirements 2023.docx

162 bytes

Original notice text

This tender involves the pavement resurfacing of the N4 Inner Relief Road, requiring compliance with public procurement standards and documentation.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

04 Apr

View on eTenders ↗

Location

N4 Inner Relief Road

Procedure

Open

Clarification

31 Mar 2025

eTenders ID

5277917

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender