Tipperary County Council - Demolition of Existing and Construction New Single-Storey Dwelling at Monaraheen, Two Mile Borris, Thurles, Co. Tipperary
Deadline
16 Apr
16 Apr 2025
Deadline
16 Apr
Demolition and construction of a new single-storey dwelling in Tipperary.
Demolition and construction of a new single-storey dwelling in Tipperary.
Bidder profile
Ideal for mid-sized to large firms with public sector experience and compliance capabilities.
Risks & flags
- Undisclosed contract value
- Qualification gate for turnover
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Tipperary County Council |
| Title | Tipperary County Council _ Demolition of Existing and Construction New Single-Storey Dwelling at Monaraheen, Two Mile Borris, Thurles, Co. Tipperary |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 6 months |
| Submission deadline | 2025-04-16T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Tipperary County Council ran this procurement for “Tipperary County Council _ Demolition of Existing and Construction New Single-Storey Dwelling at Monaraheen, Two Mile Borris, Thurles, Co. Tipperary” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- All treatment systems must be compliant with ##en 12566 Part 3 or 6 and meet
- ame of Public/Group Scheme Water Supply within 1 km:
- Group Scheme Water Supply within 1 km:
- VALUE Construction contract value at award stage (including cost of services where applicable): Applicant Entry Construction contract value at completion (including cost of services where applicable: Applicant Entry
-
- Payment for the Project Supervisor’s service is provided for under the Contract. Accordingly, the Client is not liable under this Agreement for the Project Supervisor’s fees or expenses.
- Provide a list of completed projects below for which select as appropriate: Works/Works and PSCS Services/Specialist Works/Specialist Works with Design Input were provided by the Applicant over the time period stated in the relevant Qualification Criterion stated above that are similar in nature and complexity to the Works required for this Competition.
- 225X75 C16 TIMBER PURLIN SUPPORTED BY
- STEEL BEAM TO BE SUPPORTED BY WALL BUILT
- the existing services within the work zone before commencement of the works.
- etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Title: Tipperary County Council _ Demolition of Existing and Construction New Single-Storey Dwelling at Monaraheen, Two Mile Borris, Thurles, Co. Tipperary
- Regarding: Demolition of an existing dwelling and Construction of new single storey dwelling with associated site works at Monaraheen, Two Mile Borris, Thurles, Co. Tipperary, E41 N9P6
- the existing services within the work zone before commencement of the works.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ) Minimum indemnity limit for employer’s liability insurance €13m for any one event 10; 4 Maximum levels of excess for insurance of the Works and goods and materials for the Works € public liability €6,5009 employer’s liability €6,50010 7 If no percentage specified, 10% applie
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- ) Minimum indemnity limit for employer’s liability insurance €13m for any one event 10
- 4 Maximum levels of excess for insurance of the Works and goods and materials for the Works € public liability €6,5009 employer’s liability €6,50010 7 If no percentage specified, 10% applie
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| We have bond facilities in place which would enable us to act as sureties on you | not stated | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
- This project number must correspond to the project number given in Appendix B1
- This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a Certifi
- [Appendix B2 (Project Execution).docx] APPENDIX B2: CERTIFICATE OF SATISFACTORY PROJECT EXECUTION[1]
- [Appendix B2 (Project Execution).docx] Applicant in delivery of Project: Applicant Entry
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2025-04-16T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2025-04-16T11:00:00+00:00 |
| Date surfaced in documents | Act 2005 |
| Date surfaced in documents | Regulations 2013 |
8. Contract terms that matter
Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- Title: Tipperary County Council _ Demolition of Existing and Construction New Single-Storey Dwelling at Monaraheen, Two Mile Borris, Thurles, Co. Tipperary
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- The liability of the Surety under this Bond will not exceed € . This amount will be reduced by half on issue of the Certificate of Substantial
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
- the same terms as the insurances the Contractor is required to have under clause 10
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
- the Works within 12 months after the termination, the Contractor’s payment under this clause
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Appendix B2 (Project Execution).docx, 24 Windows (B) A3.pdf, Appendix D1 (Surety Company 1).docx.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: 25 Doors (A) A3.pdf, 2 Site Location Plan A3.pdf, TR-200 - Foundation Plan.pdf.
This tender has been awarded
- Presto construction ltd · 08 Aug 2025
- Presto construction ltd · 08 Aug 2025
Can you bid?
Required certifications
- Safe-T-Cert
- en 12566
Public liability insurance
€6,500,000
Named standards / methodologies
Scoring
Lowest Price
Documents (50)
1 Schedule of Drawings A3.pdf
37.2 KB
1. Site Suitability Assessment Report.pdf
3.5 MB
10 Roof Layout Plan A3.pdf
247.3 KB
11 Roof Structure Plan A3.pdf
237.4 KB
12 Electrical Layout A3.pdf
309.3 KB
13 Heating Layout A3.pdf
344.8 KB
14 Elevations (A) A3.pdf
176.6 KB
15 Elevations (B) A3.pdf
172.1 KB
16 Building Section A2.pdf
761.5 KB
17 Detail No.1 A3.pdf
348.7 KB
18 Detail No.2 A3.pdf
233.4 KB
19 Detail No.3 A3.pdf
309.3 KB
2 Site Location Plan A3.pdf
397.5 KB
2. Asbestos Report on Dwelling.pdf
1.9 MB
2. QW2_Supplement_3.4.1 Health and Safety A.docx
47.4 KB
20 Detail No.4 & 5 A3.pdf
172.8 KB
21 Drainage A3.pdf
214.9 KB
22 Bathroom (Part M) A3.pdf
188.1 KB
23 Windows (A) A3.pdf
270.1 KB
24 Windows (B) A3.pdf
107.2 KB
25 Doors (A) A3.pdf
215.6 KB
26 Doors (B) A3.pdf
70.4 KB
27 Kitchen Layout A3.pdf
158.7 KB
3 Site Layout Plan A2.pdf
304.3 KB
3. Preliminary Health and Safety Plan.pdf
2.8 MB
3. QW2_Supplement_3.4.2 Health and Safety B (PSCS).docx
43.4 KB
4 Ground Floor Plan A3.pdf
190.4 KB
5 Roof Layout Plan A3.pdf
181.4 KB
6 Elevations (A) A3.pdf
144.9 KB
7 Elevations (B) A3.pdf
143.9 KB
8 Site Layout Plan A2.pdf
287.1 KB
9 Ground Floor Plan A3.pdf
299.2 KB
Appendix A (Self Declaration).docx
39.2 KB
Appendix B1 (List of Previous Works).docx
32.2 KB
Appendix B2 (Project Execution).docx
27.6 KB
Appendix B3 (Delivery of Services).docx
26.3 KB
Appendix D1 (Surety Company 1).docx
34.4 KB
Appendix D2 (Surety Company 2).docx
28.4 KB
BOQ in excel.xls
162.5 KB
BOQ in pdf.pdf
351.3 KB
FTS_Form of Tender.pdf
228.9 KB
Invitation to Tender.pdf
166.2 KB
ITT_Instructions to Tenderers.pdf
365.7 KB
MF-1.21-18-11-2024_Performance Bond.docx
53.5 KB
MF-1.22-09-04-2020_Appointment of PSCS.docx
36.5 KB
MF-1.23-09-04-2020_Rates of Pay.docx
36.1 KB
PW-CF6_Conditions of Contract.pdf
612.0 KB
TR-200 - Foundation Plan.pdf
353.1 KB
TR-201 - Structural Ground Floor Plan.pdf
339.5 KB
TR-202 - Structural Section A-A.pdf
593.8 KB
Original notice text
This tender involves the demolition of an existing dwelling and the construction of a new single-storey dwelling at Monaraheen, Two Mile Borris, Thurles, Co. Tipperary, including associated site works.
AI analysis updated 4 months ago
Deadline
16 Apr
Buyer
Tipperary County CouncilLocation
Monaraheen, Two Mile Borris, Thurles, Co. Tipperary, Ireland.
Procedure
Open
Clarification
01 Apr 2025
eTenders ID
5251681
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender