← Tenders / Construction of Single House at Ballygar, Co. Galway
Awarded Construction & Civil Engineering Works Open

Construction of Single House at Ballygar, Co. Galway

Value

€300k

Deadline

25 Mar

Construction of a single house in Ballygar, Co. Galway over 6 months

SME fit: Medium Bid effort: Medium 📍 Galway

Construction of a single house in Ballygar, Co. Galway over 6 months

Bidder profile

Mid-sized to large construction firms with experience in public sector projects and compliance with safety regulations.

Risks & flags

  • Turnover threshold
  • Public procurement compliance
  • Insurance requirements

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Galway County Council
Title Construction of Single House at Ballygar, Co. Galway
CPV / category works
Estimated value 300000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 6 months
Submission deadline 2025-03-25T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

Galway County Council ran this procurement for “Construction of Single House at Ballygar, Co. Galway” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • 5 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • PIPEWORK SHALL BE ADEQUATELY SUPPORTED WITH TIMBER BACKING &
  • operations: Explosives must not be used within 400 metres of gas transmission pipelines (30
  • operations: Explosives must not be used within 400 metres of a gas transmission pipeline (30 metres
  • = 100x100 TIMBER PURLIN SUPPORT POST
  • SUPPORTED OFF BLOCKWORK WALL BELOW.
  • TWO COURSES ABOVE PC, RC AND STEEL SUPPORT MEMBERS.
  • JOISTS TO BE SUPPORTED OFF PARTY WALL USING PROPRIETARY
  • JOISTS TO BE SUPPORTED OFF TRIMMERS USING PROPRI
  • JOISTS TO BE SUPPORTED OFF TRIMMERS USING PROPRIETARY JOIST
  • ALL SUPPORT POSTS TO BE SUPPORTED ON EITHER LOAD BEARING
  • Contract arising out of this Competition the successful Tenderer shall be required to supply its Tax Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • CHAMBER EXISTING WATER MAIN (IW ASSET)
  • within 15 metres of an existing gas pipeline
  • information on the site location, any constraints such as existing services or working hours, statutory consents and conditions
  • with the Contracting Authority’s record management and retention policy, a copy of which can be

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € 17 The excess as stated here: Maximum perm; issible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Certifications — Entitles issuing public liability insurance cover must have been granted an authorisation as an insurance undertaking by the Central Bank incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect of de
  • Past experience — not specified for this tender
  • Personnel — Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category15 € 1,750,000; Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[15] € 1,750,000 *
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category15 € 1,750,000
  • The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor € 17 The excess as stated here: Maximum perm
  • issible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 650000019 Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect of de
  • Entitles issuing public liability insurance cover must have been granted an authorisation as an insurance undertaking by the Central Bank incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect of de

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
issible excess on Professional Indemnity Insurance in any one claim below which 2% not stated not stated
ofessional Indemnity Insurance required for € [17] The exces 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
  • [G2314BU0103 (B02) - GA Roof Level Plan.pdf] Legend:
  • [G2314BU0103 (B02) - GA Roof Level Plan.pdf] HANGERS OR EQUAL & APPROVED. IF JOISTS BUILT INTO CAVITY
  • [G2314BU0103 (B02) - GA Roof Level Plan.pdf] STEEL L-STRAPS TO BE FIXED TO MINIMUM
  • [G2314BU0103 (B02) - GA Roof Level Plan.pdf] Galway Office:
  • [G2314BU0103 (B02) - GA Roof Level Plan.pdf] PANCIES SHALL BE BROUGHT TO THE

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-03-25T12:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-03-25T12:00:00+00:00
Date surfaced in documents 18 November 2024
Date surfaced in documents 25 May 2018
Date surfaced in documents Oct 2024

8. Contract terms that matter

Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • The liability of the Surety under this Bond will not exceed € . This amount will be reduced by half on issue of the Certificate of Substantial
  • Hardcore filling used under the slab and thickening should be a minimum of 225mm
  • A minimum of 10 days shall be allowed for review and comment by the Project Engineer from receipt of
  • nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
  • it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
  • the same terms as the insurances the Contractor is required to have under clause 10
  • PIPEWORK SHALL BE ADEQUATELY SUPPORTED WITH TIMBER BACKING &

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: G2314BU0103 (B02) - GA Roof Level Plan.pdf, G2314DG0002 (B02) - Proposed Site Layout.pdf, ITTW4 Instruction to Tender.pdf.
  • eTenders CFT / notice reference: contract notice for the Works to eTenders.1.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: QW2-Part-1-v2.1-18-11-2024-09-01-2025.docx, ITTW4 Instruction to Tender.pdf] Instruction to Tenderers Open Procedure for Works, ITT-W4 v2.0 18/11/2024.

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001

Minimum turnover

€1,750,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€17,000

Scoring

Lowest Price

Documents (71)

PDF

9.1 Site Location 1 - Ballygar.pdf

297.8 KB

PDF

9.1 Site Location 1a - Ballygar.pdf

587.7 KB

PDF

9.21 Design Manual for Quality Housing 2022.pdf

13.4 MB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

31.3 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution (2).docx

26.0 KB

OTHER

Ballygar.e0x

137.1 KB

PDF

CoP_Avoiding_Danger_from_Underground_Services.pdf

837.3 KB

PDF

CoP_ESB_overhead_lines.pdf

591.5 KB

XLSX

Drawing Issue Electrical.xlsx

16.4 KB

XLSX

Drawing Issue Mechanical.xlsx

16.7 KB

PDF

E200_Power & Comms.pdf

3.0 MB

PDF

E300_Lighting Vent Fire.pdf

994.1 KB

PDF

E700_Electrical Schematic.pdf

417.3 KB

PDF

E800_Site Services.pdf

569.4 KB

PDF

E8Y4Y5~N.PDF

360.5 KB

PDF

EA2GRJ~L.PDF

124.0 KB

PDF

Existing Photographic Survey.pdf

31.8 MB

PDF

EYLHCP~5.PDF

268.1 KB

PDF

FS01_Fire Stopping Details.pdf

251.0 KB

DOCX

FTS-6-v1.6-19-07-2023-1 (2).docx

58.4 KB

PDF

G2314BU0100 (B02) - Existing Site Layout - Demolition Works.pdf

343.2 KB

PDF

G2314BU0101 (B02) - GA Ground Floor Plan.pdf

796.1 KB

PDF

G2314BU0102 (B02) - GA Ceiling Level Plan.pdf

890.4 KB

PDF

G2314BU0103 (B02) - GA Roof Level Plan.pdf

448.7 KB

PDF

G2314BU0104 (B01) - GA Section A-A.pdf

213.0 KB

PDF

G2314BU0105-01 (B01) - Proposed Substructure Details (Sheet 01).pdf

205.9 KB

PDF

G2314BU0105-02 (B01) - Proposed Superstructure Details (Sheet 02).pdf

114.6 KB

PDF

G2314BU10000 Site..pdf

773.0 KB

PDF

G2314BU10001-GF Plan..pdf

2.0 MB

PDF

G2314BU10002-GF Plan-Dimensions.pdf

1.9 MB

PDF

G2314BU10003-GF Plan-Radon Sump Layout..pdf

2.0 MB

PDF

G2314BU10004-Section A-A..pdf

495.7 KB

PDF

G2314BU10005-Airtightness..pdf

456.8 KB

PDF

G2314BU10006 Elevations..pdf

308.5 KB

PDF

G2314BU10007-Floor Finishes.pdf

2.0 MB

PDF

G2314BU10008-Ceiling Finishes..pdf

2.2 MB

PDF

G2314BU10009-Wall Finishes..pdf

2.0 MB

PDF

G2314BU10010 Room Data Sheet-Kitchen..pdf

505.1 KB

PDF

G2314BU10011 Room Data Sheet-Utility Room.pdf

360.7 KB

PDF

G2314BU10012 Room Data Sheet-Wc.pdf

446.5 KB

PDF

G2314BU10013 Room Data Sheet-Shower Room..pdf

432.8 KB

PDF

G2314DG0001 (B02) - Existing Site Layout.pdf

277.8 KB

PDF

G2314DG0002 (B02) - Proposed Site Layout.pdf

644.6 KB

PDF

G2314DG0003 (B02) - Site Location Plan.pdf

263.1 KB

PDF

G2314DG0004 (B02) - Proposed Traffic Engineering Layout.pdf

681.3 KB

PDF

G2314RC0001 (B02) - Raft Reinforcement & Setting Out Layout.pdf

389.4 KB

PDF

G2314RP0003 C&S Specifications Document - General.pdf

1.4 MB

PDF

G2314RP0004 C01 Partic Spec Houses.pdf

1.8 MB

PDF

G2314RP0005 D01 Preliminary Health & Safety Plan.pdf

848.2 KB

PDF

GHPOA2~X.PDF

571.1 KB

PDF

Instruction_to_Tender.pdf

647.1 KB

PDF

ITTW4 Instruction to Tender.pdf

1.0 MB

PDF

M101 Heating Services.pdf

895.5 KB

PDF

M101_ Heating Services.pdf

895.5 KB

PDF

M201_Domestic Water Services.pdf

481.4 KB

PDF

M301_Ventilation Services.pdf

1.1 MB

PDF

M401_Above Ground Drainage.pdf

436.3 KB

DOCX

MF-1.21-09-04-2020.docx

52.2 KB

DOCX

MF-1.22-09-04-2020.docx

37.6 KB

DOCX

MF-1.23-09-04-2020.docx

37.0 KB

PDF

ML6G2P~O.PDF

268.8 KB

PDF

MVXVS9~N.PDF

611.2 KB

OTHER

plot.log

996 bytes

PDF

PUC0RH~Q.PDF

605.0 KB

PDF

PW-CF6-v1.14-19-07-2023.pdf

612.0 KB

DOCX

QW-Part-2-v1.1-18-11-2024.docx

58.3 KB

DOCX

QW2-Part-1-v2.1-18-11-2024-09-01-2025.docx

195.3 KB

PDF

QW2_Suitability_Assessment_Open_Form Part 1.pdf

1.4 MB

PDF

QW2_Suitability_Assessment_Open_Form Part 2.pdf

940.1 KB

PDF

Vol.C.pdf

1.7 MB

XLSX

Vol.C.xlsX

132.7 KB

Original notice text

Galway County Council is seeking a contractor for the construction of a single house in Ballygar, Co. Galway, requiring compliance with public procurement standards and specific construction practices.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€300k

Deadline

25 Mar

View on eTenders ↗

Location

Ballygar, Co. Galway, Ireland

Procedure

Open

Clarification

18 Mar 2025

eTenders ID

5223455

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender