Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Invitation to Tender for Port of Cork Phase 4 Upgrade Works
Closed Construction & Civil Engineering Works Open

Invitation to Tender for Port of Cork Phase 4 Upgrade Works

Value

€4.3m

Deadline

22 May

Tender for upgrade works at Port of Cork lasting 2 months

SME fit: Medium Bid effort: Medium 📍 Cork

Tender for upgrade works at Port of Cork lasting 2 months

Bidder profile

Mid-sized to large firms with experience in public sector projects and civil engineering.

Risks & flags

  • Qualification gate
  • Turnover threshold
  • Compliance evidence required

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Port of Cork Company
Title Invitation to Tender for Port of Cork Phase 4 Upgrade Works
CPV / category works
Estimated value 4300000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 2 months
Submission deadline 2025-05-22T16:00:00+00:00
Go-live / start not stated

2. Scope of Work

Port of Cork Company ran this procurement for “Invitation to Tender for Port of Cork Phase 4 Upgrade Works” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • 1 are as follows: Category of Specialist Date for warranty Amount withheld Minimum indemnity limit for professional indemnity insurance Maximum excess for professional indemnity insurance Cathodic Protection System Designer Contract Date €150,000 €1,500,000 2% Fender System Designer Contract Date €150,000 €1,500,000 2%
  • 5 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
    1. It has not been guilty of serious misinterpretation in supplying the information required for the verification of the absence of grounds for exclusion or the fulfilment of the selection criteria, 1. Yes [ ] No [ ]
    1. It has been able, without delay, to submit the supporting documents required by a contracting authority or contracting entity, and 1. Yes [ ] No [ ]
    1. As defined in Article 1 of the Directive 2005/60/EC of the European Parliament and of the Council of 26 October 2005 on the prevention of the use of the financial system for the purpose of money laundering and terrorist financing (OJ L 309, 25.11.2005, p. 15).
    1. As defined in Article 1 of the Directive 2005/60/EC of the European Parliament and of the Council of 26 October 2005 on the prevention of the use of the financial system for the purpose of money laundering and terrorist financing (OJ L 309, 25.11.2005, p. 15).
    1. *Taking into account the character of the crimes committed (punctual, repeated, systematic....) the explanation should show the adequacy of the measures
    1. Taking into account the character of the crimes committed (punctual, repeated, systematic....) the explanation should show the adequacy of the measures to taken.
  • in regards to quality control. Applicants must also provide evidence of a safety management system.
  • Evidence in support of the declarations in Appendix 1 and any requirements set out above must be
  • Applicants may provide third party certification that their safety management system is in Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • overlap a minimum of 100mm onto the existing Marine
  • Health and Safety Policy and Organisation;
  • a general Health and Safety policy document

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor and as PSCS and Designer € 1,500,00017 The excess as stated here: Maximum perm; issible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor and as PSCS and Designer will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — 1 18-11-2024 Turnover Requirement Area of Business/Work: Minimum Average Yearly Turnover arising from the area of work specified: Civil Engineering 15 € 2,500,000 CA SUPPLEMENTARY REQUIREMENTS: Click or
  • Geographic / facility constraints — 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 19 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro) Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • 1 18-11-2024 Turnover Requirement Area of Business/Work: Minimum Average Yearly Turnover arising from the area of work specified: Civil Engineering 15 € 2,500,000 CA SUPPLEMENTARY REQUIREMENTS: Click or
  • The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor and as PSCS and Designer € 1,500,00017 The excess as stated here: Maximum perm
  • issible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor and as PSCS and Designer will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,00019 Maximum level of excess for property only* for any one incident below which the Works Contractor and as PSCS will bear the cost: € 10,000 *No excess is permitted in respect of de
  • 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 19 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro)

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
issible excess on Professional Indemnity Insurance in any one claim below which 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 19 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro)
  • CVs are to include details of experience for a minimum of 3 No
  • CVs are to include of experience for a minimum of 3 No
  • [Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx] Applicants must complete Tables A, B & C below.
  • [Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx] ([8]);* 3. Fraud([9]); 4. Terrorist offences or offences linked to terrorist activities ([10]); 5. Money laundering or terrorist financing ([11]); 6. Child labour and other forms of trafficking in human beings ([12]). Yes [ ] No [ ] [If the relevant documentation is available electronically, please indicate the web address, issuing authority or body, precise reference of the documentation. Click here and insert details] ([13]).
  • [Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx] here and insert details] ([15])

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2025-05-22T16:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2025-05-22T16:00:00+00:00
Date surfaced in documents 24 October 2008
Date surfaced in documents 22 July 2003
Date surfaced in documents 13 June 2002

8. Contract terms that matter

Contract duration in the extract: 2 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • Within 3 months after receipt of the Contractor’s final statement, the Employer’s
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
  • the date 10 days before the last day for receipt of the
  • 2 shall be final and binding on the Parties unless, within 28 days after receiving notice of the determina
  • Within 14 days of receipt of the payment claim notice
  • Within 3 months after receipt of the Contractor’s final
  • Employer, the Contractor shall pay the amount due within 14 days of receipt of the

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: not later than 5 days after the date agreed between the
  • Within 14 days of receipt of the payment claim notice
  • pay the amount due on the invoice within 21 days after receiving the invoice
  • If, within 14 days of the issue of the certificate of Subs
  • 3 within 21 days after receiving the invoice [less any a
  • Within 2 months after Substantial Completion of the Wor
  • Within 3 months after receipt
  • Within 3 months after receipt of the Contractor’s final
  • As soon as practicable, no more than 3 months, after the Defects Certificate is issue
  • Employer shall pay the amount due on the invoice within 21 days after receiving the invoice
  • Employer, the Contractor shall pay the amount due within 14 days of receipt of the
  • amount due shall be paid within 30 days of receipt of a demand for payment

TENDER DOCUMENTS [Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx, [

[Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx, Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Click here and

[Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx, Click here and insert

[Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx, 24200-MWP-02-00-DR-S-0200 - SITE LOCATION PLAN.pdf.

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€2,500,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Documents (80)

PDF

24200-MWP-00-00-DR-S-0001 - OVERALL SITE LOCATION MAP.pdf

856.1 KB

PDF

24200-MWP-00-00-DR-S-0002 - ADMIRALTY CHARTS.pdf

8.2 MB

PDF

24200-MWP-00-00-DR-S-0003 - SITE COMPOUND AN UPPER HARBOUR SITE ACCESS - OPTION 1.pdf

5.7 MB

PDF

24200-MWP-00-00-DR-S-0004 - SITE COMPOUND AN UPPER HARBOUR SITE ACCESS - OPTION 2.pdf

5.7 MB

PDF

24200-MWP-00-00-DR-S-0005 - SITE COMPOUND AND LOWER HARBOUR SITE ACCESS.pdf

529.8 KB

PDF

24200-MWP-01-00-DR-S-0100 - SITE LOCATION PLAN.pdf

2.2 MB

PDF

24200-MWP-01-01-DR-S-0101 - BULK JETTY - EXISTING CROSS SECTIONS AND LEVELS.pdf

1.2 MB

PDF

24200-MWP-01-01-DR-S-0102 - BULK JETTY - PROPOSED CONCRETE REPAIR WORKS.pdf

1.1 MB

PDF

24200-MWP-01-01-DR-S-0103 - BULK JETTY - PROPOSED CONCRETE ENCASEMENT REPAIRS WORKS-.pdf

1.3 MB

PDF

24200-MWP-01-01-DR-S-0104 - BULK JETTY - PROPOSED FENDER REPAIR WORKS.pdf

2.0 MB

PDF

24200-MWP-01-01-DR-S-0105 - BULK JETTY - PROPOSED CATHODIC PROTECTION REQUIREMENTS.pdf

2.8 MB

PDF

24200-MWP-01-01-DR-S-0106 - BULK JETTY - SITE CLEARANCE FOR CATHODIC PROTECTION WORK.pdf

3.2 MB

PDF

24200-MWP-01-02-DR-S-0111 - CONTAINER BERTH -PROPOSED SITE LAYOUT AND LEVELS.pdf

1.4 MB

PDF

24200-MWP-01-02-DR-S-0113 - CONTAINER BERTH - PROPOSED CATHODIC PROTECTION REQUIREMENTS.pdf

2.5 MB

PDF

24200-MWP-01-02-DR-S-0114 - CONTAINER BERTH - FENDER REPAIR REPLACEMENT WORKS.pdf

3.0 MB

PDF

24200-MWP-01-03-DR-S-0120 - RO-RO BERTH & OIL- GAS JETTY LAYOUT.pdf

1.7 MB

PDF

24200-MWP-01-03-DR-S-0121 - RO-RO BERTH - SHEET PILED WALL PLAN AND LEVELS.pdf

2.3 MB

PDF

24200-MWP-01-03-DR-S-0122 - RO-RO BERTH - PROPOSED CATHODIC PROTECTION REQUIREMENTS.pdf

3.0 MB

PDF

24200-MWP-01-04-DR-S-0131 - OIL & GAS JETTY - SITE LAYOUT AND LEVELS.pdf

1.7 MB

PDF

24200-MWP-01-04-DR-S-0132 - OIL & GAS JETTY - PROPOSED CATHODIC PROTECTION REQUIREMENTS.pdf

1.7 MB

PDF

24200-MWP-01-04-DR-S-0133 - OIL & GAS JETTY - PROPOSED CONCRETE REPAIR WORKS.pdf

1.8 MB

PDF

24200-MWP-02-00-DR-S-0200 - SITE LOCATION PLAN.pdf

589.7 KB

PDF

24200-MWP-02-01-DR-S-0201 - RO-RO JETTY PROPOSED CONCRETE REPAIR WORKS.pdf

821.1 KB

PDF

24200-MWP-02-01-DR-S-0203 - RO-RO JETTY - REPLACEMENT FENDER REQUIREMENTS - Copy.pdf

657.0 KB

PDF

24200-MWP-02-01-DR-S-0203 - RO-RO JETTY - REPLACEMENT FENDER REQUIREMENTS.pdf

657.0 KB

PDF

24200-MWP-02-01-DR-S-0204 - RO-RO LINKSPAN PONTOON - PROPOSED CATHODIC PROTECTION REQUIREMENTS.pdf

2.5 MB

PDF

24200-MWP-02-01-DR-S-0205 - RO-RO LINKSPAN PONTOON - OPERATING LEVELS.pdf

1.2 MB

PDF

24200-MWP-02-01-DR-S-0206 - RO-RO LINKSPAN PONTOON - PROPOSED PAINT REPAIRS WORKS.pdf

1.7 MB

PDF

24200-MWP-02-02-DR-S-0210 - DEEP WATER BERTH - FENDER PANEL FACINGS REPLACEMENT.pdf

2.3 MB

PDF

24200-MWP-02-03-DR-S-0220 - ADM JETTY LAYOUT.pdf

895.2 KB

PDF

24200-MWP-02-03-DR-S-0221 - ADM JETTY LAYOUT - PROPOSED CONCRETE REPAIR WORKS.pdf

1.2 MB

PDF

24200-MWP-02-03-DR-S-0222 - ADM JETTY LAYOUT - PROPOSED BERTHING STRUCTURE MAINTENANCE WORKS.pdf

1.4 MB

PDF

24200-MWP-02-03-DR-S-0223 - ADM JETTY LAYOUT - PROPOSED PILE REPAIR WORKS.pdf

780.6 KB

PDF

24200-MWP-02-03-DR-S-0224 - ADM JETTY LAYOUT - PROPOSED CONCRETE ENCASEMENT REPAIR WORKS.pdf

985.0 KB

PDF

24200-MWP-02-03-DR-S-0225 - ADM JETTY LAYOUT - PROPOSED BERTHING STRUCTURE FENDER REPLACEMENT WORKS.pdf

921.2 KB

PDF

24200-MWP-03-00-DR-S-0300 - SITE LOCATION PLAN.pdf

453.7 KB

PDF

24200-MWP-03-01-DR-S-0301 - CRUISE LINER TERMINAL LAYOUT.pdf

612.8 KB

PDF

24200-MWP-03-01-DR-S-0302 - CRUISE LINER TERMINAL MOORING DOLPHINS - PROPOSED CATHODIC PROTECTION.pdf

699.9 KB

PDF

24200-MWP-03-01-DR-S-0303 - CRUISE LINER TERMINAL - PROPOSED RECESS MODIFICATION AND LADDER DETAILS.pdf

1.4 MB

PDF

24200-MWP-03-02-DR-S-0311 - JFK PIER LAYOUT.pdf

801.1 KB

PDF

24200-MWP-03-02-DR-S-0312 - JFK PIER - PROPOSED CONCRETE REPAIR WORKS.pdf

1.0 MB

PDF

24200-MWP-03-02-DR-S-0313 - JFK PIER - PROPOSED PILE UPGRADE WORKS.pdf

1.3 MB

PDF

24200-MWP-03-03-DR-S-0321 - PILOT BOAT HARBOUR LAYOUT.pdf

495.8 KB

PDF

24200-MWP-03-03-DR-S-0322 - PILOT BOAT HARBOUR - PROPOSED CONCRETE REPAIRS WORKS.pdf

875.7 KB

PDF

24200-MWP-04-00-DR-S-0400 - SITE LOCATION PLAN.pdf

379.4 KB

PDF

24200-MWP-05-00-DR-S-0500 - SITE LOCATION PLAN.pdf

425.5 KB

PDF

24200-MWP-05-01-DR-S-0501 - CURRABINNY PIER - EXISTING LAYOUT DETAILS - SHEET 1.pdf

1.4 MB

PDF

24200-MWP-05-01-DR-S-0502 - CURRABINNY PIER - EXISTING LAYOUT DETAILS - SHEET 2.pdf

987.7 KB

PDF

24200-MWP-05-01-DR-S-0503 - CURRABINNY PIER - PROPOSED LAYOUT DETAILS-SHEET 1.pdf

1.2 MB

PDF

24200-MWP-05-01-DR-S-0504 - CURRABINNY PIER - PROPOSED LAYOUT DETAILS-SHEET 2.pdf

596.0 KB

PDF

24200-MWP-06-00-DR-S-0600 - SITE LOCATION PLAN.pdf

402.8 KB

PDF

24200-MWP-06-01-DR-S-0601 - TUG BERTHING STRUCTURE - EXISTING LAYOUT.pdf

1.2 MB

PDF

24200-MWP-06-01-DR-S-0602 - TUG BERTHING STRUCTURE - PROPOSED UPGRADE WORKS.pdf

1.0 MB

PDF

24200-MWP-07-00-DR-S-0700 - SITE LOCATION PLAN.pdf

501.5 KB

PDF

24200-MWP-07-01-DR-S-0701 - CROSSHAVEN PIER - PROPOSED CATHODIC PROTECTION REQUIEMENTS.pdf

1.3 MB

XLSX

24200-MWP-XX-XX-BQ-S-6001-P01-Volume C-PD.xlsx

70.1 KB

PDF

24200-MWP-XX-XX-CT-C-6001-P02-ITT-W2-v3.0.pdf

461.2 KB

PDF

24200-MWP-XX-XX-CT-C-6006-P02-Volume B-FTS5.pdf

489.3 KB

PDF

24200-MWP-XX-XX-CT-C-6051-P03-ITT Appendix 5-Technical Merit Criteria.pdf

249.5 KB

PDF

24200-MWP-XX-XX-CT-S-6002-P01-3.4.1-HS-Works-Contractor.pdf

227.9 KB

DOCX

24200-MWP-XX-XX-CT-S-6002-P01-QW-Part-2.docx

58.5 KB

PDF

24200-MWP-XX-XX-CT-S-6002-P01-QW2-Part-1.pdf

621.7 KB

PDF

24200-MWP-XX-XX-CT-S-6003-P01-3.4.2-HS-PSCS.pdf

273.7 KB

PDF

24200-MWP-XX-XX-HS-S-6001-P01-PSHP.pdf

944.6 KB

PDF

24200-MWP-ZZ-ZZ-SP-S-6002-P02-Volume A-WR.pdf

2.5 MB

PDF

24200-PoC Phase 4 Upgrade Works-Site Photographs.pdf

8.5 MB

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

37.8 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

31.3 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

26.0 KB

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

25.6 KB

DOCX

Appendix-C-Bankers-Letter.docx

29.9 KB

PDF

Marine Pile Repairs by Concrete Encasement - ICE 2011.pdf

968.5 KB

PDF

Pile Jackets - Flexible Formwork.pdf

3.9 MB

PDF

PL4.2.1.1-Rockbond-Underwater-Mortars-UWMs-June-2022.pdf

28.9 KB

PDF

PW-CF3-v2.8-01-05-2024.pdf

1.3 MB

PDF

SeaShield 2000FD - Engineering Specification - (D).pdf

289.1 KB

PDF

SeaShield 2000FD Anode Bracket IFU (D).pdf

538.5 KB

XLSX

Vessels on berth 2018 to 2025.xlsx

3.5 MB

PDF

WCD-SeaShield-2000FD-IFU_JAN-2022-LR (2).pdf

3.4 MB

PDF

WCD-SeaShield-2000FD-Raker-Pile-IFU_JAN-2022 (1).pdf

1.2 MB

Original notice text

The Port of Cork Company invites tenders for Phase 4 upgrade works, focusing on building, integrating, and operating specified services with compliance reporting and handover obligations.

AI analysis updated 4 months, 1 week ago

Bid ↗
Details

Value

€4.3m

Deadline

22 May

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

02 May 2025

eTenders ID

5222101

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender